PROCHNOW RENOVATION, Project # 09.031.171 90% CD.pdf Markup Summary Subject: NAU Page Label: A1-01 - FLOOR & REFLECTED CEILING PLANS Author: Frank Valdovino Date: 12/11/2018 4:37:59 PM What is MDC? Is this product available from a local vendor? 12/11/2018 4:37:59 PM (1) Subject: Re: NAU Page Label: A1-01 - FLOOR & REFLECTED CEILING PLANS Author: Joshua Spear Date: 12/27/2018 8:17:00 AM No this will be discussed with Paint shop before final selection. This product was selected for its durability. Subject: NAU Page Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILS Author: michael griffis Date: 12/12/2018 1:32:17 PM Are these doors or hardware being replaced? 12/12/2018 1:32:17 PM (1) Subject: Re: NAU Page Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILS Author: Joshua Spear Date: 12/27/2018 8:17:41 AM No, As discussed in the meeting please work with TC for areas of concern and resolve outside of this project. UP ADD ALT O6 - RE-CONDITION EXISTING SEATS A8.01 03 AUDITORIUM 101 A8.01 02 ADD ALT O3 - RE- CONDITION WOOD PANELING AND NEW LIGHTS ALL WORK ON AUDITORIUM FLOOR IS PART OF ADD ALT O2 A8.00 03 T EXISTING DIFFUSERS ATCH CEILING MANUF: DUNN EDWARDS GLOSS: SATIN COLOR: POWDERED MANUF: DUNN EDWARDS SERIES: SATIN COLOR: BLACK BEAN -1 -2 -4 -5 -7 MANUF: MDC SERIES: LIQUAPEARL COLOR: TBS MANUF: WATER BASED STAIN TBS SERIES: TBS COLOR: TBS MANUF: MDC SERIES: LIQUAPEARL COLOR: TBS MANUF: MDC SERIES: LIQUAPEARL COLOR: TBS -8 CEILING FINISH KEY What is MDC? Is this product available from a local vendor? 170-12 PT-8 PT-2 PT-2 PT-1 CORNICE TRIM E, L S ALIGN CABINE 11 4' 8' Are these doors or hardware being replaced?

Upload: others

Post on 22-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 12/11/2018 4:37:59 PM (1) - in.nau.edu · 2019. 1. 10. · Date: 12/14/2018 10:42:30 AM I have questions/conc erns about the bi-fold door functionality and durability. Would it be

PROCHNOW RENOVATION, Project # 09.031.171 90% CD.pdf Markup Summary

Subject: NAUPage Label: A1-01 - FLOOR & REFLECTED CEILING PLANSAuthor: Frank ValdovinoDate: 12/11/2018 4:37:59 PM

What is MDC?Is this productavailable froma localvendor?

12/11/2018 4:37:59 PM (1)

Subject: Re: NAUPage Label: A1-01 - FLOOR & REFLECTED CEILING PLANSAuthor: Joshua SpearDate: 12/27/2018 8:17:00 AM

No this will bediscussed withPaint shopbefore finalselection. Thisproduct wasselected for itsdurability.

Subject: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: michael griffisDate: 12/12/2018 1:32:17 PM

Are thesedoors orhardwarebeingreplaced?

12/12/2018 1:32:17 PM (1)

Subject: Re: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: Joshua SpearDate: 12/27/2018 8:17:41 AM

No,As discussedin the meetingplease workwith TC forareas ofconcern andresolve outsideof this project.

UP

ADD ALT O6 - RE-CONDITION EXISTING SEATS A8.01

03

AUDITORIUM

101

A8.01

02

ADD ALT O3 - RE-CONDITION WOOD

PANELING AND NEW LIGHTS

ALL WORK ON AUDITORIUM FLOOR IS PART OF ADD ALT

O2

A8.0003

T EXISTING DIFFUSERS ATCH CEILING

MANUF: DUNN EDWARDSGLOSS: SATINCOLOR: POWDERED

MANUF: DUNN EDWARDSSERIES: SATINCOLOR: BLACK BEAN

-1

-2

-4

-5

-7

MANUF: MDCSERIES: LIQUAPEARLCOLOR: TBS

MANUF: WATER BASED STAIN TBSSERIES: TBSCOLOR: TBS

MANUF: MDCSERIES: LIQUAPEARLCOLOR: TBS

MANUF: MDCSERIES: LIQUAPEARLCOLOR: TBS

-8

CEILING FINISH KEY

What is MDC? Is thisproduct available froma local vendor?

170-12PT-8

PT-2

PT-2PT-1

CORNICE TRIM

E, L S

ALIGN

CABINE

114' 8'

Are these doors orhardware beingreplaced?

Page 2: 12/11/2018 4:37:59 PM (1) - in.nau.edu · 2019. 1. 10. · Date: 12/14/2018 10:42:30 AM I have questions/conc erns about the bi-fold door functionality and durability. Would it be

Subject: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: michael griffisDate: 12/12/2018 1:47:02 PM

Are thesedoors or ishardwarebeingreplaced?

12/12/2018 1:47:02 PM (1)

Subject: Re: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: Joshua SpearDate: 12/27/2018 8:17:48 AM

No,As discussedin the meetingplease workwith TC forareas ofconcern andresolve outsideof this project.

Subject: NAUPage Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Joshua SpearDate: 12/13/2018 10:32:44 AM

Where will thislive?

12/13/2018 10:32:44 AM (1)

Subject: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: drg8Date: 12/13/2018 2:31:24 PM

All lightingcontrol nomatter whatsystem(House,Dimming, etc.)need to bedesigned souser groups donot have toturn anybreakerson/off. DanGood

12/13/2018 2:31:24 PM (1)

DRINKING FOUNTAIN TO REMAINPAINT DOOR PT-2

PT-2

170-18PT-8 PT-8

PAINT DOOR PT-2

PT-1 PT-2

CORNICE TRIM

PT-2 AT BOXED BEAMS

1/4" = 1'-0"

LOBBY NORTH EL10Y EAST ELEVATION

Are these doors or ishardware beingreplaced?

STAGE FRONT PORTABLE LI

Where will this live?

ETHODS OR MATERIALS OTHER THAN THE BASIS OF DESIGN ARE USED.

GER THAN 200 FEET.

SMALLER.

DG

WL

IED. SUBMITTAL SHALL BE .

ESTING LABORATORY REPORT. FOR STALLED DIMMING CONTROLS ARE

NDED, AND PENDANT MOUNTED

2 INM

FL

SOR

CMPC

F

PSDAF

A

All lighting control no matter whatsystem (House, Dimming, etc.)need to be designed so usergroups do not have to turn anybreakers on/off. Dan Good

Page 3: 12/11/2018 4:37:59 PM (1) - in.nau.edu · 2019. 1. 10. · Date: 12/14/2018 10:42:30 AM I have questions/conc erns about the bi-fold door functionality and durability. Would it be

Subject: Re: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: Joshua SpearDate: 12/27/2018 8:18:16 AM

Agreed

Subject: NAUPage Label: A1-10 - ENLARGED LOBBY PLAN, ELEVATIONS & DETAILSAuthor: Megan ProctorDate: 12/14/2018 10:42:30 AM

I havequestions/concerns about thebi-fold doorfunctionalityand durability.Would it bepossible to geta better pictureof what theywill look likeopen andclosed?

12/14/2018 10:42:30 AM (1)

Subject: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: Justin DiNardiDate: 12/5/2018 10:02:40 AM

lots ofoverwrittentext on thispage. can weclean it up?

12/5/2018 10:02:40 AM (1)

Subject: Re: NAUPage Label: E6-00 - ELECTRICAL SPECIFICATIONSAuthor: Joshua SpearDate: 12/27/2018 8:08:41 AM

This will becorrected byDesignProfessionalfor the 100%review set

17A1.10

COUNTER

2' -

2 1

/2"

COUNTER

CUSTOM PERFORATED PATTERNBI-FOLD DOORS

OR FOR SODA MACHINE ACCESS

I have questions/concernsabout the bi-fold doorfunctionality and durability.Would it be possible to get abetter picture of what they willlook like open and closed?

MANUALS F

PROVIDE BO

RECORD DOMAINTAIN ADETAIL. MASUPPLEMENAND KEEP T

UPON COMP

CLEANINGTHOROUGHEQUIPMENT

26 05 05 ELE

THE DRAWISUBMITTING

WHERE WAEQUIPMENT

WHERE CEIDEVICES, F

lots of overwritten texton this page. can weclean it up?

Page 4: 12/11/2018 4:37:59 PM (1) - in.nau.edu · 2019. 1. 10. · Date: 12/14/2018 10:42:30 AM I have questions/conc erns about the bi-fold door functionality and durability. Would it be

Subject: NAUPage Label: E0-00 - ELECTRICAL COVER SHEETAuthor: Justin DiNardiDate: 12/5/2018 10:50:59 AM

lots ofoverwrittentext on thispage. can weclean it up?

12/5/2018 10:50:59 AM (1)

Subject: Re: NAUPage Label: E0-00 - ELECTRICAL COVER SHEETAuthor: Joshua SpearDate: 12/27/2018 8:09:30 AM

This will becorrected byDesignProfessionalfor 100%Review set

Subject: NAUPage Label: E1-01 - LEVEL 01 - ELECTRICAL LIGHTING PLANAuthor: Justin DiNardiDate: 12/5/2018 10:55:11 AM

will the lightingunder thestage remainin place or bereplaced?

12/5/2018 10:55:11 AM (1)

Subject: Re: NAUPage Label: E1-01 - LEVEL 01 - ELECTRICAL LIGHTING PLANAuthor: Joshua SpearDate: 12/27/2018 8:11:28 AM

As discussedin the reviewmeeting thelighting and pitunder thestage will besealed up dueto the rebuildof the front ofstage.

Subject: Cloud+Page Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Jamie AxelrodDate: 12/7/2018 8:12:17 AM

Why did wechose to gowith a portablelift. When wemet onsite itseemed likethis was theleastdesireableoption

12/7/2018 8:12:17 AM (1)

MPEDANCE PMENT. ALL

UIPMENT THE OTHER

LS. ALL CTOR AT THE GROUTED OR

ARDS. QUALIFYING RVES THE

XPENSE, OF

ED FOR THE LES WITH

LOGY L CEILING

M FIELD NDITIONS

RIFY RE STARTING

CONDUITS EXISTING

:NOT LIMITED

lots of overwritten texton this page. can weclean it up?

UP

C147

DN

J

3 33 3

TL3 (TYP.)EX

2

4

STAGE

LIGHTS

DIMMER HOUSE LIGHTING

WIRING PULLBOX

DIMMER SWITCH

UL LISTED

TRANSFER RELAY

EMP

ATS

EX. PANEL

'HLTG'

EXT.D/1/a

(a)(b)(c)(d)

(b)

7(TYP.)

will the lighting underthe stage remain inplace or be replaced?

Why did we chose to go with a portable lift.When we met onsite it seemed like this wasthe least desireable option

Page 5: 12/11/2018 4:37:59 PM (1) - in.nau.edu · 2019. 1. 10. · Date: 12/14/2018 10:42:30 AM I have questions/conc erns about the bi-fold door functionality and durability. Would it be

Subject: Re: Cloud+Page Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Joshua SpearDate: 12/27/2018 8:12:40 AM

As discussedboth the stairsand portablelift are placedas needed ontemporarybasis. This isper discussionand we areworking onwhere the liftwill live whennot in use.

Subject: CalloutPage Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Jamie AxelrodDate: 12/7/2018 8:15:14 AM

I haveconcernsabout thisbeing apermanentsolution. I thinkwe shouldconsider stairsthat retract intoa lift located atthe side of thestage.Something likethishttps://www.sesameaccess.com/

12/7/2018 8:15:14 AM (1)

Subject: Re: CalloutPage Label: G2-00 - ACCESSIBILITY & MOUNTING HIEGHTSAuthor: Joshua SpearDate: 12/27/2018 8:13:06 AM

As discussedboth the stairsand portablelift are placedas needed ontemporarybasis. This isper discussionand we areworking onwhere the liftwill live whennot in use.

4"

STAGE FRONT PO

I have concernsabout this being apermanent solution. Ithink we shouldconsider stairs thatretract into a liftlocated at the side ofthe stage. Somethinglike thishttps://www.sesameaccess.com/

Page 6: 12/11/2018 4:37:59 PM (1) - in.nau.edu · 2019. 1. 10. · Date: 12/14/2018 10:42:30 AM I have questions/conc erns about the bi-fold door functionality and durability. Would it be

Subject: NAUPage Label: M2-00 - MEZZANINE LEVEL - VENTILATION PLANAuthor: Justin DiNardiDate: 12/8/2018 9:38:30 PM

I recall themezzaninelackedappropriateplatforms forwork andservicing. willthis beaddressed withthis project?

12/8/2018 9:38:30 PM (1)

Subject: Re: NAUPage Label: M2-00 - MEZZANINE LEVEL - VENTILATION PLANAuthor: Joshua SpearDate: 12/27/2018 8:15:49 AM

Platforms andpathways wereinstalled toservice allmechanicalequipmentabove ceilingin the 2012project. Thereis a lack ofaccess to eachlight fixture weareconsideringbuying a selflevelingboom-lift toaccess lightsfrom the floor.

30x30

I recall the mezzaninelacked appropriateplatforms for work andservicing. will this beaddressed with thisproject?