2020 entry point schedule effective date: 04/17/2020 ... · this schedule may not include all...

Post on 27-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

ALLIANCE CITY PWSOH7600011

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658271EP001

Facility Name: ALLIANCE CITY

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

EP001

Sample daily when Chlorine Dioxideis applied.

CHLORITE - 1009 1

Sample daily when Chlorine Dioxideis applied.

CHLORINE DIOXIDE - 1008 1

Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

ALLIANCE CITY PWSOH7600011

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658271EP001/LT2001

Facility Name: ALLIANCE CITY

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

ALLIANCE CITY PWSOH7600011

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658271LT2001

Facility Name: ALLIANCE CITY

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

ALLIANCE CITY PWSOH7600011

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20203CHLORITE - 1009 1/1/2020 andSample(s) Required between 2/29/20203 2/1/2020 andSample(s) Required between 3/31/20203 3/1/2020 andSample(s) Required between 4/30/20203 4/1/2020 andSample(s) Required between 5/31/20203 5/1/2020 andSample(s) Required between 6/30/20203 6/1/2020 andSample(s) Required between 7/31/20203 7/1/2020 andSample(s) Required between 8/31/20203 8/1/2020 andSample(s) Required between 9/30/20203 9/1/2020 andSample(s) Required between 10/31/20203 10/1/2020 andSample(s) Required between 11/30/20203 11/1/2020 andSample(s) Required between 12/31/20203 12/1/2020 and

One sample at each of the following locations: near the first customer, at a location representative of the average residence time, and at alocation reflecting maximum residence time of the water in the distribution system. Consult Chlorine Dioxide plan approval for additionaldistribution requirements unique to your system.

Sample(s) Required between 1/31/202025TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and

Sample(s) Required between 1/31/202025TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 and

ALLIANCE CITY PWSOH7600011

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 12/31/202025TOTAL CHLORINE - 1000 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 TRACTOR SUPPLY 2520 W. STATE ST.

Dual Sample Required between 1/7/2020at: DS201DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2014/1/2020 andDual Sample Required between 7/7/2020at: DS2017/1/2020 andDual Sample Required between 10/7/2020at: DS20110/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 16125 ARMOUR ST. NE

Dual Sample Required between 1/7/2020at: DS202DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2024/1/2020 andDual Sample Required between 7/7/2020at: DS2027/1/2020 andDual Sample Required between 10/7/2020at: DS20210/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS203 VALERO GAS 3414 S. UNION AVE

Dual Sample Required between 1/7/2020at: DS203DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2034/1/2020 andDual Sample Required between 7/7/2020at: DS2037/1/2020 andDual Sample Required between 10/7/2020at: DS20310/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

ALLIANCE CITY PWSOH7600011

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 HEGGY'S RESTAURANT 1300 W. STATE ST.

Dual Sample Required between 1/7/2020at: DS204DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2044/1/2020 andDual Sample Required between 7/7/2020at: DS2047/1/2020 andDual Sample Required between 10/7/2020at: DS20410/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BEACH CITY VILLAGE PWSOH7600212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 601 SECOND AVE. SE, BEACH CITY

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BEACH CITY VILLAGE PWSOH7600212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 11115 DOLPHIN AVE. SW, BEACH CITY

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BETH MOBILE HOME PARKOH7600312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658274EP001

Facility Name: BETH MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BETH MOBILE HOME PARKOH7600312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BETH MOBILE HOME PARK DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BETH MOBILE HOME PARK DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BETH MOBILE HOME PARKOH7600312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BETH MOBILE HOME PARK DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/202010LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202010 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

BREWSTER VILLAGE PWSOH7600512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658276EP001

Facility Name: BREWSTER PWS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 2Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BREWSTER VILLAGE PWSOH7600512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BREWSTER VILLAGE PWSOH7600512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CANAL FULTON CITY PWSOH7600912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658278EP001

Facility Name: CANAL FULTON CITY OF

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CANAL FULTON CITY PWSOH7600912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20206TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20206 2/1/2020 andSample(s) Required between 3/31/20206 3/1/2020 andSample(s) Required between 4/30/20206 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20206 10/1/2020 andSample(s) Required between 11/30/20206 11/1/2020 andSample(s) Required between 12/31/20206 12/1/2020 and

Sample(s) Required between 1/31/20206TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20206 2/1/2020 andSample(s) Required between 3/31/20206 3/1/2020 andSample(s) Required between 4/30/20206 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20206 10/1/2020 andSample(s) Required between 11/30/20206 11/1/2020 andSample(s) Required between 12/31/20206 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

CANAL FULTON CITY PWSOH7600912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

COUNTRY LAWN CENTEROH7601412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658282EP001

Facility Name: COUNTRY LAWN CENTER

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

COUNTRY LAWN CENTEROH7601412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: COUNTRY LAWN CENTER DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: COUNTRY LAWN CENTER DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

COUNTRY LAWN CENTEROH7601412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: COUNTRY LAWN CENTER DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

EAST CANTON VILLAGE PWSOH7601503

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

EAST CANTON VILLAGE PWSOH7601503

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

EAST SPARTA VILLAGE PWSOH7601612

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662485EP002

Facility Name: VILLAGE OF EAST SPARTA NEW

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020

EAST SPARTA VILLAGE PWSOH7601612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

EAST SPARTA VILLAGE PWSOH7601612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

FOHL VILLAGE MHPOH7601912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658286EP001

Facility Name: FOHL VILLAGE MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Sample for all the analytes listed below:

RADIUM-226 - 4020 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

FOHL VILLAGE MHPOH7601912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FOHL VILLAGE MHP DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FOHL VILLAGE MHP DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

FOHL VILLAGE MHPOH7601912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FOHL VILLAGE MHP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

FORTY CORNERS MOBILE VILLAGEOH7602012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658287EP001

Facility Name: FORTY CORNERS MOBILE VLG

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

FORTY CORNERS MOBILE VILLAGEOH7602012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORTY CORNERS MOBILE VLG DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORTY CORNERS MOBILE VLG DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

FORTY CORNERS MOBILE VILLAGEOH7602012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORTY CORNERS MOBILE VLG DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

JACKSON RIDGE REHABILITATION & CAREOH7602112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658288EP001

Facility Name: JACKSON RIDGE REHABILITATION & CARE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

JACKSON RIDGE REHABILITATION & CAREOH7602112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON RIDGE REHABILITATION DISTRIBDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON RIDGE REHABILITATION DISTRIBDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

JACKSON RIDGE REHABILITATION & CAREOH7602112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON RIDGE REHABILITATION DISTRIBLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 andNot Required

ALTERCARE OF HARTVILLEOH7602212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658289EP001

Facility Name: ALTERCARE OF HARTVILLE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

ALTERCARE OF HARTVILLEOH7602212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALTERCARE OF HARTVILLE DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALTERCARE OF HARTVILLE DISTRIBUTIONDS201 1420 SMITH-KRAMER ROAD

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

ALTERCARE OF HARTVILLEOH7602212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ALTERCARE OF HARTVILLE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

LOUISVILLE MOBILE HOME PARKOH7602512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658291EP001

Facility Name: LOUISVILLE MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredDIOXIN - 2063

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LOUISVILLE MOBILE HOME PARKOH7602512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE MOBILE HOME P DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE MOBILE HOME P DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LOUISVILLE MOBILE HOME PARKOH7602512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE MOBILE HOME P DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

LAKE SHERMAN VILLAGE PWSOH7602712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658292EP001

Facility Name: LAKE SHERMAN VILLAGE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LAKE SHERMAN VILLAGE PWSOH7602712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE SHERMAN VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE SHERMAN VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LAKE SHERMAN VILLAGE PWSOH7602712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE SHERMAN VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LOUISVILLE CITY PWSOH7603012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658294EP001

Facility Name: LOUISVILLE CITY OF

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LOUISVILLE CITY PWSOH7603012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LOUISVILLE CITY PWSOH7603012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MAGNOLIA VILLAGE PWSOH7603112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658295EP001

Facility Name: MAGNOLIA VILLAGE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MAGNOLIA VILLAGE PWSOH7603112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 5/31/20202TOTAL COLIFORM (TCR) - 3100 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 5/31/20202TOTAL CHLORINE - 1000 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

MAGNOLIA VILLAGE PWSOH7603112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LOUISVILLE CENTER FOR REHABILITATIONOH7603312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658297EP001

Facility Name: LOUISVILLE CENTER FOR REHAB

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LOUISVILLE CENTER FOR REHABILITATIONOH7603312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE CENTER FOR REHABDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE CENTER FOR REHABDS201 7187 ST. FRANCIS STREET

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LOUISVILLE CENTER FOR REHABILITATIONOH7603312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LOUISVILLE CENTER FOR REHABLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

MEADOWS OHIO MHPOH7603412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658298EP001

Facility Name: MEADOWS OHIO MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MEADOWS OHIO MHPOH7603412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MEADOWS OHIO MHP DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MEADOWS OHIO MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

MEADOWS OHIO MHPOH7603412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MEADOWS OHIO MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

MINERVA VILLAGE PWSOH7603812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658300EP001

Facility Name: MINERVA VILLAGE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredDIOXIN - 2063

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MINERVA VILLAGE PWSOH7603812

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

MINERVA VILLAGE PWSOH7603812

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

TOP O HILL MHP PWSOH7603912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658301EP001

Facility Name: TOP-O-HILL MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

TOP O HILL MHP PWSOH7603912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TOP O HILL MHP DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TOP O HILL MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

TOP O HILL MHP PWSOH7603912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TOP O HILL MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NAVARRE VILLAGE PWSOH7604112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658302EP001

Facility Name: NAVARRE PWS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

NAVARRE VILLAGE PWSOH7604112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 8100 HUDSON DRIVE

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

NAVARRE VILLAGE PWSOH7604112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 4790 ERIE SW

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NORTH CANTON CITY PWSOH7604312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658303EP001

Facility Name: NORTH CANTON DRINKING WATER TREATMENT PL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

NORTH CANTON CITY PWSOH7604312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/202025TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and

Sample(s) Required between 1/31/202025TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 5455 MARKET AVE. NW

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

NORTH CANTON CITY PWSOH7604312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 2020 E. MAPLE ST. NW WALSH COLLEGE

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

AQUA OHIO - MASSILLON PWSOH7604512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658304EP001

Facility Name: AQUA OHIO - MASSILLON

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

AQUA OHIO - MASSILLON PWSOH7604512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202090TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202090 2/1/2020 andSample(s) Required between 3/31/202090 3/1/2020 andSample(s) Required between 4/30/202090 4/1/2020 andSample(s) Required between 5/31/202090 5/1/2020 andSample(s) Required between 6/30/202090 6/1/2020 andSample(s) Required between 7/31/202090 7/1/2020 andSample(s) Required between 8/31/202090 8/1/2020 andSample(s) Required between 9/30/202090 9/1/2020 andSample(s) Required between 10/31/202090 10/1/2020 andSample(s) Required between 11/30/202090 11/1/2020 andSample(s) Required between 12/31/202090 12/1/2020 and

Sample(s) Required between 1/31/202090TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202090 2/1/2020 andSample(s) Required between 3/31/202090 3/1/2020 andSample(s) Required between 4/30/202090 4/1/2020 andSample(s) Required between 5/31/202090 5/1/2020 andSample(s) Required between 6/30/202090 6/1/2020 andSample(s) Required between 7/31/202090 7/1/2020 andSample(s) Required between 8/31/202090 8/1/2020 andSample(s) Required between 9/30/202090 9/1/2020 andSample(s) Required between 10/31/202090 10/1/2020 andSample(s) Required between 11/30/202090 11/1/2020 andSample(s) Required between 12/31/202090 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2DS201 1687 SANDY KNOLL DR.

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

AQUA OHIO - MASSILLON PWSOH7604512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2DS202 6211 RICHVILLE DR

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

SHADY KNOLL MHPOH7605012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658307EP001

Facility Name: SHADY KNOLL MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

SHADY KNOLL MHPOH7605012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SHADY KNOLL MHP DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SHADY KNOLL MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

SHADY KNOLL MHPOH7605012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SHADY KNOLL MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

GREEN MEADOWS HEALTH AND WELLNESS CENTEROH7605212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658308EP001

Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENTER

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

GREEN MEADOWS HEALTH AND WELLNESS CENTEROH7605212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENDS201 ADDRESS NOT KNOWN

Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 andDual Sample Required between 10/14/2020at: DS20110/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

GREEN MEADOWS HEALTH AND WELLNESS CENTEROH7605212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SKYLAND HILLS MHPOH7605412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658309EP001

Facility Name: SKYLAND HILLS MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

SKYLAND HILLS MHPOH7605412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SKYLAND HILLS MHP DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SKYLAND HILLS MHP DISTRIBUTION Facility Class: CLASS 1DS201 LOT 15

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

SKYLAND HILLS MHPOH7605412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SKYLAND HILLS MHP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

THUNDERBIRD TERRACE MHPOH7605512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658310EP001

Facility Name: THUNDERBIRD TERRACE MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

THUNDERBIRD TERRACE MHPOH7605512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THUNDERBIRD TERRACE MHP DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THUNDERBIRD TERRACE MHP DISTRIBUTIONDS201 1581 PEKIN DRIVE SOUTHEAST

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

THUNDERBIRD TERRACE MHPOH7605512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THUNDERBIRD TERRACE MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

WAYNESBURG VILLAGE PWSOH7605712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658311EP001

Facility Name: WAYNESBURG VILLAGE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WAYNESBURG VILLAGE PWSOH7605712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

WAYNESBURG VILLAGE PWSOH7605712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

WILMOT VILLAGE PWSOH7606012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658313EP001

Facility Name: WILMOT WTP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WILMOT VILLAGE PWSOH7606012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WILMOT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WILMOT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

WILMOT VILLAGE PWSOH7606012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WILMOT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

LINCOLN SQUARE APARTMENTSOH7606612

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658315EP001

Facility Name: LINCOLN SQUARE APARTMENTS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LINCOLN SQUARE APARTMENTSOH7606612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LINCOLN SQUARE APARTMENTS DISTRIBUTIODS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LINCOLN SQUARE APARTMENTS DISTRIBUTIODS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LINCOLN SQUARE APARTMENTSOH7606612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LINCOLN SQUARE APARTMENTS DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CASTLEBAR APARTMENTS PWSOH7606922

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658318EP001

Facility Name: CASTLEBAR APARTMENTS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CASTLEBAR APARTMENTS PWSOH7606922

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CASTLEBAR APARTMENTS DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CASTLEBAR APARTMENTS DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

CASTLEBAR APARTMENTS PWSOH7606922

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CASTLEBAR APARTMENTS DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

DLH BOWLES, INC.OH7607112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658320EP001

Facility Name: DLH BOWLES, INC.

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

DLH BOWLES, INC.OH7607112

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DLH BOWLES, INC. DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DLH BOWLES, INC. DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DLH BOWLES, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

STARK COUNTY WATER DISTRICTOH7607303

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20208TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20208 2/1/2020 andSample(s) Required between 3/31/20208 3/1/2020 andSample(s) Required between 4/30/20208 4/1/2020 andSample(s) Required between 5/31/20208 5/1/2020 andSample(s) Required between 6/30/20208 6/1/2020 andSample(s) Required between 7/31/20208 7/1/2020 andSample(s) Required between 8/31/20208 8/1/2020 andSample(s) Required between 9/30/20208 9/1/2020 andSample(s) Required between 10/31/20208 10/1/2020 andSample(s) Required between 11/30/20208 11/1/2020 andSample(s) Required between 12/31/20208 12/1/2020 and

Sample(s) Required between 1/31/20208TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20208 2/1/2020 andSample(s) Required between 3/31/20208 3/1/2020 andSample(s) Required between 4/30/20208 4/1/2020 andSample(s) Required between 5/31/20208 5/1/2020 andSample(s) Required between 6/30/20208 6/1/2020 andSample(s) Required between 7/31/20208 7/1/2020 andSample(s) Required between 8/31/20208 8/1/2020 andSample(s) Required between 9/30/20208 9/1/2020 andSample(s) Required between 10/31/20208 10/1/2020 andSample(s) Required between 11/30/20208 11/1/2020 andSample(s) Required between 12/31/20208 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1DS201 13381 THEELAND, UNIONTOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

STARK COUNTY WATER DISTRICTOH7607303

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1DS202 3851-52 HUGH, UNIONTOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

LAKE AVENUE TERRACEOH7607412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658323EP001

Facility Name: LAKE AVENUE TERRACE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LAKE AVENUE TERRACEOH7607412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE AVENUE TERRACE DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE AVENUE TERRACE DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LAKE AVENUE TERRACEOH7607412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE AVENUE TERRACE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

OAKHILL MANOR CARE CENTEROH7608012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658326EP001

Facility Name: OAKHILL MANOR CARE CENTER

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

OAKHILL MANOR CARE CENTEROH7608012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OAKHILL MANOR CARE CENTE DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OAKHILL MANOR CARE CENTE DISTRIBUTIONDS201 4466 LYNNHAVEN AVE. NE

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

OAKHILL MANOR CARE CENTEROH7608012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OAKHILL MANOR CARE CENTE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CANTON PUBLIC WATER SYSTEMOH7608112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658279EP001

Facility Name: CANTON PWS NORTHEAST PLANT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CANTON PUBLIC WATER SYSTEMOH7608112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658280EP002

Facility Name: CANTON PWS NORTHWEST PLANT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CANTON PUBLIC WATER SYSTEMOH7608112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658281EP003

Facility Name: CANTON PWS SUGAR CREEK PLANT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP003

EP003

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CANTON PUBLIC WATER SYSTEMOH7608112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/2020100TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/2020100 2/1/2020 andSample(s) Required between 3/31/2020100 3/1/2020 andSample(s) Required between 4/30/2020100 4/1/2020 andSample(s) Required between 5/31/2020100 5/1/2020 andSample(s) Required between 6/30/2020100 6/1/2020 andSample(s) Required between 7/31/2020100 7/1/2020 andSample(s) Required between 8/31/2020100 8/1/2020 andSample(s) Required between 9/30/2020100 9/1/2020 andSample(s) Required between 10/31/2020100 10/1/2020 andSample(s) Required between 11/30/2020100 11/1/2020 andSample(s) Required between 12/31/2020100 12/1/2020 and

Sample(s) Required between 1/31/2020100TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/2020100 2/1/2020 andSample(s) Required between 3/31/2020100 3/1/2020 andSample(s) Required between 4/30/2020100 4/1/2020 andSample(s) Required between 5/31/2020100 5/1/2020 andSample(s) Required between 6/30/2020100 6/1/2020 andSample(s) Required between 7/31/2020100 7/1/2020 andSample(s) Required between 8/31/2020100 8/1/2020 andSample(s) Required between 9/30/2020100 9/1/2020 andSample(s) Required between 10/31/2020100 10/1/2020 andSample(s) Required between 11/30/2020100 11/1/2020 andSample(s) Required between 12/31/2020100 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS201 1025 LAKE CENTER, HARTVILLE

Dual Sample Required between 1/7/2020at: DS201DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2014/1/2020 andDual Sample Required between 7/7/2020at: DS2017/1/2020 and

CANTON PUBLIC WATER SYSTEMOH7608112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS201 1025 LAKE CENTER, HARTVILLE

Dual Sample Required between 10/7/2020at: DS201DISINFECTION BYPRODUCTS 10/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS202 626 30TH ST

Dual Sample Required between 1/7/2020at: DS202DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2024/1/2020 andDual Sample Required between 7/7/2020at: DS2027/1/2020 andDual Sample Required between 10/7/2020at: DS20210/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CONGRESS LAKE CLUB-MAINTENANCE

2020 MONITORING SCHEDULE

OH7620012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CONGRESS LAKE CLUB-MAINT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-MAINTENANCE

2020 MONITORING SCHEDULE

OH7620012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CONGRESS LAKE CLUB MAINT.Ground Water

7658327

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-BOATHOUSE

2020 MONITORING SCHEDULE

OH7620112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CONGRESS LAKE CLUB-BOAT. DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-BOATHOUSE

2020 MONITORING SCHEDULE

OH7620112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CONGRESS LAKE CLUB-BOAT. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-BOATHOUSE

2020 MONITORING SCHEDULE

OH7620112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CONGRESS LAKE CLUB BOATHOUSEGround Water

7658328

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-HALFWAY HOUSE

2020 MONITORING SCHEDULE

OH7620212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CONGRESS LAKE CLUB-HALFW DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-HALFWAY HOUSE

2020 MONITORING SCHEDULE

OH7620212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CONGRESS LAKE CLUB-HALFW DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-HALFWAY HOUSE

2020 MONITORING SCHEDULE

OH7620212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CONGRESS LAKE CLUB HALFWAY HSGround Water

7658329

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PATTYS PLACE FAMILY RESTAURANT

2020 MONITORING SCHEDULE

OH7620312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PATTYS PLACE FAMILY RESTAURANT DISTGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PATTYS PLACE FAMILY RESTAURANT

2020 MONITORING SCHEDULE

OH7620312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PATTYS PLACE FAMILY RESTAURANTGround Water

7658330

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

B AND H MACHINE, INC.OH7630512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658333EP001

Facility Name: B & H MACHINE INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

B AND H MACHINE, INC.OH7630512

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: B&H MACHINE, INC. DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: B&H MACHINE, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BAYLOR BEACH PARK, INC. PWS

2020 MONITORING SCHEDULE

OH7630612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: BAYLOR BEACH PARK, INC. DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BAYLOR BEACH PARK, INC. PWS

2020 MONITORING SCHEDULE

OH7630612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BAYLOR BEACH PARK, INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BAYLOR BEACH PARK, INC. PWS

2020 MONITORING SCHEDULE

OH7630612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BAYLOR BEACH PARK INCGround Water

7658334

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2020 and 6/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEAR CREEK CAMPGROUND

2020 MONITORING SCHEDULE

OH7630712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEAR CREEK CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEAR CREEK CAMPGROUND

2020 MONITORING SCHEDULE

OH7630712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP003 Facility Source:

Facility Name: BEAR CREEK CAMPGROUND PLANT 3

7662498

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEAR CREEK CAMPGROUND

2020 MONITORING SCHEDULE

OH7630712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: BEAR CREEK CAMPGROUND PLANT 2

7662497

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TOWPATH CABINN PWS

2020 MONITORING SCHEDULE

OH7631812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TOWPATH CABINN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TOWPATH CABINN PWS

2020 MONITORING SCHEDULE

OH7631812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TOWPATH CABINNGround Water

7658339

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BUDS CORNER PWS

2020 MONITORING SCHEDULE

OH7631912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BUDS CORNER DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BUDS CORNER PWS

2020 MONITORING SCHEDULE

OH7631912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BUDS CORNERGround Water

7658340

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP WANAKE - MAIN WELL

2020 MONITORING SCHEDULE

OH7632112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP WANAKE - MAIN WELL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP WANAKE - MAIN WELL

2020 MONITORING SCHEDULE

OH7632112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP WANAKEGround Water

7658341

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP WANAKE - OUTPOST BARN

2020 MONITORING SCHEDULE

OH7632122 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP WANAKE - OUTPOST BA DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP WANAKE - OUTPOST BARN

2020 MONITORING SCHEDULE

OH7632122 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP WANAKE - OUTPOST BA DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP WANAKE - OUTPOST BARN

2020 MONITORING SCHEDULE

OH7632122 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP WANAKE OUTPOST BARNGround Water

7658342

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ELMS COUNTRY CLUB

2020 MONITORING SCHEDULE

OH7634112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ELMS COUNTRY CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ELMS COUNTRY CLUB

2020 MONITORING SCHEDULE

OH7634112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ELMS COUNTRY CLUBGround Water

7658351

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SAMANTHA'S FRONTIER RESTAURANT

2020 MONITORING SCHEDULE

OH7634612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FRONTIER RESTAURANT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SAMANTHA'S FRONTIER RESTAURANT

2020 MONITORING SCHEDULE

OH7634612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FRONTIER RESTAURANTGround Water

7658352

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GREIF PACKAGING, LLCOH7635012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658353EP001

Facility Name: GREIF PACKAGING, LLC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

GREIF PACKAGING, LLCOH7635012

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREIF PACKAGING, LLCDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREIF PACKAGING, LLCLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CANDLES KITCHEN, INC. PWS

2020 MONITORING SCHEDULE

OH7636512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CANDLES KITCHEN, INCGround Water

7658357

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE FAMILY MINI MART

2020 MONITORING SCHEDULE

OH7637412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HARTVILLE FAMILY MINI MART DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE FAMILY MINI MART

2020 MONITORING SCHEDULE

OH7637412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HARTVILLE FAMILY MINI MARTGround Water

7658363

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LEXINGTON ELEMENTARY SCHOOLOH7637812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658364EP001

Facility Name: LEXINGTON ELEMENTARY SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LEXINGTON ELEMENTARY SCHOOLOH7637812

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LEXINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LEXINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MARLBORO CHRISTIAN CHURCH

2020 MONITORING SCHEDULE

OH7638312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MARLBORO CHRISTIAN CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MARLBORO CHRISTIAN CHURCH

2020 MONITORING SCHEDULE

OH7638312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: MARLBORO CHRISTIAN CHURCH STU 2Ground Water

7660599

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MARLBORO CHRISTIAN CHURCH

2020 MONITORING SCHEDULE

OH7638312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MARLBORO CHRISTIAN CHURCH STU 1Ground Water

7658366

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MARLBORO ELEMENTARY SCHOOLOH7638412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658367EP001

Facility Name: MARLBORO ELEMENTARY SCHOOL

Effective Date: 09/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

MARLBORO ELEMENTARY SCHOOLOH7638412

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

09/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MARLBORO ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 12/31/202010LEAD - 1030 AND COPPER - 1022 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MARLBORO MFG INCOH7638512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658368EP001

Facility Name: MARLBORO MFG INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MARLBORO MFG INCOH7638512

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MARLBORO MFG INC DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MARLBORO MFG INC DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NORTH NIMISHILLEN ELEMENTARYOH7639412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658373EP001

Facility Name: NORTH NIMISHILLEN ELEM SCH

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 10/1/2020 and 12/31/2020

NORTH NIMISHILLEN ELEMENTARYOH7639412

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH NIMISHILLEN ELEM DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH NIMISHILLEN ELEM DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTH NIMISHILLEN ELEM DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CANAAN ACRES CHURCH CAMP

2020 MONITORING SCHEDULE

OH7639612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CANAAN ACRES CHR CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CANAAN ACRES CHURCH CAMP

2020 MONITORING SCHEDULE

OH7639612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CANAAN ACRES CHURCH CAMPGround Water Facility Class: CLASS A

7658374

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PINE VIEW ACRES, LLC - DINING HALL

2020 MONITORING SCHEDULE

OH7640412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PINE VIEW ACRES - DINING HALLGround Water

7658379

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PINE VIEW ACRES, LLC - BOYS DORM

2020 MONITORING SCHEDULE

OH7640512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PINE VIEW ACRES - BOYS DORM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PINE VIEW ACRES, LLC - BOYS DORM

2020 MONITORING SCHEDULE

OH7640512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PINE VIEW ACRES - BOYS DORMGround Water

7658380

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PINE VIEW ACRES, LLC - GIRLS DORM

2020 MONITORING SCHEDULE

OH7640612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PINE VIEW ACRES - GIRLS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PINE VIEW ACRES, LLC - GIRLS DORM

2020 MONITORING SCHEDULE

OH7640612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PINE VIEW ACRES - GIRLS DORMGround Water

7658381

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEACH CITY BIBLE METHODIST CHURCH

2020 MONITORING SCHEDULE

OH7640812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEACH CITY BIBLE METHODIST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEACH CITY BIBLE METHODIST CHURCH

2020 MONITORING SCHEDULE

OH7640812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEACH CITY BIBLE METHODISTGround Water

7658382

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SACRED HEART OF MARY PARISH

2020 MONITORING SCHEDULE

OH7642012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SACRED HEART OF MARY SCL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SACRED HEART OF MARY PARISH

2020 MONITORING SCHEDULE

OH7642012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: SACRED HEART OF MARY PARISHGround Water

7662385

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SCHONER CHEVROLET SALESOH7642212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658388EP001

Facility Name: SCHONER CHEVROLET INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

SCHONER CHEVROLET SALESOH7642212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCHONER CHEVROLET SALES DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCHONER CHEVROLET SALES DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SKYLAND PINES RUSTIC LODGE PWS

2020 MONITORING SCHEDULE

OH7642512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SKYLAND PINE RUSTIC LODGE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SKYLAND PINES RUSTIC LODGE PWS

2020 MONITORING SCHEDULE

OH7642512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SKYLAND PINES RUSTIC LODGEGround Water

7658390

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILDERNESS CENTER INC

2020 MONITORING SCHEDULE

OH7643012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WILDERNESS CENTER INC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILDERNESS CENTER INC

2020 MONITORING SCHEDULE

OH7643012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WILDERNESS CENTER INCGround Water Facility Class: CLASS A

7658393

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHILDRENS TOY FUND

2020 MONITORING SCHEDULE

OH7643212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHILDRENS TOY FUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHILDRENS TOY FUND

2020 MONITORING SCHEDULE

OH7643212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHILDRENS TOY FUNDGround Water

7658394

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THOMPSONS DAIRY LAND

2020 MONITORING SCHEDULE

OH7643412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: THOMPSONS DAIRY LAND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THOMPSONS DAIRY LAND

2020 MONITORING SCHEDULE

OH7643412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: THOMPSONS DAIRY LANDGround Water

7658396

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

VFW POST 7490

2020 MONITORING SCHEDULE

OH7643912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: VFW POST 7490 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

VFW POST 7490

2020 MONITORING SCHEDULE

OH7643912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: VFW POST 7490Ground Water

7658400

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WALKER ELEMENTARY SCHOOLOH7644112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658401EP001

Facility Name: WALKER ELEM SCH

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WALKER ELEMENTARY SCHOOLOH7644112

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

WASHINGTON ELEMENTARY SCHOOLOH7644312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658402EP001

Facility Name: WASHINGTON ELEMENTARY SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WASHINGTON ELEMENTARY SCHOOLOH7644312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WASHINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WASHINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

PAWPAWS COUNTRY MART

2020 MONITORING SCHEDULE

OH7645912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PAW PAWS CTRY MART-DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PAWPAWS COUNTRY MART

2020 MONITORING SCHEDULE

OH7645912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PAW PAWS COUNTRY MARTGround Water Facility Class: CLASS A

7658408

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE LIGHTHOUSE PWS

2020 MONITORING SCHEDULE

OH7646112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: THE LIGHTHOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE LIGHTHOUSE PWS

2020 MONITORING SCHEDULE

OH7646112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: THE LIGHTHOUSEGround Water

7658409

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROADSIDE TAVERN, INC. PWS

2020 MONITORING SCHEDULE

OH7646412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ROADSIDE TAVERN, INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROADSIDE TAVERN, INC. PWS

2020 MONITORING SCHEDULE

OH7646412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ROADSIDE TAVERN INCGround Water

7658410

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RANSOM H BARR ELEMENTARYOH7647212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658415EP001

Facility Name: RANSOM H BARR ELEMENTARY

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

RANSOM H BARR ELEMENTARYOH7647212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RANSOM H BARR ELEMENTARY DISTRIBUTIO Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RANSOM H BARR ELEMENTARY DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SPUDS CORNER PWS

2020 MONITORING SCHEDULE

OH7648312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPUDS CORNER DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPUDS CORNER PWS

2020 MONITORING SCHEDULE

OH7648312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SPUDS CORNERGround Water

7658421

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NORTH LAWRENCE FIRE DEPT

2020 MONITORING SCHEDULE

OH7649512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NORTH LAWRENCE FIRE DEPT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NORTH LAWRENCE FIRE DEPT

2020 MONITORING SCHEDULE

OH7649512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NORTH LAWRENCE VOLUNTEER FIRE DEPTGround Water

7658424

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AKRON CANTON JELLYSTONE PARK

2020 MONITORING SCHEDULE

OH7650132 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: AKRON CANTON JELLYSTONE PARKGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AKRON CANTON JELLYSTONE PARK

2020 MONITORING SCHEDULE

OH7650132 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

02/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: AKRON CANTON JELLYSTONE PARKGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AKRON CANTON JELLYSTONE PARK

2020 MONITORING SCHEDULE

OH7650132 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: AKRON CANTON JELLYSTONE PARKGround Water Facility Class: CLASS A

7658429

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-CLUBHOUSE

2020 MONITORING SCHEDULE

OH7650212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CONGRESS LAKE CLUBHOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CONGRESS LAKE CLUB-CLUBHOUSE

2020 MONITORING SCHEDULE

OH7650212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CONGRESS LAKE CLUBHOUSEGround Water

7658430

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUTTYS SUNSET CAMP PWS

2020 MONITORING SCHEDULE

OH7650322 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CUTTYS SUNSET CAMP DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUTTYS SUNSET CAMP PWS

2020 MONITORING SCHEDULE

OH7650322 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CUTTYS SUNSET CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUTTYS SUNSET CAMP PWS

2020 MONITORING SCHEDULE

OH7650322 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP004 Facility Source:

Facility Name: CUTTYS SUNSET CAMP STU 4Ground Water

7662178

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUTTYS SUNSET CAMP PWS

2020 MONITORING SCHEDULE

OH7650322 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: CUTTYS SUNSET CAMP STU 2Ground Water

7660601

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUTTYS SUNSET CAMP PWS

2020 MONITORING SCHEDULE

OH7650322 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP003 Facility Source:

Facility Name: CUTTYS SUNSET CAMP STU 3Ground Water

7658576

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUTTYS SUNSET CAMP PWS

2020 MONITORING SCHEDULE

OH7650322 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CUTTYS SUNSET CAMP STU 1Ground Water

7658431

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPRINGWOOD LAKE CAMP CLUBOH7651212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to4/1 11/30

SamplingLocation

Facility ID: SMP ID:

7658432EP001

Facility Name: SPRINGWOOD LAKE CAMP CLUB

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 4/1/2020 and 6/30/2020

SPRINGWOOD LAKE CAMP CLUBOH7651212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to4/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIODS000

Sample(s) Required between 4/30/20201TOTAL COLIFORM (TCR) - 3100 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIODS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SPRINGWOOD LAKE CAMP CLUBOH7651212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to4/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIOSUP01

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative beforethe system may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements.If your start date is different from last year, please contact your Ohio EPA District Representative.***

UNITED FELLOWSHIP CLUB

2020 MONITORING SCHEDULE

OH7651412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: UNITED FELLOWSHIP CLUB DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

UNITED FELLOWSHIP CLUB

2020 MONITORING SCHEDULE

OH7651412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: UNITED FELLOWSHIP CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

UNITED FELLOWSHIP CLUB

2020 MONITORING SCHEDULE

OH7651412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: UNITED FELLOWSHIP CLUBGround Water

7658433

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILLOWDALE LAKE COUNTRY CLUB

2020 MONITORING SCHEDULE

OH7651512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WILLOWDALE LAKE CC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILLOWDALE LAKE COUNTRY CLUB

2020 MONITORING SCHEDULE

OH7651512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WILLOWDALE LAKE COUNTRY CLUBGround Water

7658434

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 3 PWS

2020 MONITORING SCHEDULE

OH7651812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 3 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 3 PWS

2020 MONITORING SCHEDULE

OH7651812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 3 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 3 PWS

2020 MONITORING SCHEDULE

OH7651812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 3Ground Water

7658435

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 1 PWS

2020 MONITORING SCHEDULE

OH7652912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 1 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 1 PWS

2020 MONITORING SCHEDULE

OH7652912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 1 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 1 PWS

2020 MONITORING SCHEDULE

OH7652912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 1Ground Water

7658438

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 2 PWS

2020 MONITORING SCHEDULE

OH7653012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 2 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 2 PWS

2020 MONITORING SCHEDULE

OH7653012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 2 PWS

2020 MONITORING SCHEDULE

OH7653012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 2Ground Water

7658439

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MOMENTS WORSHIP HALL

2020 MONITORING SCHEDULE

OH7653712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MOMENTS WORSHIP HALL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MOMENTS WORSHIP HALL

2020 MONITORING SCHEDULE

OH7653712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MOMENTS WORSHIP HALLGround Water

7658442

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE CHRISTIAN SCHOOL PWSOH7653812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658443EP001

Facility Name: HARTVILLE CHRISTIAN SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 10/1/2020 and 12/31/2020

HARTVILLE CHRISTIAN SCHOOL PWSOH7653812

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARTVILLE CHRISTIAN SCHO DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARTVILLE CHRISTIAN SCHO DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LAKE CENTER CHRISTIAN SCHOOLOH7653912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658444EP001

Facility Name: LAKE CENTER CHRISTIAN SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LAKE CENTER CHRISTIAN SCHOOLOH7653912

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE CENTER CHRISTIAN SC DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE CENTER CHRISTIAN SC DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

ZELLERS AMLC 4 PWS

2020 MONITORING SCHEDULE

OH7654712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 4 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 4 PWS

2020 MONITORING SCHEDULE

OH7654712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 4 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 4 PWS

2020 MONITORING SCHEDULE

OH7654712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS ALMC 4 PWSGround Water

7658449

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK CAMPING RESORT PWS

2020 MONITORING SCHEDULE

OH7654812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CLAYS PARK CAMPING RSRT DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK CAMPING RESORT PWS

2020 MONITORING SCHEDULE

OH7654812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CLAYS PARK CAMPING RSRT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK CAMPING RESORT PWS

2020 MONITORING SCHEDULE

OH7654812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: CLAYS PARK CAMPING RESORT STU 2Ground Water Facility Class: CLASS A

7658451

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK CAMPING RESORT PWS

2020 MONITORING SCHEDULE

OH7654812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CLAYS PARK CAMPING RESORT STU 1Ground Water Facility Class: CLASS A

7658450

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LMT HARTVILLEOH7655312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658454EP001

Facility Name: LMT HARTVILLE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

LMT HARTVILLEOH7655312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LMT HARTVILLE DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LMT HARTVILLE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CANTON DROP FORGEOH7655412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658455EP001

Facility Name: CANTON DROP FORGING AND MFG CO STU 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

CANTON DROP FORGEOH7655412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7660602EP002

Facility Name: CANTON DROP FORGE STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

CANTON DROP FORGEOH7655412

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON DROP FORGE DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON DROP FORGE DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CANTON DROP FORGE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

KAUFMAN CENTER

2020 MONITORING SCHEDULE

OH7655712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KAUFMAN CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KAUFMAN CENTER

2020 MONITORING SCHEDULE

OH7655712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KAUFMAN CENTERGround Water

7658457

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MT PLEASANT BAPTIST CHURCH

2020 MONITORING SCHEDULE

OH7655812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MT PLEASANT BAPTIST CH. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MT PLEASANT BAPTIST CHURCH

2020 MONITORING SCHEDULE

OH7655812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MT PLEASANT BAPTIST CHURCHGround Water

7658458

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPRING VALLEY GOLF COURSE

2020 MONITORING SCHEDULE

OH7656512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: SPRING VALLEY GOLF COURSE DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPRING VALLEY GOLF COURSE

2020 MONITORING SCHEDULE

OH7656512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPRING VALLEY GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPRING VALLEY GOLF COURSE

2020 MONITORING SCHEDULE

OH7656512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SPRING VALLEY GOLF COURSEGround Water

7658462

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE COMMUNITY CHURCH

2020 MONITORING SCHEDULE

OH7657612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NEW BALTIMORE CHURCH & S DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE COMMUNITY CHURCH

2020 MONITORING SCHEDULE

OH7657612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NEW BALTIMORE CHURCH & SCHOOLGround Water

7658471

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ADVENTURE PLACEOH7658112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658474EP001

Facility Name: ADVENTURE PLACE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

ADVENTURE PLACEOH7658112

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ADVENTURE PLACE DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ADVENTURE PLACE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MT UNION COLLEGE NATURE CENTER

2020 MONITORING SCHEDULE

OH7658312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MT UNION COLLEGE NATURE CENTER DISTGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MT UNION COLLEGE NATURE CENTER

2020 MONITORING SCHEDULE

OH7658312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MT UNION COLLEGE NATURE CENTERGround Water

7658476

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRENCKLE FARMS

2020 MONITORING SCHEDULE

OH7658512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: BRENCKLE FARMS DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRENCKLE FARMS

2020 MONITORING SCHEDULE

OH7658512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BRENCKLE FARMS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRENCKLE FARMS

2020 MONITORING SCHEDULE

OH7658512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BRENKLE FARMS MIGRANT CAMPGround Water

7658478

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 5 PWS

2020 MONITORING SCHEDULE

OH7658612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 5 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 5 PWS

2020 MONITORING SCHEDULE

OH7658612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 5 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 5 PWS

2020 MONITORING SCHEDULE

OH7658612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 5Ground Water

7658479

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 6 PWS

2020 MONITORING SCHEDULE

OH7658712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 6 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 6 PWS

2020 MONITORING SCHEDULE

OH7658712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 6 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 6 PWS

2020 MONITORING SCHEDULE

OH7658712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 6Ground Water

7658480

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 7 PWS

2020 MONITORING SCHEDULE

OH7658812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 7 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 7 PWS

2020 MONITORING SCHEDULE

OH7658812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 7 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 7 PWS

2020 MONITORING SCHEDULE

OH7658812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 7Ground Water

7658481

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ODNR-QUAIL HOLLOW MANOR HOUSE

2020 MONITORING SCHEDULE

OH7659112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: QUAIL HOLLOW MANOR HOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ODNR-QUAIL HOLLOW MANOR HOUSE

2020 MONITORING SCHEDULE

OH7659112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: QUAIL HOLLOW MANOR HOUSEGround Water Facility Class: CLASS A

7658483

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

EAST SPARTA RECREATION

2020 MONITORING SCHEDULE

OH7659212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: EAST SPARTA RECREATION DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

EAST SPARTA RECREATION

2020 MONITORING SCHEDULE

OH7659212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: EAST SPARTA RECREATIONGround Water

7658484

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BIERY CHEESE COMPANYOH7659812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658489EP001

Facility Name: BIERY CHEESE CO

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BIERY CHEESE COMPANYOH7659812

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BIERY CHEESE COMPANY DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BIERY CHEESE COMPANY DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BIERY CHEESE COMPANY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BUCKEYE PACKAGING, INC.OH7660412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658493EP001

Facility Name: BUCKEYE PACKAGING CO INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BUCKEYE PACKAGING, INC.OH7660412

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BUCKEYE PACKAGING, INC. DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BUCKEYE PACKAGING, INC. DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CLAYS PARK - WATER PARK PWS

2020 MONITORING SCHEDULE

OH7661312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CLAYS PARK - WATER PARK DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK - WATER PARK PWS

2020 MONITORING SCHEDULE

OH7661312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CLAYS PARK - WATER PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK - WATER PARK PWS

2020 MONITORING SCHEDULE

OH7661312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CLAYS PARK - WATER PARK STU 1Ground Water Facility Class: CLASS A

7658499

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK - WELCOME CENTER PWS

2020 MONITORING SCHEDULE

OH7661512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CLAYS PARK - WELCOME CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLAYS PARK - WELCOME CENTER PWS

2020 MONITORING SCHEDULE

OH7661512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CLAYS PARK - WELCOME CENTERGround Water

7658502

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SONS OF HERMAN

2020 MONITORING SCHEDULE

OH7661712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SONS OF HERMAN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SONS OF HERMAN

2020 MONITORING SCHEDULE

OH7661712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SONS OF HERMANGround Water

7658504

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEECH MENNONITE CHURCH

2020 MONITORING SCHEDULE

OH7661912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEECH MENNONITE CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEECH MENNONITE CHURCH

2020 MONITORING SCHEDULE

OH7661912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEECH MENNONITE CHURCHGround Water

7658506

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

VFW POST 5047

2020 MONITORING SCHEDULE

OH7662112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: VFW POST 5047Ground Water

7658508

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GRACE BRETHREN CHURCH-MIDDLEBRANCH

2020 MONITORING SCHEDULE

OH7662412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE BRETHREN CH-MIDDLE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GRACE BRETHREN CHURCH-MIDDLEBRANCH

2020 MONITORING SCHEDULE

OH7662412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE BRETHREN CH MIDDLEBRANCHGround Water

7658511

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DIAMOND COMMUNITY PARK PWS

2020 MONITORING SCHEDULE

OH7663012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: DIAMOND COMMUNITY PARK DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DIAMOND COMMUNITY PARK PWS

2020 MONITORING SCHEDULE

OH7663012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

06/19/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DIAMOND COMMUNITY PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DIAMOND COMMUNITY PARK PWS

2020 MONITORING SCHEDULE

OH7663012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DIAMOND COMMUNITY PARKGround Water

7658516

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SABLE CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7663112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SABLE CREEK GOLF DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SABLE CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7663112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SABLE CREEK GOLF COURSEGround Water

7658517

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WATERS EDGE VINEYARD

2020 MONITORING SCHEDULE

OH7663512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WATER'S EDGE VINEYARDGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WATERS EDGE VINEYARD

2020 MONITORING SCHEDULE

OH7663512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WATER'S EDGE VINEYARDGround Water

7658521

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BOCCA GRANDE

2020 MONITORING SCHEDULE

OH7663612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BOCCA GRANDE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BOCCA GRANDE

2020 MONITORING SCHEDULE

OH7663612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BOCA GRANDEGround Water

7658522

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CARLOS TRATTORIA PWS

2020 MONITORING SCHEDULE

OH7663812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CARLOS TRATTORIA DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CARLOS TRATTORIA PWS

2020 MONITORING SCHEDULE

OH7663812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CARLOS TRATTORIOGround Water

7658524

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CLEARVIEW GOLF COURSE

2020 MONITORING SCHEDULE

OH7663912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CLEARVIEW GOLF COURSEGround Water

7658525

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

COUNTRY CONES

2020 MONITORING SCHEDULE

OH7664112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: COUNTRY CONES DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

COUNTRY CONES

2020 MONITORING SCHEDULE

OH7664112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COUNTRY CONES DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

COUNTRY CONES

2020 MONITORING SCHEDULE

OH7664112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COUNTRY CONESGround Water

7658526

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DISABLED AM VET 50 PWS

2020 MONITORING SCHEDULE

OH7664612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISABLED AM VET 50 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DISABLED AM VET 50 PWS

2020 MONITORING SCHEDULE

OH7664612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DISABLED AM VET NO 50Ground Water

7658529

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

EDGEWATER GOLF COURSE

2020 MONITORING SCHEDULE

OH7664712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: EDGEWATER GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

EDGEWATER GOLF COURSE

2020 MONITORING SCHEDULE

OH7664712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: EDGEWATER GOLF COURSEGround Water

7658530

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WHINERY ELM INN PWS

2020 MONITORING SCHEDULE

OH7664912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WHINERY ELM INN LTD DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WHINERY ELM INN PWS

2020 MONITORING SCHEDULE

OH7664912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WHINERY ELM INNGround Water

7658532

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BURGER KING 373-HARTVILLE

2020 MONITORING SCHEDULE

OH7665312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BURGER KING-HARTVILLE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BURGER KING 373-HARTVILLE

2020 MONITORING SCHEDULE

OH7665312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BURGER KING HARTVILLEGround Water Facility Class: CLASS A

7658535

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HITCHIN POST

2020 MONITORING SCHEDULE

OH7665412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HITCHIN POST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HITCHIN POST

2020 MONITORING SCHEDULE

OH7665412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HITCHIN POSTGround Water

7658536

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HOT LAPS SPORTS BAR, INC.

2020 MONITORING SCHEDULE

OH7666012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HOT LAPS SPORTS BAR, INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HOT LAPS SPORTS BAR, INC.

2020 MONITORING SCHEDULE

OH7666012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HOT LAPS SPORTS BAR INCGround Water

7658540

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LYONS DEN GOLF PWS

2020 MONITORING SCHEDULE

OH7666112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: LYONS DEN GOLF DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LYONS DEN GOLF PWS

2020 MONITORING SCHEDULE

OH7666112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 11/30

04/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LYONS DEN GOLF DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 11/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LYONS DEN GOLF PWS

2020 MONITORING SCHEDULE

OH7666112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LYONS DEN GOLF COURSEGround Water

7658541

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

OLD LANDMARK TAVERN

2020 MONITORING SCHEDULE

OH7666312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OLD LANDMARK TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

OLD LANDMARK TAVERN

2020 MONITORING SCHEDULE

OH7666312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OLD LANDMARK TAVERNGround Water

7658543

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PLEASANT VIEW GOLF COURSE

2020 MONITORING SCHEDULE

OH7666412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PLEASANT VIEW GOLF COURS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PLEASANT VIEW GOLF COURSE

2020 MONITORING SCHEDULE

OH7666412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PLEASANT VIEW GOLF COURSEGround Water

7658544

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RED DOG SALOON

2020 MONITORING SCHEDULE

OH7666512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RED DOG SALOON DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RED DOG SALOON

2020 MONITORING SCHEDULE

OH7666512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RED DOG SALOONGround Water

7658545

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SEVEN HILLS GOLF

2020 MONITORING SCHEDULE

OH7666912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: SEVEN HILLS GOLF DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SEVEN HILLS GOLF

2020 MONITORING SCHEDULE

OH7666912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SEVEN HILLS GOLF DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SEVEN HILLS GOLF

2020 MONITORING SCHEDULE

OH7666912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SEVEN HILLS GOLFGround Water

7658549

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GRACE PETROLEUM - FOHL ROAD SUNOCO PWS

2020 MONITORING SCHEDULE

OH7667012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE PETROLEUM - FOHL ROAD SUNOCO DIST.Ground Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GRACE PETROLEUM - FOHL ROAD SUNOCO PWS

2020 MONITORING SCHEDULE

OH7667012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE PETROLEUM - FOHL ROAD SUNOCOGround Water Facility Class: CLASS A

7658550

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

YOHE PLAZA

2020 MONITORING SCHEDULE

OH7667612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: YOHE PLAZA DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

YOHE PLAZA

2020 MONITORING SCHEDULE

OH7667612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: YOHE PLAZAGround Water Facility Class: CLASS A

7658556

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TANNENHAUF GOLF CLUB-CLUBHOUSE

2020 MONITORING SCHEDULE

OH7667812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TANNENHAUF GOLF CLUB CLU DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TANNENHAUF GOLF CLUB-CLUBHOUSE

2020 MONITORING SCHEDULE

OH7667812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TANNENHAUF GOLF CLUB CLUBHOUSEGround Water

7658557

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WACO MARATHON

2020 MONITORING SCHEDULE

OH7668012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WACO MARATHON DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WACO MARATHON

2020 MONITORING SCHEDULE

OH7668012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WACO MARATHONGround Water Facility Class: CLASS A

7658559

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ANHEUSER-BUSCH SALES OF CANTONOH7668312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658562EP001

Facility Name: ANHEUSER-BUSCH SALES OF CANTON

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

ANHEUSER-BUSCH SALES OF CANTONOH7668312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANHEUSER-BUSCH SALES OF DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANHEUSER-BUSCH SALES OF DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

IRONROCK CAPITAL-PLANTOH7669112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658569EP001

Facility Name: IRONROCK CAPITAL INC - PLANT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 10/1/2020 and 12/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

IRONROCK CAPITAL-PLANTOH7669112

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: IRONROCK CAPITAL-PLANT DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: IRONROCK CAPITAL-PLANT DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: IRONROCK CAPITAL-PLANT DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

EDISON PARK PLAZAOH7669212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658570EP001

Facility Name: EDISON PARK PLAZA STU 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

EDISON PARK PLAZAOH7669212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7660926EP002

Facility Name: EDISON PARK PLAZA STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

EDISON PARK PLAZAOH7669212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EDISON PARK PLAZA DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: EDISON PARK PLAZA DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NORTH PLAZA-HARTVILLE

2020 MONITORING SCHEDULE

OH7669312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NORTH PLAZA-HARTVILLE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NORTH PLAZA-HARTVILLE

2020 MONITORING SCHEDULE

OH7669312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NORTH PLAZA HARTVILLEGround Water

7658571

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GENTLEBROOK CHURCH & DAYCAREOH7669612

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658573EP001

Facility Name: GENTLEBROOK CHURCH & DAYCARE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

GENTLEBROOK CHURCH & DAYCAREOH7669612

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENTLEBROOK CHURCH & DAYCARE DIST Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENTLEBROOK CHURCH & DAYCARE DIST Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LAKE O PINES PWS

2020 MONITORING SCHEDULE

OH7670312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: LAKE OPINES DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LAKE O PINES PWS

2020 MONITORING SCHEDULE

OH7670312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LAKE OPINES DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LAKE O PINES PWS

2020 MONITORING SCHEDULE

OH7670312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LAKE OPINESGround Water

7658579

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 8 PWS

2020 MONITORING SCHEDULE

OH7670412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ZELLERS AMLC 8 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 8 PWS

2020 MONITORING SCHEDULE

OH7670412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ZELLERS AMLC 8 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ZELLERS AMLC 8 PWS

2020 MONITORING SCHEDULE

OH7670412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ZELLERS AMLC NO 8Ground Water

7658580

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KINGDOM HALL JEHOVAH WITNESS-MINERVA PWS

2020 MONITORING SCHEDULE

OH7670512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KINGDOM HALL JEHOVAH WITNESS-MINERVA DISGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KINGDOM HALL JEHOVAH WITNESS-MINERVA PWS

2020 MONITORING SCHEDULE

OH7670512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KINGDOM HALL JEHOVAH WITNESS - MINERVAGround Water

7660842

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RESCO PRODUCTS, INC.OH7671012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658584EP001

Facility Name: RESCO PRODUCTS INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

RESCO PRODUCTS, INC.OH7671012

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RESCO PRODUCTS, INC. DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RESCO PRODUCTS, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

THE CHAPEL & DAYCARE IN MARLBOROOH7671212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7658586EP001

Facility Name: THE CHAPEL IN MARLBORO

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

THE CHAPEL & DAYCARE IN MARLBOROOH7671212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7661917EP002

Facility Name: THE CHAPEL IN MARLBORO STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020

THE CHAPEL & DAYCARE IN MARLBOROOH7671212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THE CHAPEL IN MARLBORO DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THE CHAPEL IN MARLBORO DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BARKER SPRING CANTON PARK COMMISSION

2020 MONITORING SCHEDULE

OH7671312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BARKER SPRING CANTON PKS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BARKER SPRING CANTON PARK COMMISSION

2020 MONITORING SCHEDULE

OH7671312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BARKER SPRING CANTON PKSGround Water

7658587

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE ICE CREAM

2020 MONITORING SCHEDULE

OH7672112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: NEW BALTIMORE ICE CREAM DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE ICE CREAM

2020 MONITORING SCHEDULE

OH7672112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NEW BALTIMORE ICE CREAM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE ICE CREAM

2020 MONITORING SCHEDULE

OH7672112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NEW BALTIMORE ICE CREAMGround Water

7658594

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WALBORN RESERVOIR MARINA

2020 MONITORING SCHEDULE

OH7672612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WALBORN RESERVOIR MARINA DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WALBORN RESERVOIR MARINA

2020 MONITORING SCHEDULE

OH7672612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WALBORN RESERVOIR MARINAGround Water

7660719

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AL LENO PARK

2020 MONITORING SCHEDULE

OH7672712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: AL LENO PARK DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AL LENO PARK

2020 MONITORING SCHEDULE

OH7672712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

04/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: AL LENO PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AL LENO PARK

2020 MONITORING SCHEDULE

OH7672712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: AL LENO PARKGround Water

7660747

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW HOPE CHAPEL PWS

2020 MONITORING SCHEDULE

OH7673012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NEW HOPE CHAPEL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW HOPE CHAPEL PWS

2020 MONITORING SCHEDULE

OH7673012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NEW HOPE CHAPELGround Water

7661031

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAIZE VALLEY FARM MARKET PWS

2020 MONITORING SCHEDULE

OH7673112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MAIZE VALLEY FARM MARKET DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAIZE VALLEY FARM MARKET PWS

2020 MONITORING SCHEDULE

OH7673112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MAIZE VALLEY FARM MKT.Ground Water

7661124

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE MARKETPLACE PWSOH7673312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7661221EP001

Facility Name: HARTVILLE MARKETPLACE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

HARTVILLE MARKETPLACE PWSOH7673312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARTVILLE MARKETPLACE DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARTVILLE MARKETPLACE DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

HARTVILLE MARKETPLACE PWSOH7673312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARTVILLE MARKETPLACE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

FELLOWSHIP BAPTIST CHURCH-CANTON PWS

2020 MONITORING SCHEDULE

OH7673412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FELLOWSHIP BAPTIST CHURCH-CANTON DISTRIBGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

FELLOWSHIP BAPTIST CHURCH-CANTON PWS

2020 MONITORING SCHEDULE

OH7673412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FELLOWSHIP BAPTIST CHURCH-CANTONGround Water Facility Class: CLASS A

7661271

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PERENNIAL WINERY PWS

2020 MONITORING SCHEDULE

OH7673712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PERENNIAL WINERY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PERENNIAL WINERY PWS

2020 MONITORING SCHEDULE

OH7673712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PERENNIAL WINERYGround Water

7661420

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LAKE SCHOOLS BUS GARAGE PWS

2020 MONITORING SCHEDULE

OH7673812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LAKE SCHOOLS BUS GARAGE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LAKE SCHOOLS BUS GARAGE PWS

2020 MONITORING SCHEDULE

OH7673812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LAKE SCHOOLS BUS GARAGEGround Water

7661547

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SREE GANGA LLC - VALERO CANTON

2020 MONITORING SCHEDULE

OH7673912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JSK PETROLEUM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SREE GANGA LLC - VALERO CANTON

2020 MONITORING SCHEDULE

OH7673912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JSK PETROLEUMGround Water

7661651

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PUMP IT UP PWS

2020 MONITORING SCHEDULE

OH7674112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PUMP IT UP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PUMP IT UP PWS

2020 MONITORING SCHEDULE

OH7674112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PUMP IT UPGround Water

7661695

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CALVARY BAPTIST CHURCH PWS

2020 MONITORING SCHEDULE

OH7674212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CALVARY BAPTIST CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CALVARY BAPTIST CHURCH PWS

2020 MONITORING SCHEDULE

OH7674212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CALVARY BAPTIST CHURCHGround Water

7661716

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CUSTOM POLY BAG INC PWSOH7674312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7661732EP001

Facility Name: CUSTOM POLY BAG INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CUSTOM POLY BAG INC PWSOH7674312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CUSTOM POLY BAG INC. DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CUSTOM POLY BAG INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

DEVILLE APARTMENTSOH7674412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7661744EP001

Facility Name: DEVILLE APARTMENTS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

DEVILLE APARTMENTSOH7674412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DEVILLE APARTMENTS DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DEVILLE APARTMENTS DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

DEVILLE APARTMENTSOH7674412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DEVILLE APARTMENTS DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CORNERSTONE CHRISTIAN CHURCH PWS

2020 MONITORING SCHEDULE

OH7674512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CORNERSTONE CHRISTIAN CHURCH DISTRIBUTIOGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CORNERSTONE CHRISTIAN CHURCH PWS

2020 MONITORING SCHEDULE

OH7674512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CORNERSTONE CHRISTIAN CHURCHGround Water

7661759

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHRISTIAN LIFE MENNONITE PWS

2020 MONITORING SCHEDULE

OH7674612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHRISTIAN LIFE MENNONITE DISTRIBUTION DSGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHRISTIAN LIFE MENNONITE PWS

2020 MONITORING SCHEDULE

OH7674612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHRISTIAN LIFE MENNONITEGround Water

7661821

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WARSTLER BROTHERS LANDSCAPING INC PWS

2020 MONITORING SCHEDULE

OH7674712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WARSTLER BROS. LANDSCAPING, INC. DISTRIBGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WARSTLER BROTHERS LANDSCAPING INC PWS

2020 MONITORING SCHEDULE

OH7674712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WARSTLER BROS LANDSCAPINGGround Water

7661827

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAPLE GROVE MENNONITE CHURCH PWS

2020 MONITORING SCHEDULE

OH7674812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MAPLE GROVE MENNONITE CHURCH DISTRIBUTIOGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAPLE GROVE MENNONITE CHURCH PWS

2020 MONITORING SCHEDULE

OH7674812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MAPLE GROVE MENNONITE CHURCHGround Water

7661848

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BETHANY MENNONITE CHURCH-HARTVILLE

2020 MONITORING SCHEDULE

OH7674912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BETHANY MENNONITE CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BETHANY MENNONITE CHURCH-HARTVILLE

2020 MONITORING SCHEDULE

OH7674912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BETHANY MENNONITE CHURCHGround Water

7661860

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MILLER WELD MASTER PWSOH7675112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7661867EP001

Facility Name: MILLER WELD MASTER

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2020 and 6/30/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MILLER WELD MASTER PWSOH7675112

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MILLER WELD MASTER DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MILLER WELD MASTER DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

WOODBURY GLEN CONDOMINIUMS PWSOH7675212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7661892EP001

Facility Name: WOODBURY GLEN CONDOMINIUMS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WOODBURY GLEN CONDOMINIUMS PWSOH7675212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WOODBURY GLEN CONDOMINIUMS DISTRIBUDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WOODBURY GLEN CONDOMINIUMS DISTRIBUDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

WOODBURY GLEN CONDOMINIUMS PWSOH7675212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WOODBURY GLEN CONDOMINIUMS DISTRIBULC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

ST JOSEPH CHURCH PWS

2020 MONITORING SCHEDULE

OH7675412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ST JOSEPH CHURCHGround Water

7661975

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ALLIANCE CHURCH OF CHRIST PWS

2020 MONITORING SCHEDULE

OH7675712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ALLIANCE CHURCH OF CHRIST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ALLIANCE CHURCH OF CHRIST PWS

2020 MONITORING SCHEDULE

OH7675712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ALLIANCE CHURCH OF CHRISTGround Water

7662022

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVERSIDE BAR AND GRILL

2020 MONITORING SCHEDULE

OH7675812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVERSIDE BAR AND GRILL

2020 MONITORING SCHEDULE

OH7675812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIVERSIDE BAR AND GRILLGround Water

7662045

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KIDS COUNTRY PWSOH7675912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662076EP001

Facility Name: KIDS COUNTRY

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

KIDS COUNTRY PWSOH7675912

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: KIDS COUNTRY DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: KIDS COUNTRY DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

THE CHRISTADELPHIANS PWS

2020 MONITORING SCHEDULE

OH7676012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: THE CHRISTADELPHIANS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE CHRISTADELPHIANS PWS

2020 MONITORING SCHEDULE

OH7676012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: THE CHRISTADELPHIANSGround Water

7662161

Sample(s) Required betweenBARIUM - 1010 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

INDIAN RUN CHRISTIAN CHURCH

2020 MONITORING SCHEDULE

OH7676112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: INDIAN RUN CHRISTIAN CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

INDIAN RUN CHRISTIAN CHURCH

2020 MONITORING SCHEDULE

OH7676112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: INDIAN RUN CHRISTIAN CHURCHGround Water

7662165

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE CHURCH OF CHRIST

2020 MONITORING SCHEDULE

OH7676212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HARTVILLE CHURCH OF CHRIST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE CHURCH OF CHRIST

2020 MONITORING SCHEDULE

OH7676212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HARTVILLE CHURCH OF CHRISTGround Water

7662179

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPEE-D-FOODS #29 PWS

2020 MONITORING SCHEDULE

OH7676412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPEE-D-FOODS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SPEE-D-FOODS #29 PWS

2020 MONITORING SCHEDULE

OH7676412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SPEE-D-FOODS LOUISVILLEGround Water Facility Class: CLASS A

7662215

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LOUISVILLE BAPTIST TEMPLE PWS

2020 MONITORING SCHEDULE

OH7676512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

04/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LOUISVILLE BAPTIST TEMPLE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LOUISVILLE BAPTIST TEMPLE PWS

2020 MONITORING SCHEDULE

OH7676512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LOUISVILLE BAPTIST TEMPLEGround Water

7662247

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SCENIC CREEK APARTMENTS PWSOH7676612

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662256EP001

Facility Name: SCENIC CREEK APARTMENTS PWS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

SCENIC CREEK APARTMENTS PWSOH7676612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCENIC CREEK APARTMENTS DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCENIC CREEK APARTMENTS DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

SCENIC CREEK APARTMENTS PWSOH7676612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCENIC CREEK APARTMENTS DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/20205LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/20205 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

WORD OF GOD COMMUNITY CHURCH INC PWS

2020 MONITORING SCHEDULE

OH7676812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WORD OF GOD COMMUNITY CHURCH DISTRIBUTIOGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WORD OF GOD COMMUNITY CHURCH INC PWS

2020 MONITORING SCHEDULE

OH7676812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WORD OF GOD COMMUNITY CHURCH INCGround Water

7662261

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SCOTT PROCESS SYSTEMS INC PLANT 1 PWSOH7676912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662270EP001

Facility Name: SCOTT PROCESS SYSTEMS INC PLANT 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

SCOTT PROCESS SYSTEMS INC PLANT 1 PWSOH7676912

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCOTT PROCESS SYS PLT 1 DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SCOTT PROCESS SYS PLT 1 DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

GRACE BAPTIST CHURCH-CANTON PWS

2020 MONITORING SCHEDULE

OH7677112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE BAPTIST CHURCH-CANTON DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GRACE BAPTIST CHURCH-CANTON PWS

2020 MONITORING SCHEDULE

OH7677112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE BAPTIST CHURCH-CANTONGround Water

7662274

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #14174 - HOMEWORTH

2020 MONITORING SCHEDULE

OH7677612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DOLLAR GENERAL #14174 - DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #14174 - HOMEWORTH

2020 MONITORING SCHEDULE

OH7677612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL #14174 - HOMEWORTHGround Water

7662469

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEECH CREEK BOTANICAL GARDENS PWS

2020 MONITORING SCHEDULE

OH7677614 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEECH CREEK BOTANICAL GARDENS DISTGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEECH CREEK BOTANICAL GARDENS PWS

2020 MONITORING SCHEDULE

OH7677614 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEECH CREEK BOTANICAL GARDENSGround Water

7662471

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVER OF LIFE CHURCH

2020 MONITORING SCHEDULE

OH7677615 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RIVER OF LIFE CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVER OF LIFE CHURCH

2020 MONITORING SCHEDULE

OH7677615 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIVER OF LIFE CHURCHGround Water

7662472

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ST JACOBS EVANGELICAL LUTHERAN CHURCH

2020 MONITORING SCHEDULE

OH7677617 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ST JACOBS EVANGELICAL LUTHERAN CHURCH

2020 MONITORING SCHEDULE

OH7677617 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ST JACOBS EVANGELICAL LUTHERAN CHURCHGround Water

7662474

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TIMOTHY ENTERPRISES LLC

2020 MONITORING SCHEDULE

OH7677618 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TIMOTHY ENTERPRISES LLC

2020 MONITORING SCHEDULE

OH7677618 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL STORE # 6564Ground Water

7662475

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEILER'S PENN DUTCH MARKET PWS

2020 MONITORING SCHEDULE

OH7677619 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEILER'S PENN DUTCH MARKET PWS

2020 MONITORING SCHEDULE

OH7677619 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEILER'S PENN DUTCH MARKETGround Water

7662476

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #9449 - CANTON SOUTH

2020 MONITORING SCHEDULE

OH7677621 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #9449 - CANTON SOUTH

2020 MONITORING SCHEDULE

OH7677621 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL STORE # 9449Ground Water

7662478

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KRAUS PIZZA PWS

2020 MONITORING SCHEDULE

OH7677622 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KRAUS PIZZA PWS

2020 MONITORING SCHEDULE

OH7677622 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KRAUS PIZZA

7662479

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE PROPERTIES-GEORGIO'S PIZZA PWS

2020 MONITORING SCHEDULE

OH7677623 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTVILLE PROPERTIES-GEORGIO'S PIZZA PWS

2020 MONITORING SCHEDULE

OH7677623 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HARTVILLE PROPERTIES - GEORGIO'S PIZZAGround Water

7662481

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MARATHON PETROLEUM COMPANY-CANTON TRUCKOH7677624

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662480EP001

Facility Name: MARATHON PETROLEUM CO - CANTON TRUCK

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020

MARATHON PETROLEUM COMPANY-CANTON TRUCKOH7677624

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

SPRINGWATER GARDENS CONDOMINIUMS PWSOH7677628

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662486EP001

Facility Name: SPRINGWATER GARDENS CONDOMINIUMS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

SPRINGWATER GARDENS CONDOMINIUMS PWSOH7677628

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONDS201 UNKNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

PEACE, LOVE AND LITTLE DONUTS PWS

2020 MONITORING SCHEDULE

OH7677629 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PEACE, LOVE AND LITTLE DONUTS PWS

2020 MONITORING SCHEDULE

OH7677629 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PEACE, LOVE AND LITTLE DONUTSGround Water

7662487

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #18257 - EAST SPARTA

2020 MONITORING SCHEDULE

OH7677630 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #18257 - EAST SPARTA

2020 MONITORING SCHEDULE

OH7677630 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: EAST SPARTA DOLLAR GENERALGround Water

7662488

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CREEKSIDE COTTAGE WINERY

2020 MONITORING SCHEDULE

OH7677632 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CREEKSIDE COTTAGE WINERY

2020 MONITORING SCHEDULE

OH7677632 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CREEKSIDE COTTAGE WINERY PLANTGround Water

7662490

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE WHETSTONE CENTER

2020 MONITORING SCHEDULE

OH7677633 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE WHETSTONE CENTER

2020 MONITORING SCHEDULE

OH7677633 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WHETSTONE CENTER PLANTGround Water

7662491

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #18872 - ROBERTSVILLE

2020 MONITORING SCHEDULE

OH7677634 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #18872 - ROBERTSVILLE

2020 MONITORING SCHEDULE

OH7677634 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL - ROBERTSVILLE PLANTGround Water

7662492

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

FRY FAMILY PARK

2020 MONITORING SCHEDULE

OH7677635 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

FRY FAMILY PARK

2020 MONITORING SCHEDULE

OH7677635 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FRY FAMILY PARK PLANTGround Water

7662493

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HERITAGE TRUCK EQUIPMENT PWSOH7677637

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7662495EP001

Facility Name: HERITAGE TRUCK EQUIPMENT PLANT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

HERITAGE TRUCK EQUIPMENT PWSOH7677637

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MARLBORO CHURCH OF CHRIST

2020 MONITORING SCHEDULE

OH7677638 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MARLBORO CHURCH OF CHRIST

2020 MONITORING SCHEDULE

OH7677638 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MARLBORO CHURCH OF CHRIST

7662496

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BARGAIN BARN

2020 MONITORING SCHEDULE

OH7677639 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BARGAIN BARN

2020 MONITORING SCHEDULE

OH7677639 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BARGAIN BARN PLANT

7662499

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE ICE CREAM-HARTVILLE

2020 MONITORING SCHEDULE

OH7677641 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW BALTIMORE ICE CREAM-HARTVILLE

2020 MONITORING SCHEDULE

OH7677641 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

07/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NEW BALTIMORE ICE CREAM-HARTVILLE PLANT

7662501

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MOTTS GREENHOUSE

2020 MONITORING SCHEDULE

OH7677645 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MOTTS GREENHOUSE

2020 MONITORING SCHEDULE

OH7677645 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

09/18/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MOTTS GREENHOUSE PLANT

7662504

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GREEN FARMS

2020 MONITORING SCHEDULE

OH7677646 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GREEN FARMS

2020 MONITORING SCHEDULE

OH7677646 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

09/18/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GREEN FARMS PLANT

7662505

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

top related