anouchka poloubinski-blandin anastasija krivonosova anthony baptista luis fernandes plains-wanderer...
TRANSCRIPT
1
Anouchka Poloubinski-Blandin Anastasija Krivonosova
Anthony Baptista Luis Fernandes
Plains-WandererN° 9
2
Summary
Energy efficiency Sustainable Design
Building services Green roof
Investment and returns Conclusion
What is a Plains-wanderer
3
What is a Plains-wanderer
• A critically endangered species of the Northen Plains Grassland Community
4
Sustainable Design
5
External Cladding
6
External Cladding
Brick Roughcast
7
Triple Glazing
Doors &Windows
8
BalconySeparation of balcony
Railing
9
Balcony Sliding doors
10
The roofService room
11
Reinforcement floor
Carbon reinforcement strips
12
Green Roof
13
Before / After
14
Final Result
15
Energy efficiency
Warming the building by using natural sunlight is called Passive Solar heating.
In this case we use advanced windows, such windows have triple blades with E-low system.
• Passive sun Heating
16
Energy efficiency• Thermal bridge
1 Coating2 Masonry wall, solid concrete3 Adhesive smoothing4 STYROFOAM IB-A5 Inner coating6 Concrete pillar
17
The other types of Natural Insulation Materials are:
• Wood Fibre
• Expanded Clay Aggregate
• Sheep's Wool
• Flax and Hemp
Energy efficiency• Sustainable and alternative insolations
18
• Sustainable and alternative insolations
Energy efficiency
Insulation is a key component of sustainable building design.
Cellulose InsulationA recycled product made from newsprint and other cellulose fibre.
19
Building services• Double flux ventilation
- Solution long-term economic.- Use of unnecessary heat stored at the ceiling.- Homogenizes the temperature.- Air is cleaned and prevents health problems.
20
Building services• Equipment housing with a double flow ventilation
Heat exchanger - recovers heat (60%)
Solar panels system - save electricity for the VMC - new heating source
21
Green Roof
Extensive green roof - Biodiversity - Insulation - Accessible
Drain water system from the roof to the tank in the basement.
22
Rain water systemWater management
Sanitaryware saving water - Valves with flow limiter - Dual control flush toilet - Hot water halfway kitchen bathroom - Decrease volume flush
Rain water system - Storage in the basement (inertia): - Contribution garden, cars - Evacuation in a pond (Biodiversity)
23
Rain water systemWater management
Operation of Equipment to Capture Rainwater
24
Investment and returns
•Financing options
Government support
•Loan with fixed interest rate of 3%
• Energy savings >20%15%
• Energy savings >40%30%
25
Investment and returns
Preparation work
Project planning
Construction works
Service room installation
Carbon reinforceme
nt strips
Roof
Insulation of the flat roof
Solar panels
Green roof
Windows and doors
Plastic windows
Entrance doors
Balcony sliding doors
Small windows in
the staircase
External finishing
Facade, cellar insulation
Facade plastering
Railings, balcony
separation installation
Clay facade tiles
Ventilation
Installation of ventilation
channels
Ventilation system
installation
Rainwater collection
system
Tank installation
Installation of
rainwater pipes
Installation of gutter
Rainwater treatment
system
Completion works
Building recognition suitable
to use
26
Investment and returns
Direct costs (Lt)Material Machinery Employee salaries
56922 212885 2902
Subconstactor cost 325150
Total: 597859
Extra cost 19684
Social security cost 31% 900Total direct costs: 618443
Indirect costs (Lt)Overhead 871
Profit 5% 30966
Total indirect costs: 31837
Total without VAT 650280
VAT 21% 136559
Total with VAT(Lt/EUR) 786839/~230000
27
Investment and returns
•Average heat usage of Žirmunų g.116 building from October 2010
15 kWm/m2
•Planed heat savings after renovation 72%
•Investment per one flat 26.230 Lt•Government financing 7.879 Lt•Month Bank loan per flat 80,25 Lt •Heat cost per year before retrofit 1.350 Lt / flat•Heat cost per year after retrofit 375 Lt/year•Extra maintanace for the building 350 Lt /year•Total savings per flat 963 Lt •Loan period 18,2 years
28
Conclusion
- High level of thermal insulation-Thermal-bridge-free construction- E-low windows- Comfort ventilation - Sustainable materials- Green roof & rainwater system
29