Massaro – since 1967
![Page 2: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/2.jpg)
Bethel Park High SchoolBethel Park, PA
Weekly Progress Slide ShowWeekly Progress Slide ShowMarch 26, 2010
Massaro
![Page 3: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/3.jpg)
Waterproofing and Insulation Continue
Massaro
![Page 4: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/4.jpg)
Grade Beams are Being Poured and Excavated
Massaro
![Page 5: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/5.jpg)
Area D Progressingg g
Massaro
![Page 6: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/6.jpg)
Forms Are Being Placed and Stripped In Several Areas
Massaro
![Page 7: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/7.jpg)
Chemical Lab Acid Neutralizing Tank
Massaro
![Page 8: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/8.jpg)
Area D Footing Foundation g
Massaro
![Page 9: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/9.jpg)
Underground MEP Items Continue
Massaro
![Page 10: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/10.jpg)
Steel Being Tiedg
Massaro
![Page 11: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/11.jpg)
Area H Wall Stripped
Massaro
![Page 12: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/12.jpg)
Safety Break Lunch 2!y
With An Appearance FromThe School District
Massaro
![Page 13: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/13.jpg)
Scheduled Work For Next Few Weeks:
• Building foundations and wall formingBuilding foundations and wall forming.• Several Walls and Grade Beams Poured.
C ti t k il il t bili ti it• Continue stock pile, soil stabilization items and back fill operations.
• Waterproofing in areas C, F, and H.• Area D Concrete Work.• Underground building MEP items.• Steel Fabrication continues at Sippel Fab
Massaro• Steel Fabrication continues at Sippel Fab.
![Page 14: Massaro – since 1967 · Microsoft PowerPoint - BPHS Progress slide show 03-26-10 Author: cderito Created Date: 3/26/2010 2:58:18 PM](https://reader036.vdocuments.us/reader036/viewer/2022071117/600167f8778bec75d825bea1/html5/thumbnails/14.jpg)
Thank You The End
By Jeremy Beitery Je e y e teIntern, Massaro CMS, LLC