PINEWOOD STUDIOS Office building
Brief
•New office building for Pinewood studio
•Space for 50 people to work
•Quick to build with low construction cost
•Wide open space
•4 stories all with the ability of an additional 3 stories
WHO?
Office ◦ Cater for approximately 50 people, additionally
extra businesses or meetings.◦ Area for eating and relaxing
Residential◦ 6 apartments accompanied by roof garden
• Apartments 136m²• At roughly £400pw, you would generate
£115000pa from all 6 apartments.
WHAT WILL IT DO
Conversion of apartments to office:• The first 4 storeys are for office use only• 3 storeys above the office are apartments which are rented out, and can then be used to convert into offices in the future.• Apartments would be rented out which means there would be an increase in the income
Interior office materials:• sound proofed rooms
RESIDENTIAL AREA- conversion
Located just outside Greater London Located on an existing plot
WHERE?
50 years Office use is extended by temporary
residential housing
HOW LONG SHOULD IT LAST?
INITIAL IDEAS
DEVELOPMENT
13 columns◦ 5 are slanted
Braces to secure structure and stop twisting
STRUCTURAL
FACADESPotential Materials of office•Pine slabs•Aluminium •GRP•GRC•Fritted glass•Laminated glass
FACADE DESIGN 1
Laminated glass, height of 1.1m
Pine slabs
Triple glazing saves up to 7200W
Fritted glass (prevents too much solar gain)
FACADE DESIGN 2
Facades:• how the triple glazed glass would be attached
1) Silicone connection • bigger connection • requires less amount of
glass panels, therefore requires more silicone.
• bigger connection which doesn't meet architects needs
2) Toggle connection•Smaller connection therefore more aesthetically pleasing.•Stronger than using silicone connection
Triple Glazing
•British standards- rails have to be at least 1.1m high. (For the roof Garden)•Manufactured from laminated glass (safer)
Roof Garden railing
Attaching Pine slabs to the structure
Pine slabs
Ground floor
First floor
Ground floor
Second floor
Third floor
Fourth to Sixth floor
UNDERGROUND CAR PARK
Triple Glazing – calculating the heat loss
SERVICES – Heat loss
Total heat loss for the building = 65 kW
Giving an average ‘u value’ of ~ 0.79 Wm-2K-1
Triple glazing saves around 7000 W
Office ventilation (mechanical) Heating and cooling (Air Handling Unit with
Heat Recovery)◦ ground 25x30cm (<25 people),◦ 1st floor 24x36cm (<20 people), ◦ 2nd floor 36x30cm (<30 people),◦ 3rd floor 24x30 (<20 people)
Car Park ventilation (requires carbon monoxide detectors and jet fans)
SERVICES
Automatic, presence detection lighting ◦ (60 lights per floor in offices)◦ (10 lights per apartment)
Water supply Gas (for apartments and kitchen in office)
SERVICES
Water Collection
Transport◦Access to underground car park◦Bike Shed
Geotechnics◦10m made ground, 40m London clay◦Piles- replacement (concrete and steel)
• Environment—Roof Garden
ENVIRONMENT & INFRASTRUCTURE
Teamwork between all the different disciplines is essential.
Much more involved than just making it stand up! Meeting local standards is a pain. Especially when
undertaking foreign projects. About all the different parts involved in a
successful design. (u values, moments, loading) CAD software can be a challenge! But once
mastered can make the process much more efficient.
Litigation between client and contractor is key. And of course, lots of hard work.
What we’ve learnt...
And thanks for the hard work you have all put in to making this a value experience for us!
Thank you for listening to our presentation...
Any questions?