BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
1 | P a g e
UPDATED FORM – 1
SUBMISSION
TO
MINISTRY OF ENVIRONMENT & FORESTS & CLIMATE CHANGE,
NEW DELHI
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
[AMENDMENT TO ENVIRONMENTAL CLEARANCE]
VILLAGE : BISHUNAPUR
TEHSIL : BALRAMPUR
DISTRICT : BALRAMPUR
STATE : UTTAR PRADESH
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
2 | P a g e
FORM – 1
Sl.
No.
Information/ Checklist
Confirmation
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
1 Name of the Project Balrampur Chini Mills Ltd; Chemical Division,
Distt. Balrampur (UP)- 271201
2 Project Sector Industrial Project (Industry - II)
3 Sr. No in the Schedule Schedule 5(g) under category–A of EIA
Notification dated 14th September 2006.
4 Proposed capacity/Area/length
/tonnage to be
handled/command area/lease
area/number of wells to be
drilled.
The present proposal is Amendment in EC of
160 KLPD Distillery Plant at Specific
Condition No: 01 in amended EC dated 21st
December 2015:
Increase in no. of operational days of
Distillery from 330 Days to 365 Days / Year
5 New/Expansion/Modernization The present proposal is request amendment in
Specific Condition No: 01 in amended EC dated
21st December 2015: Increase in no. of operational days of Distillery
from 330 Days to 365 Days / Year
6 Existing capacity / Area Etc EC has been accorded by MOEF to the 160 KLPD
Distillery plant vide order no. J–11011/151/2006 –
IA II (I) dated December 21st, 2015 and 20th June
2006
7 Category of project i.e. ‘A’ or
‘B’.
A
8 Does it attract the General
condition? If yes, please specify.
NO
9 Does it attract the specific
condition? If yes, please specify
NO
10 Location
Village
Tehsil
Block
District
State
Bishunapur
Balrampur
Balrampur
Balrampur
Uttar Pradesh
11 Nearest railway station/airport
along with distance in Kms.
Railway Station: Balrampur Railway station : 2.9
km in north direction.
Airport : Gorakhpur Airport : 168.7 km in NEE
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
3 | P a g e
12 Nearest town, City, District
Headquarters along with distance
in Kms.
Balrampur : 4.1 km in North .
13 Village Panchayats,
ZillaParishad, Municipal
Corporation, Local body
(Complete postal addresses with
telephone nos to be given)
Municipal Board Balrampur
14 Name of the applicant Balrampur Chini Mills ; Chemical Division ,
Balrampur
15 Registered address Village : Bishunapur, P.O. Balrampur, Distt. :
Balrampur UP
FAX : 05263-235051
Phone No : 05263 - 235052
16
Address for correspondence Village : Bishunapur, P.O. Balrampur, Distt. :
Balrampur UP
Name Mr N.K. Khetan
Designation Executive President
Address Village : Bishunapur, P.O. Balrampur, Distt. :
Balrampur UP
Pin Code 271201
E-mail nk.khetan@bcml.in
Telephone No. +919793124466
17 Details of Alternatives sites
examined, if any. Location of
these sites should be shown on a
topo sheet.
No alternate sites are considered as the present
proposal is only request for amendment to EC
accorded vides reference cited above.
18 Interlinked Project No
19 Whether separate application of
interlinked project has been
submitted?
No
20 If yes, date of submission Not applicable
21 If no, reason Present proposal only for amendment to EC
22 Whether the proposal involves
approval/clearance under: If
yes, details of the same and
their status to be given.
The forest (Conservation)
Act, 1980.
No any
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
4 | P a g e
The wildlife (Protection)
Act, 1972
The C.R.Z. Notification,
1992
23 Whether there is any
Government Order/Policy
relevant/relation to the site
No any
24 Forest land involved (Hectares) No any
25 Whether there is any litigation
pending against the project
and/or land in which the project
is propose to be set up?
Name of the Court
Case No
Orders/directions of the
court, if any and its
relevance with the proposed
project.
No any
26 Project Cost No Change in cost which we have presented
previously.
(II) ACTIVITY
1. Construction, operation or decommissioning of the Project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
1.1 Permanent or temporary change in land
use, land cover or topography including
increase in intensity of land use (with
respect to local land use plan)
No No extra land is required for this amendment
proposal.
The above proposal involves increase in number
of days.
For the above unit, Environmental Clearance was
accorded by Honorable Ministry vide order no. J-
11011/151/2006-IA II (I) dated 21-12-2015.
1.2 Clearance of existing land, vegetation
and buildings?
No The proposed increase in no. of operational days
of existing Distillery and does not involve any
clearance of existing land, vegetation and
buildings.
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
5 | P a g e
1.3 Creation of new land uses? No No other land use other than industrial will be
created in the existing plant premises
1.4 Pre-construction investigations e.g.
bore houses, soil testing?
No As plant has already been constructed and in
operation, no such investigations or tests are
envisaged.
1.5 Construction works? No Nil
1.6 Demolition works? No No demolition works are envisaged as the present
proposal is only request for amendments to
increase of no. of operational days of existing
Distillery.
1.7 Temporary sites used for construction
works or Housing of construction
workers?
No Amendments to increase of no. of operational days of
existing Distillery. Hence no temporary sites for
construction workers will be constructed.
1.8 Above ground buildings, structures or
earthworks including linear structures,
cut and fill or excavations
Nil Nil
1.9 Underground works including mining
or tunneling?
No NA
1.10 Reclamation works? No No such work will be involved in present a
proposal.
1.11 Dredging? No No such work will be involved in present
proposal.
1.12 Offshore structures? No No such work will be involved in present
proposal.
1.13 Production and manufacturing
processes?
No The process of Fermentation & Distillation
already exists and there is no change.
1.14 Facilities for storage of goods or
materials?
No No additional storage of goods or materials is
envisaged.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents?
No Spent wash will be concentrated in multiple
effect evaporator (MEE) and then Slop is being
burn in incineration boiler (Slop fired travelling
grate).
Due to the above treatment system we can
operate distillery during rainy season also.
In view of the above, we request Honorable
Ministry to permit us to operate Distillery for
365.0 days / Annum.
1.16 Facilities for long term housing of
operational workers?
Yes Housing colonies available within the premises
and is being utilized.
1.17 New road, rail or sea traffic during No Already existing roads to the factory are being
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
6 | P a g e
construction or operation? utilized. No new roads envisaged as a part of this
proposed amendments.
1.18 New road, rail, air waterborne or other
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
No Already existing roads to the factory are being
utilized. No new roads envisaged as a part of this
proposed amendments.
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No Already existing roads to the factory are being
utilized. No closure of roads or diversion is
envisaged as a part of this proposed amendment.
1.20 New or diverted transmission lines or
pipelines?
No No new or diversion of transmission lines or
pipelines is proposed as a part of this proposed
amendments.
1.21 Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or aquifers?
No No impoundment, damming, culverting,
realignment or other changes to the hydrology of
watercourses or aquifers is envisaged.
1.22 Stream crossings? No Not Applicable as no stream crossings exists in
the Plant site.
1.23 Abstraction or transfers of water form
ground or surface waters?
Yes The total water requirement for the Distillery unit
is 1540.0 m3/day @ 9.63 KL/KL of alcohol.
Industrial Purposes : 1540.0 m3/day
There is not be any increase in water requirement.
In fact the water requirement is being reduced
due to extraction and recycle of water (MEE
condensate) from Evaporator.
1.24 Changes in water bodies or the land
surface affecting drainage or run-off?
No There will not be any change in water bodies or
the land surface affecting drainage or run-off due
to the proposed amendments.
1.25 Transport of personnel or materials for
construction, operation or
decommissioning?
No There will not be increase in traffic during
operation as no capacity enhancement is
proposed.
1.26 Long-term dismantling or
decommissioning or restoration works?
No No dismantling or decommissioning or
restoration works are envisaged.
1.27 Ongoing activity during
decommissioning which could have an
impact on the environment?
No No decommissioning activities are involved as a
part of these proposed amendments.
1.28 Influx of people to an area in either
temporarily or permanently?
No No Influx of people to an area in either
temporarily or permanently is anticipated.
1.29 Introduction of alien species? No There will not be any introduction of alien
species.
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
7 | P a g e
1.30 Loss of native species or genetic
diversity?
No There will not be loss of native species or
Genetic diversity.
1.31 Any other actions? No Nil
2. Use of natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short
supply)
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
2.1 Land especially undeveloped or
agricultural land (ha)
No No additional land is envisaged for the proposed
amendment of increase in no. of operational days.
2.2 Water (expected source & competing
users) unit: KLD
Yes The total water requirement for the existing
Distillery unit is 1540.0 m3/day @ 9.63 KL/KL
of alcohol.
Industrial Purposes : 1540.0 m3/day
The water required which is being met from
ground water for the plant.
Recycling of waste water is being increased so
that water requirement for the plant will further
reduce.
2.3 Minerals (MT) No No usage of minerals is envisaged
2.4 Construction material – stone,
aggregates, sand / soil (expected source
– MT)
No NA
2.5 Forests and timber (source – MT) No -
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel
(MT), energy (MW) \
Yes Power generation : 6 MW
Power requirement: 2.5 – 3.0 MW use in self
consumption and surplus power will be export to
state power grid.
Fuel : Bagasse : 204 TPD
SLOP: 312 TPD
2.7 Any other natural resources (use
appropriate standard units)
No Nil
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
8 | P a g e
3. Use, storage, transport, handling or production of substances or materials, which could
be harmful to human health or the environment or raise concerns about actual or
perceived risks to human health
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
3.1 Use of substances or materials,
which are hazardous (as per MSIHC
rules) to human health or the
environment (flora, fauna, and water
supplies) .
Yes Used oil generated is being given to SPCB
authorized recyclers.
3.2 Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No No effect envisaged
3.3 Affect the welfare of people e.g. by
changing living conditions?
Yes The existing unit enabled local villagers to get
employment and improved the business
opportunities to the locals.
3.4 Vulnerable groups of people who could
be affected by the project e.g. hospital
patients, children, the elderly etc.,
No No any
3.5 Any other causes No --
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
4.1 Spoil, overburden or mine wastes. No Not applicable as it is a Distillery unit
4.2 Municipal waste (domestic and or
commercial wastes)
No Municipal waste generated is being disposed to
authorized Municipal authorities.
4.3 Hazardous wastes (as per Hazardous
Waste Management Rules)
Yes
Used oil is being disposed to SPCB authorized
recyclers.
Other Industrial Wastes
4.4 Surplus product No No any
4.5 Sewage sludge or other sludge from
effluent treatment.
Yes Sewage sludge is being treated in septic tank and
soak pit.
Secondary ETP sludge: 0.5 KLPD, used as
manure for horticulture purposes.
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
9 | P a g e
4.6 Construction and demolition wastes No NA
4.7 Redundant machinery or equipment No NA
4.8 Contaminated soil and other materials No NA
4.9 Contaminated soils and other materials No NA
4.10 Agriculture Waste No NA
4.11 Other solid waste Yes Fermenter Sludge : 15.4 Ton/Day
Total Fly ash generation : 59 Ton/Day
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
5.1 Emissions from combustion of fossil
fuels from stationary or mobile
sources
Yes A 40 TPH slop fired Travelling grate Boiler is
install. Boiler operations result in emissions. A 70
m stack along with 40 TPH boiler, with ESP as
APCS. The stack is made up of RCC with internal
fire-brick lining.
The exhaust gases from the ESP is discharged
into the atmosphere through a stack of adequate
height for effective dispersion of gases into the
atmosphere as per CPCB norms for effective
dispersion of PM, emissions into the atmosphere.
5.2 Emissions from production
processes
Yes PM ,NOX,SO2,CO
5.3 Emissions from materials handling
including storage or transport
Yes Dust emissions and fugitive emissions shall arise
from material handling and transport. The control
measures shall include concrete/asphalt road
construction, water sprinkling, tarpaulin cover on
trucks carrying materials and covered storage yard
for fuel.
5.4 Emissions from construction
activities including plant and
equipment
No The present proposal involves installation of ESP
which requires minor construction activities.
5.5 Dust or odours from handling of
materials including construction
No These activities shall be for a short duration and
their impact shall be minimized by taking the
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
10 | P a g e
materials, sewage and waste following measures:
Water sprinkling
Use of dust arresting panels/ sheets
Regular removal of construction waste
material
Proper storage of construction material
Use of cover on trucks
Speed limit for vehicles
There is no dust generation as ESP are installed to
the new boiler.
5.6 Emissions from incineration of waste No ESP is installed along with 70 Meter proposed
Stack. Hence no emissions will occur.
5.7 Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No Not applicable
5.8 Emissions from any other sources No Not Applicable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
No All equipment’s installed in the unit are of
standard make manufactured as per noise
regulations stipulated by MoEF.
During operation phase, noise shall be generated
by the operation of pumps, air compressors,
boilers, TG set etc. as open structure is there, no
abnormal sound level is expected. Persons
working in the high noise area are being provided
the required earplugs & earmuffs.
6.2 From industrial or similar processes No All equipment’s installed in the unit are of
standard make manufactured as per noise
regulations stipulated by MoEF. The ambient
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
11 | P a g e
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
7.1 From handling, storage, use or
spillage of hazardous materials
No Used oil is being disposed to SPCB authorized
recyclers
7.2 From discharge of sewage or other
effluents to water or the land
(expected mode and place of
discharge)
No It is ZERO discharge unit.
No waste water is disposed to outside plant premise.
Sanitary waste water generated is being treated in
septic tank followed by soak pit and STP.
Spent wash is being concentrated in MEE and
concentrated MEE is being incinerated in Slop fired
boiler.
7.3 By deposition of pollutants emitted to
air into the land or into water
No Existing 70m stack with ESP provided for the
boiler.
7.4 From any other sources No
7.5 Is there a risk of long term build up
of pollutants in the environment
from these sources?
No
noise levels in the plant are well within the
standards stipulated by MoEF.
6.3 From construction or demolition. No NA
6.4 From blasting or piling No Not Applicable.
6.5 From construction or operational
traffic
No NA
6.6 From lighting or cooling systems No Not applicable
6.7 From any other sources No Not applicable
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
12 | P a g e
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment
Sl.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
8.1 From explosions, spillages, fires etc
from storage handling, use or
production of hazardous substances
No No such hazardous substances which lead to
explosions, spillages, fires etc from storage, handling
are being utilized or produced in the existing unit
8.2 From any other causes No Not applicable
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g. floods,
earthquakes, landslides, cloud burst
etc)?
Yes There are very less chances of natural disaster
causing environmental changes but as per our proper
Disaster management Plan & Environment
Management Plan if it will occur then we will try to
minimize the impacts of Natural Disaster on project.
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality
Sl.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
9.1 Lead to development of
supporting facilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
-Supporting infrastructure
(roads, power supply, waste or
waste water treatment, etc.)
No The existing unit has enabled the local to get
employment and also increased the business
opportunities to the locals
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
13 | P a g e
- housing development
- extractive industries
- supply industries.
- other
9.2 Lead to after-use of the site,
which could have an impact on
the environment
No All precautionary measures are being taken in the unit
to avoid any impact on plant site.
9.3 Set a precedent for later
developments
Yes It will increase Ethanol production of the country,
which in turn in the long run could lead to further
industrial development and considerable savings of
Petrol.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects.
No The existing unit is an isolated industry and not in
cluster. A better planned and executed project has to
yield a better result individually.
(III) ENVIRONMENTAL SENSITIVITY
Sl. No. Areas Name/
Identity
Aerial distance (within 15 km.) of proposed
project location boundary
1 Areas protected under
international conventions
national or local legislation for
their ecological, landscape
cultural or other related value
No No any
2 Areas which are important or
sensitive for ecological reasons
(Wetlands, watercourses or
other water bodies, coastal
zone, biospheres, mountains,
forests)
No River Rapti : 7.57Km in North direction.
3 Areas used by protected,
important or sensitive species of
No No any
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
14 | P a g e
flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
4 Inland, coastal, marine or
underground waters
No
5 State, National boundaries No
6 Routes or facilities used by the
public for access to recreation
or other tourist, pilgrim areas
No
7 Defense installations No
8 Densely populated or built-up
area
No The proposed project site lies in the vicinity
of city : Balrampur – 4.1 km
9 Areas occupied by sensitive
man-made land uses (hospitals,
schools, places of worship,
community facilities)
No Some such areas exist in city : Balrampur –
4.1 km
10 Areas containing important,
high quality or scarce resources
(ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals.)
No No such area exists.
11 Areas already subjected to
pollution or environmental
damage (those where existing
legal environmental standards
are exceeded)
No No such area exists.
12 Areas susceptible to natural
hazard which could cause the
project to present
environmental problems
(earthquakes, subsidence,
landslides, erosion, flooding or
No The proposed project area lies in Zone IV
Seismic area. All necessary design
considerations for earthquake resistant
structures shall be incorporated in the design
of the project.
BALRAMPUR CHINI MILLS LTD, CHEMICAL DIVISION
15 | P a g e
extreme or adverse climatic
conditions)
I hereby give an undertaking that the data and information given in the application and enclosures are
true to the best of my knowledge and belief and I am aware that if any part of the data and information
submitted is found to be false or misleading at any stage, the project will be rejected and clearance
given, if any to the project will be revoked at our risk and cost.
Date : 10.10.2018
Place : Balrampur
Balrampur Chini Mills ltd
(Chemical Division) Distt. Gonda.