Anouchka Poloubinski-Blandin Anastasija Krivonosova

Anthony Baptista Luis Fernandes

Plains-WandererN° 9

2

Summary

Energy efficiency Sustainable Design

Building services Green roof

Investment and returns Conclusion

What is a Plains-wanderer

3

What is a Plains-wanderer

• A critically endangered species of the Northen Plains Grassland Community

4

Sustainable Design

5

External Cladding

6

External Cladding

Brick Roughcast

7

Triple Glazing

Doors &Windows

8

BalconySeparation of balcony

Railing

9

Balcony Sliding doors

10

The roofService room

11

Reinforcement floor

Carbon reinforcement strips

12

Green Roof

13

Before / After

14

Final Result

15

Energy efficiency

Warming the building by using natural sunlight is called Passive Solar heating.

In this case we use advanced windows, such windows have triple blades with E-low system.

• Passive sun Heating

16

Energy efficiency• Thermal bridge

1 Coating2 Masonry wall, solid concrete3 Adhesive smoothing4 STYROFOAM IB-A5 Inner coating6 Concrete pillar

17

The other types of Natural Insulation Materials are:

• Wood Fibre

• Expanded Clay Aggregate

• Sheep's Wool

• Flax and Hemp

Energy efficiency• Sustainable and alternative insolations

18

• Sustainable and alternative insolations

Energy efficiency

Insulation is a key component of sustainable building design.

Cellulose InsulationA recycled product made from newsprint and other cellulose fibre.

19

Building services• Double flux ventilation

- Solution long-term economic.- Use of unnecessary heat stored at the ceiling.- Homogenizes the temperature.- Air is cleaned and prevents health problems.

20

Building services• Equipment housing with a double flow ventilation

Heat exchanger - recovers heat (60%)

Solar panels system - save electricity for the VMC - new heating source

21

Green Roof

Extensive green roof - Biodiversity - Insulation - Accessible

Drain water system from the roof to the tank in the basement.

22

Rain water systemWater management

Sanitaryware saving water - Valves with flow limiter - Dual control flush toilet - Hot water halfway kitchen bathroom - Decrease volume flush

Rain water system - Storage in the basement (inertia): - Contribution garden, cars - Evacuation in a pond (Biodiversity)

23

Rain water systemWater management

Operation of Equipment to Capture Rainwater

24

Investment and returns

•Financing options

Government support

•Loan with fixed interest rate of 3%

• Energy savings >20%15%

• Energy savings >40%30%

25

Investment and returns

Preparation work

Project planning

Construction works

Service room installation

Carbon reinforceme

nt strips

Roof

Insulation of the flat roof

Solar panels

Green roof

Windows and doors

Plastic windows

Entrance doors

Balcony sliding doors

Small windows in

the staircase

External finishing

Facade, cellar insulation

Facade plastering

Railings, balcony

separation installation

Clay facade tiles

Ventilation

Installation of ventilation

channels

Ventilation system

installation

Rainwater collection

system

Tank installation

Installation of

rainwater pipes

Installation of gutter

Rainwater treatment

system

Completion works

Building recognition suitable

to use

26

Investment and returns

Direct costs (Lt)Material Machinery Employee salaries

56922 212885 2902

Subconstactor cost 325150

Total: 597859

Extra cost 19684

Social security cost 31% 900Total direct costs: 618443

Indirect costs (Lt)Overhead 871

Profit 5% 30966

Total indirect costs: 31837

Total without VAT 650280

VAT 21% 136559

Total with VAT(Lt/EUR) 786839/~230000

27

Investment and returns

•Average heat usage of Žirmunų g.116 building from October 2010

15 kWm/m2

•Planed heat savings after renovation 72%

•Investment per one flat 26.230 Lt•Government financing 7.879 Lt•Month Bank loan per flat 80,25 Lt •Heat cost per year before retrofit 1.350 Lt / flat•Heat cost per year after retrofit 375 Lt/year•Extra maintanace for the building 350 Lt /year•Total savings per flat 963 Lt •Loan period 18,2 years

28

Conclusion

- High level of thermal insulation-Thermal-bridge-free construction- E-low windows- Comfort ventilation - Sustainable materials- Green roof & rainwater system

29

Thanks for your attention