aesrd sirs - impact assessment agency › 050 › documents › p61436 › 100349e.pdf · !p!p #*...
TRANSCRIPT
!P
!P
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
_̂
kjkj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
kj
Robb
T 50
T 49
R 21
T 48
R 20
Mercoal
R 22 R 19 R 18
T 47
T 46
R 17 W5M
I.R.
233
Maximum = 0.746 keq/ha/yr
0.22
0.23
0.23
0.23
��40
��47
��40
Erith R iver
R
aven Creek
Mitc
hel
l Creek
White
Cree
k
HanlanC
reek
Rain
bow
Creek
Rodney Creek
Bryan
C reek
Cha
nce
Cre
ek
Lost Creek
Halp
enny
Cr e
ek
Felton
Cre
ek
Meadow Creek
McL
eod
Riv
er
Ra
ven
Cre
ek
Prest Creek
Pem
bina
River
E
mb
ar
ras
River
Lovett
R
iver
Len
dru
mC
reek
Pembina River
Bea
verdam
Creek
McNeill C
reek
Centre Creek
B ai ley Creek
Crooked
Creek
Hans
on Creek
Elk
Creek
0.25
0.30.5
0.22
50
25
0.23
R9
R8
R7
R6
R5
R4
R3
R2
R1
R18
R17
R16
R15
R14
R13
R12
R11
R10
490000
490000
500000
500000
510000
510000
520000
520000
530000
530000
540000
540000
58
70
00
0
58
70
00
0
58
80
00
0
58
80
00
0
58
90
00
0
58
90
00
0
59
00
00
0
59
00
00
0
59
10
00
0
59
10
00
0
Ma
p D
ocu
me
nt:
(K
:\A
ctive
Pro
jects
20
08
\Pro
jects
08
-00
1 t
o 0
8-0
50
\08
-04
1 R
ob
b T
ren
d\F
ina
l D
ocs\S
IR\F
ig 1
8-1
Pre
dic
ted
An
nu
al P
ote
ntia
l Acid
In
pu
t D
ep
ositio
n -
Ba
se
line
.mxd
)8/1
6/1
2 -
- 1
2:1
8:1
0 P
M
18-1
PS
PS
Aug 16/12
08-041PROJECT:
DATE:
CHECKED:
DRAWN: FIGURE:
PROJECT:
TITLE:
0 5 102.5
Kilometres
REF: CVRI, Mining Stage Total Disturb_27Jun11.dwg; Geobase, 2011; MEMS, 2011.
Legend
kj Special Receptor
_̂ Coal Valley Mine Wash Plant
#* Gas Plant or Compressor Station
Regional Study Area
Concentration Isopleth
Existing Mine Permit Boundary
Pending Mine Permit Boundary
Proposed Mine Permit Boundary
Proposed Footprint Disturbance
Existing Haul Road
Existing Gravel Road
Highway
RegionalStudy Area
Fort McMurray!(
Calgary
Edmonton
Coal Valley MineRobb Trend Project
!P
#*
#*
kj
kj
kj
kj
kj
kj
kj
Robb
T 50
T 49
R 22 R 21 W5M
Maximum = 0.257 keq/ha/yr
0.213
0.24
0.216
��47
Bryan
Creek
Chance
Cre
ek
Hay Cree
FeltonC
reek
Jackson
Embarr
as
Riv
er
30
0.22
R8
R2
R1
R16
R15
R11
490000
490000
492500
492500
495000
495000
497500
497500
500000
500000
502500
502500
58
95
00
0
58
95
00
0
58
97
50
0
58
97
50
0
59
00
00
0
59
00
00
0
59
02
50
0
59
02
50
0
59
05
00
0
59
05
00
0
0 1.6 3.20.8
Kilometres
I
Topography (masl)High : 1675
Low : 950
Area Enlarged
Label Receptor Label Receptor
R1 SE Robb R10 Steeper AQ Station
R2 NW Robb R11 Yellowhead Tower
R3 Robb-Denison Road Intersection R12 Lovett River Campground
R4 Lund Road at Lendrum Creek R13 Lovett Tower
R5 Halpenny Creek and Erith River R14 Campground
R6 Former Coalspur Cabin R15 Residence
R7 Mercoal R16 Cabin 1
R8 Oke R17 Cabin 2
R9 Embarras R18 Fairfax Lake
Predicted Annual Potential Acid InputDeposition (keq/ha/yr) - Baseline Case
!P
!P
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
_̂
Robb
T 50
T 49
R 21
T 48
R 20
Mercoal
R 22 R 19 R 18
T 47
T 46
R 17 W5M
I.R.
233
Maximum = 0.751 keq/ha/yr
0.22
0.25
0.3
0.25
��40
��47
��40
Erith R iver
R
aven Creek
Mitc
hel
l Creek
White
Cree
k
HanlanC
reek
Rain
bow
Creek
Rodney Creek
Bryan
C reek
Cha
nce
Cre
ek
Lost Creek
Halp
enny
Cr e
ek
Felton
Cre
ek
Meadow Creek
McL
eod
Riv
er
Ra
ven
Cre
ek
Prest Creek
Pem
bina
River
E
mb
ar
ras
River
Lovett
R
iver
Len
dru
mC
reek
Pembina River
Bea
verdam
Creek
McNeill C
reek
Centre Creek
B ai ley Creek
Crooked
Creek
Hans
on Creek
Elk
Creek
0.25
0.30.5
0.22
490000
490000
500000
500000
510000
510000
520000
520000
530000
530000
540000
540000
58
70
00
0
58
70
00
0
58
80
00
0
58
80
00
0
58
90
00
0
58
90
00
0
59
00
00
0
59
00
00
0
59
10
00
0
59
10
00
0
Ma
p D
ocu
me
nt:
(K
:\A
ctive
Pro
jects
20
08
\Pro
jects
08
-00
1 t
o 0
8-0
50
\08
-04
1 R
ob
b T
ren
d\F
ina
l D
ocs\S
IR\F
ig 1
8-2
Pre
dic
ted
An
nu
al P
ote
ntia
l Acid
In
pu
t D
ep
ositio
n -
Ap
plic
atio
n.m
xd
)8/1
5/1
2 -
- 3
:39
:30
PM
18-2
PS
PS
Aug 14/12
08-041PROJECT:
DATE:
CHECKED:
DRAWN: FIGURE:
PROJECT:
TITLE:
0 5 102.5
Kilometres
REF: CVRI, Mining Stage Total Disturb_27Jun11.dwg; Geobase, 2011; MEMS, 2012.
Legend
kj Special Receptor
_̂ Coal Valley Mine Wash Plant
#* Gas Plant or Compressor Station
Regional Study Area
Concentration Isopleth
Existing Mine Permit Boundary
Pending Mine Permit Boundary
Proposed Mine Permit Boundary
Proposed Footprint Disturbance
Existing Haul Road
Existing Gravel Road
Highway
RegionalStudy Area
Fort McMurray!(
Calgary
Edmonton
Coal Valley MineRobb Trend Project
!P
#*
#*
kj
kj
kj
kj
kj
kj
kj
Robb
T 50
T 49
R 22 R 21 W5M
Maximum = 0.411 keq/ha/yr
0.25
0.28
0.25
��47
Bryan
Creek
Chance
Cre
ek
Hay Cree
FeltonC
reek
Jackson
Embarr
as
Riv
er
0.22
0.28
0.36
R8
R2
R1
R16
R15
R11
490000
490000
492500
492500
495000
495000
497500
497500
500000
500000
502500
502500
58
95
00
0
58
95
00
0
58
97
50
0
58
97
50
0
59
00
00
0
59
00
00
0
59
02
50
0
59
02
50
0
59
05
00
0
59
05
00
0
0 1.6 3.20.8
Kilometres
I
Predicted Annual Potential Acid InputDeposition (keq/ha/yr) - Applicationand Planned Development Cases
Topography (masl)High : 1675
Low : 950
Area Enlarged
Label Receptor Label Receptor
R1 SE Robb R10 Steeper AQ Station
R2 NW Robb R11 Yellowhead Tower
R3 Robb-Denison Road Intersection R12 Lovett River Campground
R4 Lund Road at Lendrum Creek R13 Lovett Tower
R5 Halpenny Creek and Erith River R14 Campground
R6 Former Coalspur Cabin R15 Residence
R7 Mercoal R16 Cabin 1
R8 Oke R17 Cabin 2
R9 Embarras R18 Fairfax Lake
!P
!P
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
_̂
Robb
T 50
T 49
R 21
T 48
R 20
Mercoal
R 22 R 19 R 18
T 47
T 46
R 17 W5M
I.R.
233
Maximum = 0.395 keq/ha/yr
0.22
��40
��47
��40
Erith R iver
R
aven Creek
Mitc
hel
l Creek
White
Cree
k
HanlanC
reek
Rain
bow
Creek
Rodney Creek
Bryan
C reek
Cha
nce
Cre
ek
Lost Creek
Halp
enny
Cr e
ek
Felton
Cre
ek
Meadow Creek
McL
eod
Riv
er
Ra
ven
Cre
ek
Prest Creek
Pem
bina
River
E
mb
ar
ras
River
Lovett
R
iver
Len
dru
mC
reek
Pembina River
Bea
verdam
Creek
McNeill C
reek
Centre Creek
B ai ley Creek
Crooked
Creek
Hans
on Creek
Elk
Creek
0.250.35
0.22
490000
490000
500000
500000
510000
510000
520000
520000
530000
530000
540000
540000
58
70
00
0
58
70
00
0
58
80
00
0
58
80
00
0
58
90
00
0
58
90
00
0
59
00
00
0
59
00
00
0
59
10
00
0
59
10
00
0
Ma
p D
ocu
me
nt:
(K
:\A
ctive
Pro
jects
20
08
\Pro
jects
08
-00
1 t
o 0
8-0
50
\08
-04
1 R
ob
b T
ren
d\F
ina
l D
ocs\S
IR\F
ig 1
8-3
Pre
dic
ted
An
nu
al P
ote
ntia
l Acid
In
pu
t D
ep
ositio
n -
Pro
ject.
mxd
)8/1
5/1
2 -
- 3
:42
:50
PM
18-3
PS
PS
Aug 15/12
08-041PROJECT:
DATE:
CHECKED:
DRAWN: FIGURE:
PROJECT:
TITLE:
0 5 102.5
Kilometres
REF: CVRI, Mining Stage Total Disturb_27Jun11.dwg; Geobase, 2011; MEMS, 2011.
Legend
kj Special Receptor
_̂ Coal Valley Mine Wash Plant
#* Gas Plant or Compressor Station
Regional Study Area
Concentration Isopleth
Existing Mine Permit Boundary
Pending Mine Permit Boundary
Proposed Mine Permit Boundary
Proposed Footprint Disturbance
Existing Haul Road
Existing Gravel Road
Highway
RegionalStudy Area
Fort McMurray!(
Calgary
Edmonton
Coal Valley MineRobb Trend Project
!P
#*
#*
kj
kj
kj
kj
kj
kj
kj
Robb
T 50
T 49
R 22 R 21 W5M
Maximum = 0.395 keq/ha/yr
0.22
0.25
0.3
��47
Bryan
Creek
Chance
Cre
ek
Hay Cree
FeltonC
reek
Jackson
Embarr
as
Riv
er
0.35
R8
R2
R1
R16
R15
R11
490000
490000
492500
492500
495000
495000
497500
497500
500000
500000
502500
502500
58
95
00
0
58
95
00
0
58
97
50
0
58
97
50
0
59
00
00
0
59
00
00
0
59
02
50
0
59
02
50
0
59
05
00
0
59
05
00
0
0 1.6 3.20.8
Kilometres
I
Predicted Annual Potential Acid InputDeposition (keq/ha/yr) - Project Only Case
Topography (masl)High : 1675
Low : 950
Area Enlarged
Label Receptor Label Receptor
R1 SE Robb R10 Steeper AQ Station
R2 NW Robb R11 Yellowhead Tower
R3 Robb-Denison Road Intersection R12 Lovett River Campground
R4 Lund Road at Lendrum Creek R13 Lovett Tower
R5 Halpenny Creek and Erith River R14 Campground
R6 Former Coalspur Cabin R15 Residence
R7 Mercoal R16 Cabin 1
R8 Oke R17 Cabin 2
R9 Embarras R18 Fairfax Lake
19-1DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Annual 90th Percentile NO2 ConcentrationsMeasured at Hightower Ridge and SteeperStations (CASA, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley MineRobb Trend Project
19-2DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Annual 90th Percentile SO2 ConcentrationsMeasured at Hightower Ridge and SteeperStations (CASA, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley MineRobb Trend Project
19-3DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Annual 90th Percentile PM10Concentrations Measured at HightowerRidge and Steeper Stations (CASA, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley MineRobb Trend Project
19-4DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Annual 90th Percentile PM2.5Concentrations Measured at HightowerRidge and Steeper Stations (CASA, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley MineRobb Trend Project
19-5
DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Annual Concentrations of Sulfur Dioxide in
Canada, 1974-2009 (Fraser Institute, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
19-6
DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Average annual concentrations of Nitrogen
Dioxide in Canada, 1980-2009 (Fraser
Institute, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
19-7
DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Average annual concentrations of Carbon
Monoxide in Canada, 1974-2009 (Fraser
Institute, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
19-8
DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 26/12
08-041
Concentrations of ultrafine particular
matter in Canada, 2000-2009 (Fraser
Institute, 2012)
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
24-1
DRAWN:
CHECKED:
DATE:
PROJECT: 08-041
Dustfall Measurements at Two of
GCCoal Monitoring Sites
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
FILE: ...Final Docs\SIR\ERCB\SIR Drawings.dwg
RS/JG
KP
Dec 5/12
REF: CVRI, 2012.
24-2
DRAWN:
CHECKED:
DATE:
PROJECT: 08-041
Dustfall Measurements at Two of
CVRI Monitoring Sites
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
FILE: ...Final Docs\SIR\ERCB\SIR Drawings.dwg
RS/JG
KP
Dec 5/12
REF: CVRI, 2012.
REF: Reject Bin Cartoon.xls
36-1
DRAWN:
CHECKED:
DATE:
PROJECT: 08-041
Coal Processing Material to Coarse Reject
Bin
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
FILE: ...Final Docs\SIR\ERCB\SIR Drawings.dwg
RS/JG
KP
Dec 5/12
46-1DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 27/12
08-041
Increase in TSP Concentration withDeposition, as a function of PredictedConcentration
TITLE:
PROJECT:
FIGURE:
Coal Valley MineRobb Trend Project
51-1DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 27/12
08-041
Diurnal Variation of PM10 Concentrationsat Steeper, Hinton and Hightower Ridge
TITLE:
PROJECT:
FIGURE:
Coal Valley MineRobb Trend Project
51-2
DRAWN:
FILE: SIR Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS
JT
Nov 27/12
08-041
Seasonal Variation of PM10 Concentrations
at Steeper, Hinton and Hightower Ridge
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
51-3
DRAWN:
CHECKED:
DATE:
PROJECT: 08-041
Diurnal Variation of Wind Speeds at the Four West
Central Airshed Society Stations
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project
FILE: ..Final Docs\SIR\SIR AESRD Drawings.dwg
RS/JG
KP
Dec 5/12
54-1
DRAWN:
FILE: ..Final Docs\SIR\SIR AESRD Drawings.dwg
CHECKED:
DATE:
PROJECT:
RS/JG
KP
Dec 5/12
08-041
Measurements and CALMET Wind Roses at
Suncor Hanlan Robb Gas Plant and CVRI Office
Locations
TITLE:
PROJECT:
FIGURE:
Coal Valley Mine
Robb Trend Project