companyanilandanil.com/wp-content/uploads/2016/01/profile.pdflook at a day when you are supremely...
Post on 18-Mar-2018
218 Views
Preview:
TRANSCRIPT
COMPANY PROFILE
CONTENTS
FIRM HISTORY
TURNOVER
ASSESTS OWNED BY ANIL & ANIL
IBA APPROVED & BANKERS NAME
NAME OF PARTNERS & MANAMGEMENT
COMMITEMENTS IN HANDS
VALUED CLIENTS
BRANCH LIST
MILESTONES
CAPABILITIES
GOOD SERVICE CERTIFICATE
CERTIFICATE OF INDIAN BANK’S ASSOCIATION
CERTIFICATE OF ISO 2001:2008
[EQFS CERTIFICATION PVT. LTD., DELHI]
CONTACTS
03
04
05
08
09
11
20
21
22
22
23
24
25
26
02
ABOUT US
ESTABLISHED IN : 1990
TYPE OF FIRM : Partnership Firm
HEAD QUARTER : Baroda, Gujarat
25, JALARAM CHAMBERS, JALARAM MARG,
KARELIBAUG, VADODARA-390018
We introduce ourselves as one of the leading Bank approved transport
contractor, rendering quick and prompt services throughout the country.
We have fleet of vehicles with National Permit under our own control. We
have expert staff members to carry out the job efficiently.
The approved list of Punj Lloyd Ltd., Delhi, Alstom Projects India Ltd.-
Vadodara, Man Industries (India) Ltd. - Pithampur (Indore), Essar
Construction (India) Ltd., Gandhinagar, Welspun Gujarat Stahl Rohren Ltd.,
Dahej, Adani Energy Ltd., Ahmedabad, Suzlon Energy Ltd., Pune,
Ratnamani Metals & Tubes Ltd., Ahmedabad, for transportation of their
valued consignments.
We are one of the approved regular contractor for GSFC-Baroda,
GNFCBharuch, KRIBHCO, Hazira, (Surat), for transportation of their
fertilizers and other products by road to various destinations in the
Nothing so conclusively proves a man’s
ability to lead others as what he does
from day to day to lead himself.
Thomas J. Watson ”“
03
GROWTH OF OUR ORGANISATION
FINANCIAL TURNOVER [ Rs. in Crore ]
YEAR 2008-09
15.78 16.48 17.31 19.00 14.18 14.20
2009-10 2010-11 2011-12 2012-13 2013-14
Look at a day when you are supremely satisfied at the end. It's not a day when you lounge around doing nothing; it's when you've had everything to do, and you've done it.
Margaret Thatcher”“
04
ASSESTS OWNED BY ANIL & ANIL
05
Sr. VEHICLE NUMBER. MAKE
1 GJ6XX7995 TATA PRIMA - 4923
2 GJ6XX8145 TATA PRIMA - 4923
3 GJ06AV6002 Ashok Leyland - 4923
4 GJ06AV6094 Ashok Leyland - 4923
5 GJ6XX1295 TATA-4018
6 GJ6ZZ2487 TATA-4018
7 GJ6AV1435 TATA-3518
8 GJ6AV1486 TATA-3518
9 GJ6AV4912 TATA-3518
10 GJ6AV4704 TATA-3518
11 GJ6AV4879 TATA-3518
12 GJ6AV4916 TATA-3518
13 GJ6AV4814 TATA-3518
14 GJ6AV5469 TATA-3518
15 GJ6AV5692 TATA-3518
16 GJ6AV5085 TATA-3518
17 GJ6AV5746 TATA-3518
18 GJ6AV5270 TATA-3518
19 GJ6AV5718 TATA-3518
20 GJ6AV5233 TATA-3518
21 GJ6AV5531 TATA-3518
22 GJ6AV5344 TATA-3518
23 GJ6AV5645 TATA-3518
24 GJ6AV0429 TATA-3518
06
25 GJ6AV1116 TATA-3518
26 GJ6AV0426 TATA-3516
27 GJ6TT6036 TATA-3516
28 GJ6TT6037 TATA-3516
29 GJ6TT6136 TATA-3516
30 GJ6TT6385 TATA-3516
31 GJ6TT6386 TATA-3516
32 GJ6TT7825 TATA-3516
33 GJ6TT7829 TATA-3516
34 GJ6TT9871 TATA-3516
35 GJ6TT9897 TATA-3516
36 GJ6XX5935 TATA-3516
37 GJ6XX6073 TATA-3516
38 GJ6XX6074 TATA-3516
39 GJ6XX6222 TATA-3516
40 GJ6XX6072 TATA-3516
41 GJ6XX8566 TATA-3516
42 GJ6XX8567 TATA-3516
43 GJ6XX9741 TATA-3516
44 GJ6YY5437 TATA-3516
45 GJ6YY8913 TATA-3516
46 GJ6VV4073 TATA-3516
47 GJ6VV4075 TATA-3516
48 GJ6VV5222 TATA-3516
49 GJ6VV5223 TATA-3516
50 GJ6VV5371 TATA-3516
51 GJ6VV5372 TATA-3516
52 GJ6VV5450 TATA-3516
53 GJ6VV8326 TATA-3516
54 GJ6VV8342 TATA-3516
07
55 GJ6VV8360 TATA-3516
56 GJ6YY5474 TATA-3516
57 GJ6YY5528 TATA-3516
58 GJ6YY8860 TATA-3516
59 CG13L9201 TATA-3516
60 CG13L9200 TATA-3516
61 CG13L9199 TATA-3516
62 CG13L9198 TATA-3516
63 CG13L9197 TATA-3516
64 GJ6Y5507 TATA-3516
65 GJ6Y5509 TATA-3516
66 GJ6Z6827 TATA-3516
67 GJ6Z6862 TATA-3516
68 GJ6Z4633 TATA-3516
69 GJ6Z4635 TATA-3516
70 GJ6Z9519 TATA-3516
APPROVED
We are on The approved list of Indian Bank Association’s
(I B A) with bank approved code No. BDA–1012, since 1996.
Bank Approved Code No. : BDA-1012
OTHER DETAILS
Permanent Account No. : AACFA6027H
Service Tax No. : AACFA6027HST001
SHREE VARDHMAN SHAKARI BANK LTD.
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
Karelibaug Branch, Baroda
+ Bharuch Bank
08
BANKER
PATNERS
PATNERS
Mr. Padam R. Jain
+91 9825027377
33 Years
Experience
Mr. Subhah R. Jain
+91 9825065090
28 Years
Experience
Mr. Shikharchand Jain
+91 9099987065
23 Years
Experience
Mr. Anil P. Jain
Mr. Akhilesh Jain
Mr. Deepak Jain
+91 9099987056
+91 9099987050
+91 9099987066
18 Years
13 Years
03 Years
Experience
Experience
Experience
09
&&&
OUR SISTER CONCERN
Shri Padam R. Jain
PARTNER
Mr. Subhash R. Jain
MANAGING PARTNER
Mr. Deepak Jain
PRESIDENT (CONTRACTS AND BUSINESS MARKETING)
Mr. Anil P. Jain
PRESIDENT (FINANCE & TAXATION)
Mr. Shikharchand M. Jain
PRESIDENT (OPERATIONS AND EXECUTION)
Mr. Akhilesh P. Jain
PRESIDENT (VEHICLE ASSESTS & MAINTAINENCE)
MANAGEMENT TEAM
Individual commitment to a group effort,that is what makes a team work, a company work, a society work, a civilization work.
Vince Lombardi ”“
10
JAYPEE CEMENT CORPORATION LIMITED
ALSTOM PROJECT LTD
THERMAX LIMITED
AVINASH EM PROJECTS PVT. LTD.
Work Order No. JCCL/NEW CPP/BALA JI/HO/RC/SE/2013
dtd 19th July 2013, transportation of strucutre, plant and
machinery for new CPP From Jaypee Wanakbori Cement
grinding Unit ( JWCGU) Wanakbori, Gujarat to Jaypee
Balaji Cement Plant (A Unit of JCCL), PB No. 9 Survey No.
99, Budawada, Jaggayyapet (M) Krishna Dist, 621175,
Andhra Pradesh
Work Order No. AIL/003/TRANSPORT/13-14/EXT-1 dtd.
01.07.2013, Extension of Contract Agreement for
Movement of Steel Coils/Sheets/Plates from Mumbai
Port and Nhave Sheva Port to AIL, Maneja / Ratanpur
(Ref. APIL/002/ TRANSPORT/11). Work Order No.
AIL/010/Transport-GUJARAT-04/13-14 dtd. 1st July 2013,
transportation within Gujarat above 10 MT gross weight
per package, within Gujarat.
Work Order No. TL/B&H/BT/-2012/512/PT2811/12 dtd
22.08.2012 transportation of materials from Thermax
Ltd., Savli and Virtue Engineering (Mokshi), Pune to
Reliance Dahej, Gujarat.
LOI : AEPL-GAIL-A JPL-A&A-18032013-082 dtd.18th March,
2013, LOI for pipe shiting from GAIL Stores Yard to
Shankari in Salem, Tamil Nadu to work site at Auralya,
Uttar Pradesh.
COMMITMENTS IN HAND
11
VIJAY TANKS & VESSELS (P) Ltd.
Petron Engineering Construction Ltd.
AFCONS
Work Order No. VTVPL/3098-GPIL/00001/0041354 dtd.
17th January 2013, Project : Storage Tanks – Oil Storage
Terminal at Pipavav, from VTV Dahej Sez to VTV site Pipava
Port, Gujarat Qty. 243 MT
Work Order No. VTVPL/3105/EIL/00001/0038359 dtd. 14,
April 2012, TRANSPORTATION OF Fabricated Plates from VTV Sankarda Works to
GAIL Petrochemical Vijaipur Site M.P.
Work Order No. VTVPL/3099-EIL/00001/0039490 dtd. 1st August 2012,
transportation of 1 No. Equipment from VTV Sankarda Works to GAIL Pata UP
Material Dimension : 3.7 m dia x 3 M H x 11 M Lg – 46.5 wt.
Work Order No. VTVPL/3105-EIL/00001/0038359 dtd. 11th July 2012, transportation
from VTV Sankarda Works to GAIL Petrochemical Vijaipur site M.P.
Work Order No. 84002090 dtd. 14.12.2012 transportation
of Convection Modules from Dabhasa to GAIL Pata site.
Work Order No. 84001173 DTD. 22.05.2012
transportation of CS & Low As Pipes qty. 211.560 MT
from Mumbai to Vadodara site
Work Order No. DJPU/2265/KR/DAH/WSO/LOI dtd.
07.07.2012, EPCC Marine Facilities for Stand by Jetty at
Dahej LNG Dahej, for hiring of One Horse & 75, 45 Feet
Flat Bed Trailer at Dahej LNG site.
12
FABTECH PROJECTS & ENGINEERS
ABG SHIPYARD LTD.
ALSTOM PROJECT INDIA LTD.
PO No. : ZG-FPEL/FPRO-222/012 dtd. 07.05.2012
transportation of Pipes from M/s. GAIL yard (Sankari) to
the working site for Section V (Section Length 98 kms) of
KKBMPL PH-II Project [Pipes Qty. 98000]
Po No. 4500011216 dtd. 11.04.2012 for PP22 Fabtech
Projects & FPRO-0221 transportation of the pipes from M/s GAIL Yard (Sankari) to
the working site for Section IV (Senction Length 112 kms) of KKBHMP Ph-II, Project.
Work Order No. 5500028336 dtd. 10.03.2012
transportation Y-264 material from ABG Shipyard Ltd.,
Dahej to ABG, Surat, the material lifted in Normal trailer,
ODC Trailer and 02 Nos Engines lifted in Hydraulic Axle
trailer :
(1) Size 12 ft x 8.5 ft x 14 ft Weight 60 ton
(2) Size 24 ft x 11 ft x 10 ft Weight 85 ton
Work Order awarded on 15.11.2010 for local
transportation of 4923 Heavy Trailer for monthly basis
Start from 15th November 2010 to 14th November 2013.
Work Order awarded on 31.10.2011 for Movement within
Gujarat Above 10 MT Gross weight per package or over
dimensions, movement of Steel Plates & Coils various destination like Mumbai
Port, Raigarh (CG), Jamshedpur, Vashi, Thane etc and movement of within India,
this contract shall be valid 31.10.2011 upto 30.04.2012,
ABG
13
LARSEN & TOUBRO LIMITED
£ Work Order No. EPC/E02/21000-04628/JK dtd.
23.04.2011 Vendor Code : 0TZZ900174, Hiring of 2 Nos.
Trailors (Capacity : 40 MT) at project site 2 x 600 MW
SSIPP for a period of two month from 23.04.2011 to
22.06.2011 for shifting of structural steel and finished
product of girders at B1 bridge in RWISE. It will be also
utilized for shifting of materials from intake point to in-plant area (ECC.L&T)
and vise-versa and said work is extension in validity of contract from
22.06.2011 to 15.11.2011.
£ Work Order No. EPC/E01/21000-03381/JK dtd. 23.02.2011 Vendor Code :
0TZZ900174, shifting of material (Laying at 220 KV & 400 KV switchyard) to be
carried out at 2 x 600 MW Shree Singaji Thermal Power Project, Village –
Dongolia, Dist Khandwa, Madhyapradesh.
£ Work Order No. EPC/E02/21000-01036/JK dtd. 15.09.2010, Vendor Code :
OTZZ900174, shifting of material laying at switchyard to new yard of BHEL near
coal handling plant to be carried out at 2 x 600 MW Shree Singaji Thermal
Power Project, Village-Dongolia, Dist-Khandwa, Madhyapradesh
£ Work Order No. EPC/E02/21000-02049/JK dtd. 13.12.2010, Vendor Code :
OTZZ900174, shifting of material laying at switchyard to new yard of BHEL near
coal handling plant to be carried out at 2 x 600 MW Shree Singaji Thermal
Power Project, Village-Dongolia, Dist-Khandwa, Madhyapradesh
KAZSTROY SERVICE INFRASTRUCUTRE INDIA PVT. LTD.
Ÿ Work Order No. KSSIIPL/LOGISTRICS/821 dtd.
02.03.2011 for transportation of pipe size : 8.7, 11.9 &
14.3 mm thk - 24” Coated Line Pipe from M/s. GAIL pipe
yard at Malkapur, Kolapur (Maharashtra via Belgam
(Karnataka) to Doda Marg (Maharashtra) & Goa sites
Ÿ Work Order No. KSSIIPL/LOGISTRICS/775 dtd.
14.02.2011 for transportation of pipe size : 8.7, 11.9 & 14.3 mm thk - 24” Coated
Line Pipe from M/s. GAIL pipe yard at Malkapur, Kolapur (Maharashtra via
Belgam (Karnataka) to Tilari Nagar (Maharashtra)
Ÿ Work Order No. KSSIIPL/LOGISTRICS/931 dtd. 29.06.2011 for transportation of
pipe size : 8.7, 11.9 & 14.3 mm thk - 24” Coated Line Pipe from M/s. GAIL pipe
yard at Malkapur, Kolapur (Maharashtra via Belgam (Karnataka) to Tilari Nagar
(Maharashtra)
Ÿ Work Order No. KSSIIPL/LOGISTRICS/932 dtd. 29.06.2011 for transportation of
pipe size : 8.7, 11.9 & 14.3 mm thk - 24” Coated Line Pipe from M/s. GAIL pipe
yard at Malkapur, Kolapur (Maharashtra via Belgam (Karnataka) to Doda Marg
(Maharashtra) & Goa sites
14
SEW INFRASTRUCUTRE LIMITED
PUNJ LLOYD LTD.
Work Order No. : SEW/PROCUR/ARR/PO NO:000622/2009-
10 dtd. 29.03.2010 – Transportation of “RCC Pipes 2200mm
& Collers” from Bodeli to Korali Dist : Siwani, Near –
NAGPUR.
Ÿ Work Order No. KSSIIPL/LOGISTRICS/864 dtd. 24.04.2011 for transportation of
pipe size : 8.7, 11.9 & 14.3 mm thk - 24” Coated Line Pipe from M/s. GAIL pipe
yard at Malkapur, Kolapur (Maharashtra via Belgam (Karnataka) to Doda Marg
(Maharashtra) & Goa sites.
Ÿ Work Order No. 2400563 dtd. 12.10.2011 Vender Code : 30001138 for
3004/Dhabol Bangalore Pipeline Project – hiring of Semi Low Bed Trailer for
monthly basis.
Ÿ Work Order No. PLL/DBPL-F/PIIN25/SITE/A&A/022 – 30”
dia Pipe Transportation from Chitradurga GAIL Yard (DS-
2) to Harpanhalli PLL Yard, Chitradurga GAIL yard (DS-2)
to Gadag PLL Yard, Harpanhall PLL Yard to ROW site &
Gadag PLL Yard to ROW site for Dabhol Bangalore
Pipeline Project Spread – F of M/s. GAIL India Ltd.,
Ÿ Work Order No. PLL/DBPL-A/PIIN26/SITE/WO/066 dtd.23.09.2011 / 24.11.2011
Pipe size : 36” dia 13.5 mm, 14.3 mm & 17.5 mm thk transportation from
Malkapur GAIL Yard to Dabhol, Devrukh & Abloli PLL Yard / ROW at Dabhol
Bangalore pipeline Project Spread – A of M/s. GAIL India
Ÿ Work Order No. PLL/MUPL/A&A/201101 dtd. : 13.04.2011 Transportation of
pipes from Mundra (Gujarat), India to Gavhan, Taluka – Panvel for Mumbai –
Uran Pipeline Project
Ÿ Work Order No. PLL/PROJ/PIIN23/WO/03 dtd. 22.10.2009 The job consists of
Transportation of 48” line pipes, The activities involved to lift (Loading in scope
of dump yard contractor) Line pipe from Pipe Dump yard at Samni (K 48.00) and
Wagodia (K 121.00),
Ÿ transportation of lifted pipes to pipeline ROU, as per requirement stated by PLL
representative to required destination of ROW. The approx 48” pipes, each
nearly 12 meters as per different wall thickness of pipes 15.9, 17.5 & 23.8mm
15
ESSAR CONSTRUCTIONS (INDIA) LIMITED
PUNJ LLOYD LTD.
Vijaypur Dadri Pipeline Project of 48” x 3.33 km distributed
in 2 sections. Section A of 169.5 km and Section – C of 16.3
Km
Section A – Spread -1 (Chainage 0 Km to 80.350 km),
Spread-2 (Chainage 80.350km to 169.50 km) Total length
169.50 km. Transportation of 48” Line Pipes (coated pipes and bare pipes) from
Designated Stock Yards to the Right of Way. Thickness of pipes 17.5 mm, 25.4mm,
27mm
Section C – Spread – 5 (Chainage335 km to 418 km), Spread-6 (Chainage 418.3km
to 498 km) Total length 163.00 k.m. Transportation of 48” Line Pipes (coated pipes
and bare pipes0 From Designated Stock yard to the Right of Way. Thickness of
pipes 17.5mm, 25.4mm and 27mm.
As a minimum the contractor will have to supply pipes at four different locations in
Right of Ways as directed by the site Incharge of Client.
£ Work Order No. PLL/PROJ/PIIN10/06-01 DTD.
25.08.2006 Intent (LOI) for Transportation of Line Pipes
for Dahej – Uran Pipelines works of GAIL Brief Scope of
Work Inspect and transportation of line pipes from
GAIL Yard at Bhillad near Vapi to the designated dump
yard hired constructed and maintained and further
transportation along the pipelines route.
£ Work Order No. PLL/PROJ/PIIN17/WO/03A Dtd. 20.10.2007 Stringing of Line
pipes works and associated works (the Subcontract) Brief Scope of Work The
activities involved to lift (loading in scope of dump yard contractor) Line pipe
from Pipe dumpyard at Kasa (K1150.5) and Goveli (K1066.0), transportation of
lifted pipes to pipeline ROW as per requirement stated by PLL representative to
required destination of ROW.
£ Work Order No. PLL/PROJ/PIIN19/WO/17 dtd. 29.01.2008 Stringing of Line
pipes works and associated works (the Subcontract) Brief Scope of Work The
activities involved to lift (loading in scope of dump yard contractor) Line pipe
from pipe dumpyard at Srigonda (K898), transportation of lifted pipes to
Pipeline ROW as per requirement stated by PLL representative to required
destination of ROW.
16
ALSTOM PROJECT [I] LTD. Baroda
[1] Work order in hand [2007-08 - 2008-09]
Work order No. FFC_URI-II_2007_11
Rev O [URI-II INDIA]
[2] Work order in hand [2007-08 - 2008-09]
Work order No. FFC_CHAMERA_2007
[CHAMERA INDIA]
[3] Working from JNPT, Kolambali (Mumbai) to various destination all over
India.
£ Punj Lloyd Ltd.
Ÿ Transportation of valued consignment of 17.2 mm and 20.4 mm from Sonari
to Ch. 840-855
Ÿ Transportation of valued consignment of 17.2 mm and 20.4 mm from Sonari
to SriGonda Camp
Ÿ Transportation of valued consignment of 25.4 Sonari to 840-855
Ÿ Transportation of valued consignments of 25.4 sonari to Srigonda.
Ÿ Transportation of valued consignments from Srigonda to Km 840-855 (Bend
Pipes).
GUJARAT STATE FERTILIZER CHEMICALS LTD., BARODA
Work Order No. MKT/CONTRACT/FN/12/2011-12 dtd.
28.09.2012 From G.S.F.C. Baroda to Maharasthra,
Rajasthan & Madhya Pradesh site.
Work Order No. MKT/CONTRACT/FN/12/2010-11 dtd.
30.09.2011 From G.S.F.C. Baroda to Maharasthra,
Rajasthan & Madhya Pradesh site.
Work Order No. MKT/CONTRACT/FN/12/2010-11 dtd. 21.10.2010
From G.S.F.C. Baroda to Maharasthra, Rajasthan & Madhya Pradesh site.
Work Order No. MKT/CONTRACT/FN/12/2009-10 dtd. 30.05.2009
From G.S.F.C. Baroda to Maharasthra & Rajasthan site.
Work Order No..MKT/CONTRACT/FN/12/2008-09 dtd. 27th June 2008.
From G.S.F.C. Baroda to Maharasthra & Madhya Pradesh site.
Work Order No..MKT/CONTRACT/FN/12/2007-08 dtd 31.05.2007.
From G.S.F.C. Baroda to Maharasthra & Rajasthan site.
17
Gujarat Narmada Valley Fertilizers Company Ltd.
ASSOCIATED POWER STRUCTURE, KARJAN
MUKESH ENGINEERING LTD. KARJAN
Work Order No. GM(Mktg)/D&T/WO_EXT_Guj/2011-12 dtd.
20.05.2011 Road Transportation Contract of Fertilizers
from GNFC Plant, Bharuch to the districts of the Gujarat,
Rajasthan State 01.06.2011 to 31.05.2012.
Work Order No.; GM(Mktg)/D&T/TPT_WO_Mah/2010-11
dtd. 31.05.2010 Road Transportation Contract of Fertilizers from GNFC Plant,
Bharuch to the districts of the state Maharashtra
Work Order No.; GM(Mktg)/D&T/TPT_WO_Guj/2010-11 dtd. 31.05.2010
Road Transportation Contract of Fertilizers from GNFC Plant, Bharuch to the
districts of the state Gujarat.
Work order No. : GM(D&T)/TPT_WO/2008-2009 dtd. 29nd March 2008
From G.N.F.C. Bharuch to Gujarat, Maharashtra and Rajasthan Site.
At present we are working at South site like Palladam,
Palakad, Pondicherry, Sankanari, etc. and Gujarat –
Porbandar, Mandvi, Naliya, / UP - Merrut ,/ Orissa -
Rudderpur and All Rajasthan site.
At present we are working at Gujarat – Mandvi, Naliya, and
South site like Palladam, Pondicherry, Sankanari and
allover Maharastra & Rajasthan siteMUKESHENGINEERING
18
CEMENT [R.C.C.] PIPES FACTORY AT BODELI
[01] Ashirwad Hume Pipe
[02] A.D. Patel Pipe Factory
[03] Amit Spun Pipe Factory, Billimora
[04] Capital Construction
[05] C.H. Patel Pipe Factory
[06] D.D. Construction
[07] Gayatri Cement Pipe Factory
[08] Giriraj Hume Pipe
[09] Gujarat Spun Pipes Factory
[10] Gurukrupa Pipes Factory
[11] H.K. Shah & Co.
[12] Indian Spun Pipe Factory
[13] Jayvee Buildcom
[14] J.R. Shah & Co.
[15] Jalaram Spun Pipe Factory
[16] Kabir Hume Pipes Factory
[17] Kapliesh Pipe Factory
[18] Karada Construction
[19] Laxmi Cement Pipe Factory
[20] Mahalaxmi Spun Pipe Factory
[21] Maruti Constructions, Surat
[22] Mitrata Construction, Surat
[23] Natver Construction Company
[24] Nutan Pipe Factory
[25] Param Pipes
[26] Patel Hardware Depot
[27] Prestress Corporation of India Ltd.,
[28] Prima Pipe Industries
[29] Pusti Pipes Factory
[30] R.S. Pipes Factory
[31] Sagar Pipe Factory, Mumbai
[32] Shree Jala Hume Pipes Factory
[33] Shree Jala Industries
[34] Shri Hari Pipes Factory
[35] Sunrise Enterprises
[36] Swami Traders
[37] Venus Pipes Factory
[38] Vishal Articals, Pavijetpur
[39] Vishal Pipes Factory
[40] Vishnu Esbostok, Mumbai
19
M/S. GUJARAT STATE FERTILIZERS & CHEMICALS LTD., BARODA
M/S. KRISHAK BHARATI CO-OPERATIVE LTD., SURAT
M/S. GUJARAT NARMADA VALLEY FERTILIZERS CO. LTD., BHARUCH
M/S. GUJARAT ALAKLIES & CHEMICALS LTD., BARODA
M/S. ALSTOM PROJECTS INDIA LTD., BARODA
M/S. PUNJ LLOYD LTD., DELHI
M/S. ASSOCIATED POWER POJECT LTD., KARJAN, BARODA
M/S. MAN INDUSTRIES INDIA LIMITED., INDORE
M/S. SUZLON ENERGY LTD., PUNA
M/S. B.M. ENGINEERING INDUSTRIES, BARODA
M/S. MUKESH ENGINEERING INDUSTRIES, BARODA
M/S. VOLTAMP TRANSFORMERS LTD., BARODA
M/S. SHA M/S. SHAH ALLOYS LTD., AHMEDABAD 13
M/S. IVRCL INFRASTRUCTURE & PROJECTS LTD., AHMEDABAD
M/S. RATNAMANI METALS & TUBES LTD., AHMEDABAD
M/S. ESSAR CONSTRUCTION (INDIA) LTD., GANDHINAGAR
M/S. WELSPUN GUJARAT STATE ROHEN LTD., DAHEJ
M/S. ADANI ENERGY LTD., AHMEDABAD
M/S. LARSEN & TOUBRO LIMITED, BARODA
M/s. KAZSTROY SERVICE INFRASTRUCTURE INDIA PVT. LTD.,
M/s. BALA JI FIBER REINFORCE PVT. LTD., BARODA
M/s. KEMROCK INDUSTRIES & EXPORTS LIMITED, BARODA
M/s. DIAMOND POWER INFRASTRUCTURE LTD., BARODA
M/s. SUNRISE POLYMERS & INDUSTRIES (INDIA) LTD., BARODA
M/s. ORBIT INFRASTRUCUTRE INDUSTRIES, BARODA
M/s. SUNRISE INDUSTRIES (INDIA) LTD., BARODA
M/s. JINDAL RAIL INFRASTRUCTURE LTD., KARJAN, BARODA
M/s. JINDAL STEEL & POWER
M/s. T&G PRECAST INDUSTRIES, DIST : BHARUCH
M/s. NUBERG ENGINEERING LTD., JHAGADIA
M/S. ABG SHIPYARD LTD., SURAT
M/S. PRABHA STEEL INDUSTRIES, BARODA
M/S. CHEMICAL PROCESS EQUIPMENTS PVT. LTD., BARODA
M/S. EPP COMPOSITIES PVT LTD., RA JKOT
M/S. NEWTON ENGG. & CHEMICAL LTD., BARODA
M/S. MCNALLY SAYA JI ENGINEERING LTD.,
M/S. PETRON ENGINEERING CONSTRUCTION LIMITED, MUMBAI
M/s. VIJAY TANKS & VESSELS (P) lTD.,
M/s. AVINASH EM PROJECTS PVT. LTD.,
M/s. JAYPEE CEMENT CORPORATION LIMITED.,
M/s. RELIANCE INDUSTRISE LIMITED JAMNAGAR.
M/s. FABTECH PROJECT AND ENGINEERING PUNE.
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
20
VALUED CLIENTS
01 ANIL & ANIL
Bombay Office
K/503, Jalvayu Vihar
Sector – 20, Phase – I
Kharghar, Navi Mumbai
Mr. D.K. JAIN 09323410528
02
03
04
05
06
07
10
11
12
13
08
09
ANIL & ANIL
DELHI Office
F-4,/148, Ground Floor,
Sector – 16 Rohini, New Delhi
ANIL & ANIL
INDORE Office
Opp. Diamond Garage
1st Floor, Agra Bombay Road,
Dewas Naka, INDORE
ANIL & ANIL
94, Phears Lane
4th Floor , Kalkatta
ANIL & ANIL
222. Ratnagiri Bypass Bhopal
ANIL & ANIL
Khushi Bhavan
Jindal Road, Gorkha
RAIGAHD 496001 Chhattishgadh
ANIL & ANIL
KEKRI Office
Mehta Building
Opp. Bus Stand KEKRI [Rajasthan]
ANIL & ANIL
Bajwa Office
GSFC Approach Gate BARODA
ANIL & ANIL
Transport Nagar,
Pondicharry
ANIL & ANIL
Transport Nagar
Chennai
ANIL & ANIL
Transport Nagar
Bangalore
ANIL & ANIL
Bodeli Office
Dokalia Chokdi BODELI.
ANIL & ANIL
G.N.F.C. Approach Gate.
Gate, Bharuch
MR. SUNIL JAIN
MR. SUNIL PUNIYA
MR. RITESH
MR. GOPALJI
MR. KALA
MR.MAHENDRA PATNI
MR.SALIMBHAI
MR. DAYAL
SHRI NIVASAN
MR. B.D. KALA
MR.DARMESHBHAIMR. SAMBHUNATH
MR.KIRANBHAIMR.SUBHASHBHAI
09868124084
09826021158
09831211124
09826091363
09993571013
09828540421
09099997059
09843048695
044 26272513
09342073190
09099987052
0909998706809099987069
LIST OF BRANCHES / ASSOCIATE OFFICES
21
MILESTONES
1] We also have vast experience for transportation of ODC Consignment &
Machinery equipments for Low Bed Trailer / Hydraulic Axle to Mumbai, Delhi,
Calcutta, URI, Chamera, Omkareshwar, etc.
2] We have transported ODC consignment i.e. Fiber Tank, size: 18’ Dia & 45’
length from Savli to Mumbai Port of Sunrise Polymers Pvt. Ltd., in June 2007.
3] We have transported ODC consignment i.e. Water Dam Gates, size : 11’ dia
& 65’ length from Baroda to Omkareshwar of M/s. Alstom Project (I) Ltd., in
2005 & 2006.
4] We have transported 5000 M.T. monthly Tower Angel from Karjan to all over
south site of Suzlon Ind. Ltd., i.e. 60000 M.T. yearly.
5] We have transported 2,50,000 M.T. Rock Phosphate & Sulphur from
Magdalla Port to G.S.F.C. Baroda.
6] We have transported fertilizer products from GSFC & GNFC to various state
like Maharashtra, Rajasthan, Madhya Pradesh etc yearly of 36,000/- M.T.
7] We have lifted in 8 Hydraulic Axle vehicles of. 85 MT in each from Baroda to
Mumbai/Navasheva, JNPT, Mumbai of M/s. Alsotm Project (I) Ltd.,
8] We have lifted 13 Hydraulic Axle Vehicles of 60 MT in each from BHEL to
Larsen & Toubro Ltd., Shree Singalji Termal Power Project, Village – Dongoli,
Malva Dist : Khandwa, M.P.
9] We also lifted machinery of size: L 70 ft x W 9’ ft x H 9’ ft Wt. 21 MT from
Hazira to Baroda – M/s. Prabha Steel Industries, Chhani Road, Baroda.
CAPABILITIES
1] We have an investment capacity of 4 to 5 crores at a time for the
transportation work.
2] If the loading and unloading of vehicles at loading and unloading site
respectively is clear than we can transport minimum of 500 pipes per day and
even increase the transportation of the pipes as per requirement within the
radius of 0 to 50 kms for 48” pipes.
3] We can also transport 300 pipes per day & increase the transportation of
pipes as per requirement within the radius of 0 to 100 kms load & unloading
sites are clear.
4] At a time we will be provided of 32 Hydraulic Axle. 3 Puller, Volvo and Prima.
5] We have available with us 9 to 10 Low bed vehicles in all over India.
22
GOOD SERVICE CERTIFICATE
23
CERTIFICATE OF INDIAN BANK’S ASSOCIATION
24
CERTIFICATE OF ISO 2001:2008
25
Address
25, Jalaram Chamber
Jalaram Marg, Karelibaug
Vadodara – 390 018
Telephone : [0265] 2463393
[0265] 2461702
[0265] 2462785
Email : aabrd@anilandanil.com
aabrd@yahoo.com
Website : www.anilandanil.com
top related