PTIL seminar on pipeline integrity 9. December 2009
BP Pipeline ManagementRisk assessment, operation experience
and lessons learned
Per Olav Gartland, John Berget and Bente Herfjord
FORCE Technology Norway AS
and
Inge J. Mæland and Alf Inge Lyse
BP Norway
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 2/22
PTIL seminar on pipeline integrity 9. December 2009
Pipeline Integrity Management
to ensure the technical integrity of the pipeline, i.e.:
to operate within acceptable safety margins and
optimised economy throughout the lifetime
» avoid failures and incidents» re-qualification and life extension of old pipelines
» optimize life cycle cost (LCC)
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 3/22
PTIL seminar on pipeline integrity 9. December 2009
BP Norway PIM Strategy
Risk AssessmentEvaluate internal/external conditionIdentify critical parameters and accept criteria (KPI s)
MonitoringCorrosion monitoring
Critical process parameters (KPI`)Free span, burial, CP etc.
Status Reporting (quarterly)
Inspection
Internal and external inspection plansDetail inspection planning (scope, inspection method/practical arrangements etc.)Inspection (ILI, ROV)Evaluate inspection results/finding & take actions
Maintenance activitiesCleaning (pig)
General maintenance of valves and pig receivers and launcher.
RiskAssessment
MonitoringInspect ion plan
Imp lementworkscope
Execute Monitor ingInspect ion
Evaluate
Findings Act ions
IN S P E C T IO N & C O R R O S I O N M A N A G E M E N T
Follow up
Update plan
Control
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 4/22
PTIL seminar on pipeline integrity 9. December 2009
BPs Engineering Technical Practice ETPs
PR 43 Pipeline ETP Rationale and Philosophy
GP 43-17 Pipeline Risk ManagementGIS 43-213 Pipeline Spanning (DNV RP F105)
GP 43-23 Offshore Facilities for Pipelines
GP 43-24 GIS and Mapping
GP 43-26 Offshore SurveysGP 43-36 Pipeline Protection
GP 43-37 Control Systems for Pipelines
GP 43-39 Measurement and Sampling on Pipelines
GP 43-48 Pipeline Operations Organisation Setup
GP 43-49 Pipeline Integrity Management Systems (PIMS)GP 43-50 Pigging, Pig Launchers, and Receivers
GP 43-51 Maintenance and Reliability
GP 43-52 Inspection and Integrity Assessment of PipelinesGP 43-53 Pipeline Intervention and Repair
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 5/22
PTIL seminar on pipeline integrity 9. December 2009
INTERNAL Load effects
Corrosion caused by
CO2 / HAc
H2S
Bacteria (deposit)
Erosion caused by
particle (sand)
EXTERNAL Load effects
CorrosionCP system malfunction
Coating quality
Bacteria
HISC
Ground movementsEarth quake
Soil movements
3rd party damageImpact (anchoring etc.)
Sabotage
Mechanical defectsFatigue
Vibration
Risk AssesmentFailure Mechanisms during Operation
RISK = Probability (PoF) x Consequence (CoF)
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 6/22
PTIL seminar on pipeline integrity 9. December 2009
Internal Risk Assessment
Quantitative assessment based on:Corrosion features from In-line Inspection (ILI)CorPos-AD pipeline corrosion model
CO2 (Norsok M-506), HAc, H2S, erosion
Additional models (Cassandra) to be implementedModel combined with ILI data
Qualitative assessment
Bacteria corrosion
Integrity check based on DnV RP-F101
Remaining Lifetime EstimationTime to next inspectionMonitoring program parameters and associated critical values
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 7/22
PTIL seminar on pipeline integrity 9. December 2009
CorPos-AD
Database
Graphs
Risk analysis and
Safety Check
Corrosion modeling
Flow modeling
OLGAImport inspection data
Import monitoring data
Import production data
Import chemical injection data
Reports
Combine corrosion model
and monitoring/inspection
CorPos-AD, overview
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 8/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: Hod 12 Multiphase pipeline
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 9/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: Hod multiphase pipeline ILI
Hod
0.0
2.0
4.0
6.0
8.0
10.0
12.0
mai.90 jan.93 okt.95 jul.98 apr.01 jan.04 okt.06 jul.09 apr.12
Time
C o r r o s i o n d e p t h ( m m ) Inspection dataMFL UT
12 Hod multiphase pipeline (CS)
Operation from 1990
ILI 1993, 1994, 1995, 1998, 2004, 2009
Corr. Inhibitor injection 1993
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 10/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: CorPos-AD analysis of Hod multiphase pipeline
CorPos-AD analysis based
on:
Production data
Inhibitor injection data
CR-profile obtained for 4time periods
Max corroded depth vs
time from integration
0
0.2
0.4
0.6
0.8
1
1.2
1.4
0 2000 4000 6000 8000 10000 12000 14000
KP [m]
C o r r o s i o n r a t e [ m m / y e a r ]
CR (1991-1993)
CR (1993-1998)
CR (1998-2000)
CR (2001-2008)
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 11/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: CorPos-AD analysis of Hod multiphase pipeline
Hod
0.0
2.0
4.0
6.0
8.0
10.0
12.0
mai.90 jan.93 okt.95 jul.98 apr.01 jan.04 okt.06 jul.09 apr.12
Time
C o r r o s i o n d e p t h
( m m )
Inspection data
Corpos-AD analysis 2009
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 12/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: Hod Multiphase pipeline CorPos-AD RiskAssessment
ILI data from 2008
Design lifetime = 7
years (2015)
Risk status at end of
design life = OKEstimated remaining
lifetime > 50 years
Future ILI frequency 5years
Zone 1- Pit growth prediction
Critical pit depth according toDnV R P-F101
Blue lines: Pit growth model prediction from 2008 to 2015
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 13/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: Major challenges
Wax deposits in pipeline
UT pig data more sensitiveto residual wax than MFLpig data
MFL and UT data have
different accuracy andresolution
Modification of pig hardwareand software over timemakes it difficult to evaluate
time evolution of corrosionfeatures (e.g. to extractcorrosion rates)
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 14/22
PTIL seminar on pipeline integrity 9. December 2009
Case 1: Hod Multiphase - Corrosion Monitoring
Quarterly status reporting:
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 15/22
PTIL seminar on pipeline integrity 9. December 2009
Case 2: Ula - Ekofisk 20 oil export pipeline
Ula
Tambar
Cod
20 UTS PipelineLength: 70 km from Ekofisk toUla
13 km from Ula to Y Assembly
Ekofisk 2/4 J
Gyda
Ula/GydaWye
Assembly
10 Cod Gas Export(Decommisioned)Length: 26.4 km 8 Tambar Production Flowline
(Decommisioned)Length: 16 km
20 Gyda Oil Export PipelineLength: 24.8 km
10 Spool from Tambar to UGIPLength: 60 m
36 Ekofisk to Teeside
Total length 170 km
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 16/22
PTIL seminar on pipeline integrity 9. December 2009
20 UT pig Launching..
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 17/22
PTIL seminar on pipeline integrity 9. December 2009
Case 2: Ula - Ekofisk 20 oil export pipeline
Production start in 1986
UT
MFL
MFL
Method
Pitting with depth up to 4.4 mmbefore Y-connection
Pitting with depth up to 6.9 mmbefore Y-connection
No findings
Findings
2006
2004
1997
Time of inspection
2006 ILI
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 18/22
PTIL seminar on pipeline integrity 9. December 2009
Case 2: Ula - Ekofisk 20 oil export pipeline
Low production rates
Increased water holdup
Dilution of inhibitor
Changes leading to improved corrosion control
Increased inhibitor injection rates
Increased frequency of cleaning pig runs
Increased frequency of intelligent pig runs
Increased production rate (Tambar)
CorPos/OLGA analysis
0
5
10
15
20
25
30
1992 1994 1996 1998 2000 2002 2004
Year
M a x w a t e r h o l d u p ( % )
Before Y-connection
After Y-connection
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 19/22
PTIL seminar on pipeline integrity 9. December 2009
Case 2: Ula - Ekofisk 20 oil export pipeline
Quarterly status reporting:
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 20/22
PTIL seminar on pipeline integrity 9. December 2009
Lessons Learned (1)
Proper cleaning of pipelines prior to inspection is very important
to ensure good / reliable and comparable inspection data.
Good planning and coordination of the operation is important to
ensure effective utilization of expensive rental equipment
(cleaning pigs and inspection tools)
Dimension control by gauge plate
Hook devices both in front and back of the cleaning/inspection
pigs to ease the pig launch and retrieval from pig launcher /
receiver.
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 21/22
PTIL seminar on pipeline integrity 9. December 2009
Lessons learned (2)
Data on corrosion rates (CR) required for lifetime estimation
ILI data strongly dependent on method (MFL, UT) andmethod development Difficult to obtain corrosion
rates from ILI data
No corrosion monitoring units on pipelines.
Probes top-side not relevant for the entire pipeline.Good experience from using CR data obtained from CorPos-AD model, adjusted to fit ILI data if required
Low production rates may lead to water accumulation and poor
inhibitor performance in oil export lines with low water content(1-2 %) High frequency of cleaning pigs required
8/12/2019 4 BP Pipeline Management Risk Assessment, Operation Experience and Lessons Learned - Per Olav Gartland (Force Technology)
http://slidepdf.com/reader/full/4-bp-pipeline-management-risk-assessment-operation-experience-and-lessons 22/22
PTIL seminar on pipeline integrity 9. December 2009
Major challenges in the future
Internal
MIC (Microbial Influenced Corrosion)
External
How determine anode depletion for buried pipelines?
How to inspect for HISC risk of CRA pipelines?