Snefrid Sør

Luva

HaklangPolarled

Gas export

Aasta Hansteen spar FPSO

Licence Partners:

Equinor 51% (Operator)

Wintershall 24%

OMV 15%

ConocoPhillips 10%

➢ Transfer operation at Ølen (Westcon) by Dockwise

• Topside transported on White Marlin on four (4) MSF supports (LSF)

• Topside support on two (2) Dockwise S-class HTV as “catamaran” condition

• Four (DFSU) supports on each S-class

➢ Grillage and sea-fastening on S-class

• Primary grillage and DFSU (8 off) pre-installed on S-class before transfer operation

• DLS (“dynamic load supports”) (8 off) connected at Ølen after Topside transfer to S-class

➢ Topside transport on S-class Ølen (dual barge)

• Topside “float-over and mating” between mooring line 4 and 5

• Simulation performed at “MARIN” in Wageningen (4 sessions)

➢ Final guiding and first load transfer (2x1500T) by use of TMU

Subtitle to be placed here

21/4 29/8

4/428/5 13/11

H-link

Suction anchor

Ballgrab

Polyester

Chain

Water

depth

Fish farmsPlatform structures

Power cables, 140m

Coastal tow

• Weather window operation (3days)

• Full depth survey of route

Unrestricted offshore tow

• 10-yr design storm (Hs=10m)

• Allow free drifting

• Water depth >600m

Inshore tow