PROCHNOW RENOVATION, Project # 09.031.171 90% CD.pdf Markup Summary
Subject: NAUPage Label: A1-01 - FLOOR & REFLECTED CEILING PLANSAuthor: Frank ValdovinoDate: 12/11/2018 4:37:59 PM
What is MDC?Is this productavailable froma localvendor?
12/11/2018 4:37:59 PM (1)
Subject: Re: NAUPage Label: A1-01 - FLOOR & REFLECTED CEILING PLANSAuthor: Joshua SpearDate: 12/27/2018 8:17:00 AM
No this will bediscussed withPaint shopbefore finalselection. Thisproduct wasselected for itsdurability.
Subject: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: michael griffisDate: 12/12/2018 1:32:17 PM
Are thesedoors orhardwarebeingreplaced?
12/12/2018 1:32:17 PM (1)
Subject: Re: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: Joshua SpearDate: 12/27/2018 8:17:41 AM
No,As discussedin the meetingplease workwith TC forareas ofconcern andresolve outsideof this project.
UP
ADD ALT O6 - RE-CONDITION EXISTING SEATS A8.01
03
AUDITORIUM
101
A8.01
02
ADD ALT O3 - RE-CONDITION WOOD
PANELING AND NEW LIGHTS
ALL WORK ON AUDITORIUM FLOOR IS PART OF ADD ALT
O2
A8.0003
T EXISTING DIFFUSERS ATCH CEILING
MANUF: DUNN EDWARDSGLOSS: SATINCOLOR: POWDERED
MANUF: DUNN EDWARDSSERIES: SATINCOLOR: BLACK BEAN
-1
-2
-4
-5
-7
MANUF: MDCSERIES: LIQUAPEARLCOLOR: TBS
MANUF: WATER BASED STAIN TBSSERIES: TBSCOLOR: TBS
MANUF: MDCSERIES: LIQUAPEARLCOLOR: TBS
MANUF: MDCSERIES: LIQUAPEARLCOLOR: TBS
-8
CEILING FINISH KEY
What is MDC? Is thisproduct available froma local vendor?
170-12PT-8
PT-2
PT-2PT-1
CORNICE TRIM
E, L S
ALIGN
CABINE
114' 8'
Are these doors orhardware beingreplaced?
Subject: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: michael griffisDate: 12/12/2018 1:47:02 PM
Are thesedoors or ishardwarebeingreplaced?
12/12/2018 1:47:02 PM (1)
Subject: Re: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: Joshua SpearDate: 12/27/2018 8:17:48 AM
No,As discussedin the meetingplease workwith TC forareas ofconcern andresolve outsideof this project.
Subject: NAUPage Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Joshua SpearDate: 12/13/2018 10:32:44 AM
Where will thislive?
12/13/2018 10:32:44 AM (1)
Subject: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: drg8Date: 12/13/2018 2:31:24 PM
All lightingcontrol nomatter whatsystem(House,Dimming, etc.)need to bedesigned souser groups donot have toturn anybreakerson/off. DanGood
12/13/2018 2:31:24 PM (1)
DRINKING FOUNTAIN TO REMAINPAINT DOOR PT-2
PT-2
170-18PT-8 PT-8
PAINT DOOR PT-2
PT-1 PT-2
CORNICE TRIM
PT-2 AT BOXED BEAMS
1/4" = 1'-0"
LOBBY NORTH EL10Y EAST ELEVATION
Are these doors or ishardware beingreplaced?
STAGE FRONT PORTABLE LI
Where will this live?
ETHODS OR MATERIALS OTHER THAN THE BASIS OF DESIGN ARE USED.
GER THAN 200 FEET.
SMALLER.
DG
WL
IED. SUBMITTAL SHALL BE .
ESTING LABORATORY REPORT. FOR STALLED DIMMING CONTROLS ARE
NDED, AND PENDANT MOUNTED
2 INM
FL
SOR
CMPC
F
PSDAF
A
All lighting control no matter whatsystem (House, Dimming, etc.)need to be designed so usergroups do not have to turn anybreakers on/off. Dan Good
Subject: Re: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: Joshua SpearDate: 12/27/2018 8:18:16 AM
Agreed
Subject: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: Megan ProctorDate: 12/14/2018 10:42:30 AM
I havequestions/concerns about thebi-fold doorfunctionalityand durability.Would it bepossible to geta better pictureof what theywill look likeopen andclosed?
12/14/2018 10:42:30 AM (1)
Subject: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: Justin DiNardiDate: 12/5/2018 10:02:40 AM
lots ofoverwrittentext on thispage. can weclean it up?
12/5/2018 10:02:40 AM (1)
Subject: Re: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: Joshua SpearDate: 12/27/2018 8:08:41 AM
This will becorrected byDesignProfessionalfor the 100%review set
17A1.10
COUNTER
2' -
2 1
/2"
COUNTER
CUSTOM PERFORATED PATTERNBI-FOLD DOORS
OR FOR SODA MACHINE ACCESS
I have questions/concernsabout the bi-fold doorfunctionality and durability.Would it be possible to get abetter picture of what they willlook like open and closed?
MANUALS F
PROVIDE BO
RECORD DOMAINTAIN ADETAIL. MASUPPLEMENAND KEEP T
UPON COMP
CLEANINGTHOROUGHEQUIPMENT
26 05 05 ELE
THE DRAWISUBMITTING
WHERE WAEQUIPMENT
WHERE CEIDEVICES, F
lots of overwritten texton this page. can weclean it up?
Subject: NAUPage Label: E0-00 - ELECTRICAL COVER SHEETAuthor: Justin DiNardiDate: 12/5/2018 10:50:59 AM
lots ofoverwrittentext on thispage. can weclean it up?
12/5/2018 10:50:59 AM (1)
Subject: Re: NAUPage Label: E0-00 - ELECTRICAL COVER SHEETAuthor: Joshua SpearDate: 12/27/2018 8:09:30 AM
This will becorrected byDesignProfessionalfor 100%Review set
Subject: NAUPage Label: E1-01 - LEVEL 01 - ELECTRICAL LIGHTING PLANAuthor: Justin DiNardiDate: 12/5/2018 10:55:11 AM
will the lightingunder thestage remainin place or bereplaced?
12/5/2018 10:55:11 AM (1)
Subject: Re: NAUPage Label: E1-01 - LEVEL 01 - ELECTRICAL LIGHTING PLANAuthor: Joshua SpearDate: 12/27/2018 8:11:28 AM
As discussedin the reviewmeeting thelighting and pitunder thestage will besealed up dueto the rebuildof the front ofstage.
Subject: Cloud+Page Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Jamie AxelrodDate: 12/7/2018 8:12:17 AM
Why did wechose to gowith a portablelift. When wemet onsite itseemed likethis was theleastdesireableoption
12/7/2018 8:12:17 AM (1)
MPEDANCE PMENT. ALL
UIPMENT THE OTHER
LS. ALL CTOR AT THE GROUTED OR
ARDS. QUALIFYING RVES THE
XPENSE, OF
ED FOR THE LES WITH
LOGY L CEILING
M FIELD NDITIONS
RIFY RE STARTING
CONDUITS EXISTING
:NOT LIMITED
lots of overwritten texton this page. can weclean it up?
UP
C147
DN
J
3 33 3
TL3 (TYP.)EX
2
4
STAGE
LIGHTS
DIMMER HOUSE LIGHTING
WIRING PULLBOX
DIMMER SWITCH
UL LISTED
TRANSFER RELAY
EMP
ATS
EX. PANEL
'HLTG'
EXT.D/1/a
(a)(b)(c)(d)
(b)
7(TYP.)
will the lighting underthe stage remain inplace or be replaced?
Why did we chose to go with a portable lift.When we met onsite it seemed like this wasthe least desireable option
Subject: Re: Cloud+Page Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Joshua SpearDate: 12/27/2018 8:12:40 AM
As discussedboth the stairsand portablelift are placedas needed ontemporarybasis. This isper discussionand we areworking onwhere the liftwill live whennot in use.
Subject: CalloutPage Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Jamie AxelrodDate: 12/7/2018 8:15:14 AM
I haveconcernsabout thisbeing apermanentsolution. I thinkwe shouldconsider stairsthat retract intoa lift located atthe side of thestage.Something likethishttps://www.sesameaccess.com/
12/7/2018 8:15:14 AM (1)
Subject: Re: CalloutPage Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Joshua SpearDate: 12/27/2018 8:13:06 AM
As discussedboth the stairsand portablelift are placedas needed ontemporarybasis. This isper discussionand we areworking onwhere the liftwill live whennot in use.
4"
STAGE FRONT PO
I have concernsabout this being apermanent solution. Ithink we shouldconsider stairs thatretract into a liftlocated at the side ofthe stage. Somethinglike thishttps://www.sesameaccess.com/
Subject: NAUPage Label: M2-00 - MEZZANINE LEVEL - VENTILATION PLANAuthor: Justin DiNardiDate: 12/8/2018 9:38:30 PM
I recall themezzaninelackedappropriateplatforms forwork andservicing. willthis beaddressed withthis project?
12/8/2018 9:38:30 PM (1)
Subject: Re: NAUPage Label: M2-00 - MEZZANINE LEVEL - VENTILATION PLANAuthor: Joshua SpearDate: 12/27/2018 8:15:49 AM
Platforms andpathways wereinstalled toservice allmechanicalequipmentabove ceilingin the 2012project. Thereis a lack ofaccess to eachlight fixture weareconsideringbuying a selflevelingboom-lift toaccess lightsfrom the floor.
30x30
I recall the mezzaninelacked appropriateplatforms for work andservicing. will this beaddressed with thisproject?