massaro – since 1967 · microsoft powerpoint - bphs progress slide show 03-26-10 author: cderito...

14
Over years of Service EXCELLENCE Service Integrity Hard Work STABILITY Q li TRUST H Quality Team Work Honesty Customer SATISFACTION Massaro – since 1967

Upload: others

Post on 22-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Over

yearsof

ServiceEXCELLENCEService

IntegrityHard Work

STABILITYQ li

TRUST

HQualityTeam Work

Honesty

MassaroCustomer SATISFACTION

Massaro – since 1967

Page 2: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Bethel Park High SchoolBethel Park, PA

Weekly Progress Slide ShowWeekly Progress Slide ShowMarch 26, 2010

Massaro

Page 3: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Waterproofing and Insulation Continue

Massaro

Page 4: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Grade Beams are Being Poured and Excavated

Massaro

Page 5: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Area D Progressingg g

Massaro

Page 6: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Forms Are Being Placed and Stripped In Several Areas

Massaro

Page 7: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Chemical Lab Acid Neutralizing Tank

Massaro

Page 8: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Area D Footing Foundation g

Massaro

Page 9: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Underground MEP Items Continue

Massaro

Page 10: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Steel Being Tiedg

Massaro

Page 11: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Area H Wall Stripped

Massaro

Page 12: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Safety Break Lunch 2!y

With An Appearance FromThe School District

Massaro

Page 13: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Scheduled Work For Next Few Weeks:

• Building foundations and wall formingBuilding foundations and wall forming.• Several Walls and Grade Beams Poured.

C ti t k il il t bili ti it• Continue stock pile, soil stabilization items and back fill operations.

• Waterproofing in areas C, F, and H.• Area D Concrete Work.• Underground building MEP items.• Steel Fabrication continues at Sippel Fab

Massaro• Steel Fabrication continues at Sippel Fab.

Page 14: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM

Thank You The End

By Jeremy Beitery Je e y e teIntern, Massaro CMS, LLC

Massaro