about the project i

Post on 07-Jun-2022

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

I

The tertiary treated

water is disinfected

with chlorine prior to

collecting it into the

treated water storage

tank.

The chlorinated water

is further UV treated

to ensure further dis-

infection of the

treated water prior to

watering the cricket

ground or garden

The BOD at outlet is

less than 10 ppm.Primary Treatment - to remove large solid wasteSecondary Treatment - MBBR process - Aerobic Biodegradation oforganic wasteTertiary Treatment - Polishing the treated water with Pressurized Sandand Activated Carbon Filter

Karnataka State Cricket Association (KSCA) (Chinnaswamy Stadium) is one ofthe prime cricket stadiums in India. They are India's first green stadium. Inthe same spirit, back in 2014, they had come up with a vision to use treatedand recycled sewage water for water their lawns and cricket ground. The wastewater generation at the KSCA premises from the Toilets,Bathrooms, Kitchen, Club house etc. was not deemed sufficient due tofluctuation in the number of people visiting the stadium. Therefore apermanent and consitent source of sewage was deemed necessary tosupport the huge requirement of water for maintaining lawns and cricketground. It was therefore proposed to augment the wastewater inflow to theproposed treatment plant by drawing wastewater from the BWSSB sewer. A300 mm dia sewer runs under the Queens Road, from which inlet pipe wasto be laid by trenchless technology to the treatment plant site. This project was successfully executed by Oasis Renewables and Water

Treatment Ltd. The packaged STP at KSCA is a fully automated one with atreatment capacity of 200 KLD. The sewage is treated by a three stageprocess :

ABOUT THE PROJECT

top related