50 Old River Road A Multi-Use Site
Presented by
Bob Skinner, George Wallace, and Bob Martin March 21, 2016
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
2/18
Presentation Outline
Site Use & Background History
Possibilities
Next Steps
1
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
3/18
Current Use Of Site
Department of Public Works
Water Pollution Control FacilityBicentennial Park
Bike/Walking Trail
Limited River Access
2
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
4/18
Existing Use Of Site
3
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
5/18
2011 - Proposed Use Of Site
4
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
6/18
2012 - Proposed Use Of Site
5
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
7/18
Future Site Use Possibilities
Continue Complementary Use Of The Site
Recreation
Enhanced River Access Scenic River Picnic Areas Additional Trail Parking Groomed Ball Field
Public Works New Access Road New Facility
Water Pollution Control Facility
6
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
8/18
Preliminary Schematic Site Plan – Grading
7
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
9/18
Future Proposed Use Of Site
8
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
10/18
DPW Facility – 1st Floor Layout
9
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
11/18
DPW Facility – 1st Floor Equipment Layout
10
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
12/18
DPW Facility – 2nd Floor Layout
11
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
13/18
DPW Facility – Elevation Views
12
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
14/18
Preliminary DPW Facility Cost Estimate
13
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
15/18
Proposed Mitigation – Site Cut & Fill
14
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
16/18
Proposed Mitigation – Site Drainage
15
-
8/16/2019 05.25.16 PH-50 Old River Road Proposal
17/18
Next Steps
Boards & Commissions Permanent Municipal Building Committee
Professional Services Cost Analysis
Concept Drawings
Survey
Formal Plans