4ppt-mine life cycle

Post on 04-Apr-2018

217 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 1/19

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 2/19

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 3/19

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 4/19

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 5/19

• all shapes and sizes (e.g.

surface or underground)e.g. typical medium sizedunderground mine:

Rs 12,000 million capital•Rs 120 million profit / year

•300 workforce

•30 year life

•10 years to find and prove

•3 years to construct

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 6/19

Managed:•profitably (influencedby market forces)

•responsibly and safely

•committed toworkforce, community,

environment

•driven by geologists &engineers

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 7/19

discovery,

development,

production,

closure,reclamation

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 8/19

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 9/19

Artist’s impression of planned open pit and mill.

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 10/19

Artist’s impression of eventual reclaimed mine site.

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 11/19

Surface coal mining operations, loading coal andloading waste rock,.

Cable shovel, front end loaders,off-highway truck, bulldozers,

supervisor’s truck

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 12/19

Room and Pillar Mining Method

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 13/19MMPE 290

DESIGN, SELECT SCALE & TECHNOLOGY

WASTE

MANAGEMENT

CLOSURE INFRASTRUCTURE

SERVICES

HUMAN

RESOURCES

FEASIBILITY?

TECHNICAL ECONOMICAL

NO

ENVIRONMENTAL SOCIAL POLITICAL

NO SUSTAINABLE

YES

PLAN & SCHEDULE

SELECT MINING (MILLING) METHOD

LOCATE & DEFINE DEPOSIT

EXPLORATION

MINE BUILDING:

IN PRINCIPLE

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 14/19

Mineral Deposits

•Geology

Mineralogy•Mining Method

•Mineral Processing

•Economics

•Environmental controls

Finding

•Regional Geology

•Geochemistry

•Geophysics

•Drilling

•Sampling

Opening &Developing

•Shaft sinking

•Tunneling

•Waste removal

•Underground &surface construction

Planning

•Select Mining Method

•Design ExcavationGeometry, Size,Sequence

•Select equipment

Proving

Delineation drilling•Shaft/tunneling

•Ore Estimation

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 15/19

Mining

•Fragmentation

Loading•Materials Handling

•Production Control

•Maintenance

•Health & Safety

•Ventilation

•Water Control

•Grade Control

•Reclamation

Geology Sampling

•Surveying

•Ground Control

•Design & Engineering

•Supply Services

•Power

•Human Resources

Ore forProcessing

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 16/19

Processing

Conversion of mineralraw products toconsumer products

•Classification

•Beneficiation

•Smelting & Refining

•Material Science

•Properties & uses ofmineral products

•Sales

Size Reduction•Concentration

•Mill & Plant Design

•Environmental Control

Marketing

Products for fabricationor other end uses

•Establish Grades

Specifications &Standards

•Transport toCustomers

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 17/19

Mineral Deposits and Orebodies

• A Mineral Deposit is a

geologic occurrence

of minerals in

relatively

concentrated form.

• An Orebody is a

Mineral Deposit that

has sufficient value

that it can be mined

at a profit.

Mineral

Deposit Ore Body

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 18/19

Orebody: Grade, Size, Shape, Depth

Topography

Climate

Market Conditions

Appropriate Technology

Environmental, Social Issues

7/30/2019 4ppt-Mine Life Cycle

http://slidepdf.com/reader/full/4ppt-mine-life-cycle 19/19

How much waste rock is mined with

the ore.

How much of the orebody cannot be

recovered

• impact

measures