aesrd sirs - impact assessment agency › 050 › documents › p61436 › 100349e.pdf · !p!p #*...

Post on 06-Jun-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

!P

!P

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

kjkj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

kj

Robb

T 50

T 49

R 21

T 48

R 20

Mercoal

R 22 R 19 R 18

T 47

T 46

R 17 W5M

I.R.

233

Maximum = 0.746 keq/ha/yr

0.22

0.23

0.23

0.23

��40

��47

��40

Erith R iver

R

aven Creek

Mitc

hel

l Creek

White

Cree

k

HanlanC

reek

Rain

bow

Creek

Rodney Creek

Bryan

C reek

Cha

nce

Cre

ek

Lost Creek

Halp

enny

Cr e

ek

Felton

Cre

ek

Meadow Creek

McL

eod

Riv

er

Ra

ven

Cre

ek

Prest Creek

Pem

bina

River

E

mb

ar

ras

River

Lovett

R

iver

Len

dru

mC

reek

Pembina River

Bea

verdam

Creek

McNeill C

reek

Centre Creek

B ai ley Creek

Crooked

Creek

Hans

on Creek

Elk

Creek

0.25

0.30.5

0.22

50

25

0.23

R9

R8

R7

R6

R5

R4

R3

R2

R1

R18

R17

R16

R15

R14

R13

R12

R11

R10

490000

490000

500000

500000

510000

510000

520000

520000

530000

530000

540000

540000

58

70

00

0

58

70

00

0

58

80

00

0

58

80

00

0

58

90

00

0

58

90

00

0

59

00

00

0

59

00

00

0

59

10

00

0

59

10

00

0

Ma

p D

ocu

me

nt:

(K

:\A

ctive

Pro

jects

20

08

\Pro

jects

08

-00

1 t

o 0

8-0

50

\08

-04

1 R

ob

b T

ren

d\F

ina

l D

ocs\S

IR\F

ig 1

8-1

Pre

dic

ted

An

nu

al P

ote

ntia

l Acid

In

pu

t D

ep

ositio

n -

Ba

se

line

.mxd

)8/1

6/1

2 -

- 1

2:1

8:1

0 P

M

18-1

PS

PS

Aug 16/12

08-041PROJECT:

DATE:

CHECKED:

DRAWN: FIGURE:

PROJECT:

TITLE:

0 5 102.5

Kilometres

REF: CVRI, Mining Stage Total Disturb_27Jun11.dwg; Geobase, 2011; MEMS, 2011.

Legend

kj Special Receptor

_̂ Coal Valley Mine Wash Plant

#* Gas Plant or Compressor Station

Regional Study Area

Concentration Isopleth

Existing Mine Permit Boundary

Pending Mine Permit Boundary

Proposed Mine Permit Boundary

Proposed Footprint Disturbance

Existing Haul Road

Existing Gravel Road

Highway

RegionalStudy Area

Fort McMurray!(

Calgary

Edmonton

Coal Valley MineRobb Trend Project

!P

#*

#*

kj

kj

kj

kj

kj

kj

kj

Robb

T 50

T 49

R 22 R 21 W5M

Maximum = 0.257 keq/ha/yr

0.213

0.24

0.216

��47

Bryan

Creek

Chance

Cre

ek

Hay Cree

FeltonC

reek

Jackson

Embarr

as

Riv

er

30

0.22

R8

R2

R1

R16

R15

R11

490000

490000

492500

492500

495000

495000

497500

497500

500000

500000

502500

502500

58

95

00

0

58

95

00

0

58

97

50

0

58

97

50

0

59

00

00

0

59

00

00

0

59

02

50

0

59

02

50

0

59

05

00

0

59

05

00

0

0 1.6 3.20.8

Kilometres

I

Topography (masl)High : 1675

Low : 950

Area Enlarged

Label Receptor Label Receptor

R1 SE Robb R10 Steeper AQ Station

R2 NW Robb R11 Yellowhead Tower

R3 Robb-Denison Road Intersection R12 Lovett River Campground

R4 Lund Road at Lendrum Creek R13 Lovett Tower

R5 Halpenny Creek and Erith River R14 Campground

R6 Former Coalspur Cabin R15 Residence

R7 Mercoal R16 Cabin 1

R8 Oke R17 Cabin 2

R9 Embarras R18 Fairfax Lake

Predicted Annual Potential Acid InputDeposition (keq/ha/yr) - Baseline Case

!P

!P

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

Robb

T 50

T 49

R 21

T 48

R 20

Mercoal

R 22 R 19 R 18

T 47

T 46

R 17 W5M

I.R.

233

Maximum = 0.751 keq/ha/yr

0.22

0.25

0.3

0.25

��40

��47

��40

Erith R iver

R

aven Creek

Mitc

hel

l Creek

White

Cree

k

HanlanC

reek

Rain

bow

Creek

Rodney Creek

Bryan

C reek

Cha

nce

Cre

ek

Lost Creek

Halp

enny

Cr e

ek

Felton

Cre

ek

Meadow Creek

McL

eod

Riv

er

Ra

ven

Cre

ek

Prest Creek

Pem

bina

River

E

mb

ar

ras

River

Lovett

R

iver

Len

dru

mC

reek

Pembina River

Bea

verdam

Creek

McNeill C

reek

Centre Creek

B ai ley Creek

Crooked

Creek

Hans

on Creek

Elk

Creek

0.25

0.30.5

0.22

490000

490000

500000

500000

510000

510000

520000

520000

530000

530000

540000

540000

58

70

00

0

58

70

00

0

58

80

00

0

58

80

00

0

58

90

00

0

58

90

00

0

59

00

00

0

59

00

00

0

59

10

00

0

59

10

00

0

Ma

p D

ocu

me

nt:

(K

:\A

ctive

Pro

jects

20

08

\Pro

jects

08

-00

1 t

o 0

8-0

50

\08

-04

1 R

ob

b T

ren

d\F

ina

l D

ocs\S

IR\F

ig 1

8-2

Pre

dic

ted

An

nu

al P

ote

ntia

l Acid

In

pu

t D

ep

ositio

n -

Ap

plic

atio

n.m

xd

)8/1

5/1

2 -

- 3

:39

:30

PM

18-2

PS

PS

Aug 14/12

08-041PROJECT:

DATE:

CHECKED:

DRAWN: FIGURE:

PROJECT:

TITLE:

0 5 102.5

Kilometres

REF: CVRI, Mining Stage Total Disturb_27Jun11.dwg; Geobase, 2011; MEMS, 2012.

Legend

kj Special Receptor

_̂ Coal Valley Mine Wash Plant

#* Gas Plant or Compressor Station

Regional Study Area

Concentration Isopleth

Existing Mine Permit Boundary

Pending Mine Permit Boundary

Proposed Mine Permit Boundary

Proposed Footprint Disturbance

Existing Haul Road

Existing Gravel Road

Highway

RegionalStudy Area

Fort McMurray!(

Calgary

Edmonton

Coal Valley MineRobb Trend Project

!P

#*

#*

kj

kj

kj

kj

kj

kj

kj

Robb

T 50

T 49

R 22 R 21 W5M

Maximum = 0.411 keq/ha/yr

0.25

0.28

0.25

��47

Bryan

Creek

Chance

Cre

ek

Hay Cree

FeltonC

reek

Jackson

Embarr

as

Riv

er

0.22

0.28

0.36

R8

R2

R1

R16

R15

R11

490000

490000

492500

492500

495000

495000

497500

497500

500000

500000

502500

502500

58

95

00

0

58

95

00

0

58

97

50

0

58

97

50

0

59

00

00

0

59

00

00

0

59

02

50

0

59

02

50

0

59

05

00

0

59

05

00

0

0 1.6 3.20.8

Kilometres

I

Predicted Annual Potential Acid InputDeposition (keq/ha/yr) - Applicationand Planned Development Cases

Topography (masl)High : 1675

Low : 950

Area Enlarged

Label Receptor Label Receptor

R1 SE Robb R10 Steeper AQ Station

R2 NW Robb R11 Yellowhead Tower

R3 Robb-Denison Road Intersection R12 Lovett River Campground

R4 Lund Road at Lendrum Creek R13 Lovett Tower

R5 Halpenny Creek and Erith River R14 Campground

R6 Former Coalspur Cabin R15 Residence

R7 Mercoal R16 Cabin 1

R8 Oke R17 Cabin 2

R9 Embarras R18 Fairfax Lake

!P

!P

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

Robb

T 50

T 49

R 21

T 48

R 20

Mercoal

R 22 R 19 R 18

T 47

T 46

R 17 W5M

I.R.

233

Maximum = 0.395 keq/ha/yr

0.22

��40

��47

��40

Erith R iver

R

aven Creek

Mitc

hel

l Creek

White

Cree

k

HanlanC

reek

Rain

bow

Creek

Rodney Creek

Bryan

C reek

Cha

nce

Cre

ek

Lost Creek

Halp

enny

Cr e

ek

Felton

Cre

ek

Meadow Creek

McL

eod

Riv

er

Ra

ven

Cre

ek

Prest Creek

Pem

bina

River

E

mb

ar

ras

River

Lovett

R

iver

Len

dru

mC

reek

Pembina River

Bea

verdam

Creek

McNeill C

reek

Centre Creek

B ai ley Creek

Crooked

Creek

Hans

on Creek

Elk

Creek

0.250.35

0.22

490000

490000

500000

500000

510000

510000

520000

520000

530000

530000

540000

540000

58

70

00

0

58

70

00

0

58

80

00

0

58

80

00

0

58

90

00

0

58

90

00

0

59

00

00

0

59

00

00

0

59

10

00

0

59

10

00

0

Ma

p D

ocu

me

nt:

(K

:\A

ctive

Pro

jects

20

08

\Pro

jects

08

-00

1 t

o 0

8-0

50

\08

-04

1 R

ob

b T

ren

d\F

ina

l D

ocs\S

IR\F

ig 1

8-3

Pre

dic

ted

An

nu

al P

ote

ntia

l Acid

In

pu

t D

ep

ositio

n -

Pro

ject.

mxd

)8/1

5/1

2 -

- 3

:42

:50

PM

18-3

PS

PS

Aug 15/12

08-041PROJECT:

DATE:

CHECKED:

DRAWN: FIGURE:

PROJECT:

TITLE:

0 5 102.5

Kilometres

REF: CVRI, Mining Stage Total Disturb_27Jun11.dwg; Geobase, 2011; MEMS, 2011.

Legend

kj Special Receptor

_̂ Coal Valley Mine Wash Plant

#* Gas Plant or Compressor Station

Regional Study Area

Concentration Isopleth

Existing Mine Permit Boundary

Pending Mine Permit Boundary

Proposed Mine Permit Boundary

Proposed Footprint Disturbance

Existing Haul Road

Existing Gravel Road

Highway

RegionalStudy Area

Fort McMurray!(

Calgary

Edmonton

Coal Valley MineRobb Trend Project

!P

#*

#*

kj

kj

kj

kj

kj

kj

kj

Robb

T 50

T 49

R 22 R 21 W5M

Maximum = 0.395 keq/ha/yr

0.22

0.25

0.3

��47

Bryan

Creek

Chance

Cre

ek

Hay Cree

FeltonC

reek

Jackson

Embarr

as

Riv

er

0.35

R8

R2

R1

R16

R15

R11

490000

490000

492500

492500

495000

495000

497500

497500

500000

500000

502500

502500

58

95

00

0

58

95

00

0

58

97

50

0

58

97

50

0

59

00

00

0

59

00

00

0

59

02

50

0

59

02

50

0

59

05

00

0

59

05

00

0

0 1.6 3.20.8

Kilometres

I

Predicted Annual Potential Acid InputDeposition (keq/ha/yr) - Project Only Case

Topography (masl)High : 1675

Low : 950

Area Enlarged

Label Receptor Label Receptor

R1 SE Robb R10 Steeper AQ Station

R2 NW Robb R11 Yellowhead Tower

R3 Robb-Denison Road Intersection R12 Lovett River Campground

R4 Lund Road at Lendrum Creek R13 Lovett Tower

R5 Halpenny Creek and Erith River R14 Campground

R6 Former Coalspur Cabin R15 Residence

R7 Mercoal R16 Cabin 1

R8 Oke R17 Cabin 2

R9 Embarras R18 Fairfax Lake

19-1DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Annual 90th Percentile NO2 ConcentrationsMeasured at Hightower Ridge and SteeperStations (CASA, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley MineRobb Trend Project

19-2DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Annual 90th Percentile SO2 ConcentrationsMeasured at Hightower Ridge and SteeperStations (CASA, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley MineRobb Trend Project

19-3DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Annual 90th Percentile PM10Concentrations Measured at HightowerRidge and Steeper Stations (CASA, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley MineRobb Trend Project

19-4DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Annual 90th Percentile PM2.5Concentrations Measured at HightowerRidge and Steeper Stations (CASA, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley MineRobb Trend Project

19-5

DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Annual Concentrations of Sulfur Dioxide in

Canada, 1974-2009 (Fraser Institute, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

19-6

DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Average annual concentrations of Nitrogen

Dioxide in Canada, 1980-2009 (Fraser

Institute, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

19-7

DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Average annual concentrations of Carbon

Monoxide in Canada, 1974-2009 (Fraser

Institute, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

19-8

DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 26/12

08-041

Concentrations of ultrafine particular

matter in Canada, 2000-2009 (Fraser

Institute, 2012)

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

24-1

DRAWN:

CHECKED:

DATE:

PROJECT: 08-041

Dustfall Measurements at Two of

GCCoal Monitoring Sites

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

FILE: ...Final Docs\SIR\ERCB\SIR Drawings.dwg

RS/JG

KP

Dec 5/12

REF: CVRI, 2012.

24-2

DRAWN:

CHECKED:

DATE:

PROJECT: 08-041

Dustfall Measurements at Two of

CVRI Monitoring Sites

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

FILE: ...Final Docs\SIR\ERCB\SIR Drawings.dwg

RS/JG

KP

Dec 5/12

REF: CVRI, 2012.

REF: Reject Bin Cartoon.xls

36-1

DRAWN:

CHECKED:

DATE:

PROJECT: 08-041

Coal Processing Material to Coarse Reject

Bin

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

FILE: ...Final Docs\SIR\ERCB\SIR Drawings.dwg

RS/JG

KP

Dec 5/12

46-1DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 27/12

08-041

Increase in TSP Concentration withDeposition, as a function of PredictedConcentration

TITLE:

PROJECT:

FIGURE:

Coal Valley MineRobb Trend Project

51-1DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 27/12

08-041

Diurnal Variation of PM10 Concentrationsat Steeper, Hinton and Hightower Ridge

TITLE:

PROJECT:

FIGURE:

Coal Valley MineRobb Trend Project

51-2

DRAWN:

FILE: SIR Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS

JT

Nov 27/12

08-041

Seasonal Variation of PM10 Concentrations

at Steeper, Hinton and Hightower Ridge

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

51-3

DRAWN:

CHECKED:

DATE:

PROJECT: 08-041

Diurnal Variation of Wind Speeds at the Four West

Central Airshed Society Stations

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

FILE: ..Final Docs\SIR\SIR AESRD Drawings.dwg

RS/JG

KP

Dec 5/12

54-1

DRAWN:

FILE: ..Final Docs\SIR\SIR AESRD Drawings.dwg

CHECKED:

DATE:

PROJECT:

RS/JG

KP

Dec 5/12

08-041

Measurements and CALMET Wind Roses at

Suncor Hanlan Robb Gas Plant and CVRI Office

Locations

TITLE:

PROJECT:

FIGURE:

Coal Valley Mine

Robb Trend Project

top related