AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:. INSTALLATION CONDITIONS. SYSTEM AGE: 16 YEARS 85 – 90° F 85% HUMIDITY 9:30 AM EST SYSTEM TEMPERATURE 24° F 4” O.D. PRIMED STEEL PIPE 4” STYROFOAM INSULATION RG-2400 LT AT AMBIENT (90-96° F) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

AMMONIA SYSTEM AMMONIA SYSTEM INSTALLATION EXAMPLE ON INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:OPERATING SYSTEM USING:

Page 2: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

SYSTEM AGE: 16 YEARSSYSTEM AGE: 16 YEARS

85 – 90° F85 – 90° F

85% HUMIDITY85% HUMIDITY

9:30 AM EST9:30 AM EST

SYSTEM TEMPERATURE 24° FSYSTEM TEMPERATURE 24° F

4” O.D. PRIMED STEEL PIPE4” O.D. PRIMED STEEL PIPE

4” STYROFOAM INSULATION4” STYROFOAM INSULATION

RG-2400 RG-2400 LTLT AT AMBIENT (90-96° F) AT AMBIENT (90-96° F)

INSTALLATION TIME 21 MINUTESINSTALLATION TIME 21 MINUTES

INSTALLATION CONDITIONSINSTALLATION CONDITIONS

Page 3: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

PICTORAL INSTALLATIONPICTORAL INSTALLATION

REMOVING METAL JACKET

Page 4: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

METAL JACKET REMOVED

ASJ ON STYROFOAM

STYRO

FIBERGLASS EXPANSION JOINT

After removing approximately 6’ of metal jacketing, we knew corrosion would be present due to the fiberglass present, and the lack of a vapor retarder on some of the styrofoam insulation.

REMAINING PRIMER EASILY REMOVED

Page 5: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

CLOSE-UP OF EXPANSION JOINT

Page 6: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

PRIMER ON INSULATION

CORROSION ON PIPE

Page 7: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:
Page 8: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

REMAINING PRIMER EASILY REMOVED

Page 9: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

PIPE IS READY FOR RG-2400 LT

Note slight frost already forming on the pipe surface.

Primer which was well adhered to the pipe does not have to be removed.

Page 10: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

INSTALLING RG-2400 LT

Page 11: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

INSTALLING RG-2400 LT

Pipe temperature thickens the RG-2400 LT quickly. After 3 passes over an area it gets difficult to spread and achieve adhesion.

The slight frost on the pipe left some voids, however fresh “warm” material could be put over these areas and achieve ahesion.

Page 12: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:
Page 13: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

A WELL COATED PIPE READY FOR INSULATION

Page 14: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:
Page 15: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:
Page 16: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:
Page 17: AMMONIA SYSTEM INSTALLATION EXAMPLE ON OPERATING SYSTEM USING:

CONCLUSIONSCONCLUSIONS

•COATING A 24° PIPE IN OPERATION IS POSSIBLE IN SMALL SECTIONS.

•RG-2400 MUST BE WARM TO IMPROVE COVERAGE AND EASE OF APPLICATION

•INSULATION MUST BE INSTALLED IMMEDIATELY UPON ACHIEVING COVERAGE TO PREVENT CONDENSATION FROM FORMING ON THE RG-2400

•INSULRAP OR FABWRAP VAPOR BARRIER SHOULD BE USED TO KEEP OUT MOISTURE

•TESTING WILL CONTINUE ON -15° F LINES IN OPERATION AND -50° F LINES IN OPERATION. RESULTS WILL BE ADDED TO THIS PPT PRESENTATION.

•GLYCOL WILL BE TESTED TO REMOVE FROST ON THE COLDER LINES.