arkwright work experience group 1
TRANSCRIPT
![Page 1: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/1.jpg)
PINEWOOD STUDIOS Office building
![Page 2: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/2.jpg)
Brief
•New office building for Pinewood studio
•Space for 50 people to work
•Quick to build with low construction cost
•Wide open space
•4 stories all with the ability of an additional 3 stories
![Page 3: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/3.jpg)
WHO?
![Page 4: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/4.jpg)
Office ◦ Cater for approximately 50 people, additionally
extra businesses or meetings.◦ Area for eating and relaxing
Residential◦ 6 apartments accompanied by roof garden
• Apartments 136m²• At roughly £400pw, you would generate
£115000pa from all 6 apartments.
WHAT WILL IT DO
![Page 5: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/5.jpg)
Conversion of apartments to office:• The first 4 storeys are for office use only• 3 storeys above the office are apartments which are rented out, and can then be used to convert into offices in the future.• Apartments would be rented out which means there would be an increase in the income
Interior office materials:• sound proofed rooms
RESIDENTIAL AREA- conversion
![Page 6: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/6.jpg)
Located just outside Greater London Located on an existing plot
WHERE?
![Page 7: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/7.jpg)
50 years Office use is extended by temporary
residential housing
HOW LONG SHOULD IT LAST?
![Page 8: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/8.jpg)
INITIAL IDEAS
![Page 9: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/9.jpg)
DEVELOPMENT
![Page 10: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/10.jpg)
13 columns◦ 5 are slanted
Braces to secure structure and stop twisting
STRUCTURAL
![Page 11: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/11.jpg)
![Page 12: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/12.jpg)
![Page 13: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/13.jpg)
FACADESPotential Materials of office•Pine slabs•Aluminium •GRP•GRC•Fritted glass•Laminated glass
![Page 14: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/14.jpg)
FACADE DESIGN 1
Laminated glass, height of 1.1m
Pine slabs
Triple glazing saves up to 7200W
Fritted glass (prevents too much solar gain)
![Page 15: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/15.jpg)
![Page 16: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/16.jpg)
FACADE DESIGN 2
![Page 17: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/17.jpg)
Facades:• how the triple glazed glass would be attached
1) Silicone connection • bigger connection • requires less amount of
glass panels, therefore requires more silicone.
• bigger connection which doesn't meet architects needs
2) Toggle connection•Smaller connection therefore more aesthetically pleasing.•Stronger than using silicone connection
Triple Glazing
![Page 18: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/18.jpg)
•British standards- rails have to be at least 1.1m high. (For the roof Garden)•Manufactured from laminated glass (safer)
Roof Garden railing
![Page 19: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/19.jpg)
Attaching Pine slabs to the structure
Pine slabs
![Page 20: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/20.jpg)
Ground floor
First floor
![Page 21: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/21.jpg)
Ground floor
![Page 22: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/22.jpg)
Second floor
Third floor
![Page 23: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/23.jpg)
Fourth to Sixth floor
![Page 24: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/24.jpg)
UNDERGROUND CAR PARK
![Page 25: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/25.jpg)
![Page 26: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/26.jpg)
Triple Glazing – calculating the heat loss
SERVICES – Heat loss
![Page 27: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/27.jpg)
Total heat loss for the building = 65 kW
Giving an average ‘u value’ of ~ 0.79 Wm-2K-1
Triple glazing saves around 7000 W
![Page 28: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/28.jpg)
Office ventilation (mechanical) Heating and cooling (Air Handling Unit with
Heat Recovery)◦ ground 25x30cm (<25 people),◦ 1st floor 24x36cm (<20 people), ◦ 2nd floor 36x30cm (<30 people),◦ 3rd floor 24x30 (<20 people)
Car Park ventilation (requires carbon monoxide detectors and jet fans)
SERVICES
![Page 29: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/29.jpg)
Automatic, presence detection lighting ◦ (60 lights per floor in offices)◦ (10 lights per apartment)
Water supply Gas (for apartments and kitchen in office)
SERVICES
![Page 30: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/30.jpg)
Water Collection
![Page 31: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/31.jpg)
Transport◦Access to underground car park◦Bike Shed
Geotechnics◦10m made ground, 40m London clay◦Piles- replacement (concrete and steel)
• Environment—Roof Garden
ENVIRONMENT & INFRASTRUCTURE
![Page 32: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/32.jpg)
Teamwork between all the different disciplines is essential.
Much more involved than just making it stand up! Meeting local standards is a pain. Especially when
undertaking foreign projects. About all the different parts involved in a
successful design. (u values, moments, loading) CAD software can be a challenge! But once
mastered can make the process much more efficient.
Litigation between client and contractor is key. And of course, lots of hard work.
What we’ve learnt...
![Page 33: Arkwright Work Experience Group 1](https://reader035.vdocuments.us/reader035/viewer/2022081401/55becf6ebb61eb08728b4707/html5/thumbnails/33.jpg)
And thanks for the hard work you have all put in to making this a value experience for us!
Thank you for listening to our presentation...
Any questions?