amendment to the design and operations report bluewater wind … · 2018. 6. 22. · report –...

24
Prepared by: AECOM 105 Commerce Valley Drive West, Floor 7 905 886 7022 tel Markham, ON, Canada L3T 7W3 905 886 9494 fax www.aecom.com Project Number: 60301207 Date: September, 2013 Environment Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

Upload: others

Post on 07-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Prepared by: AECOM 105 Commerce Valley Drive West, Floor 7 905 886 7022 tel Markham, ON, Canada L3T 7W3 905 886 9494 fax www.aecom.com Project Number: 60301207 Date: September, 2013

Environment

Varna Wind, Inc.

Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

Page 2: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207

Table of Contents

page

1. Introduction .................................................................................................................................. 1

1.1 The Proponent ..................................................................................................................................... 1 1.2 Project Study Area ............................................................................................................................... 1

2. Proposed Project Modifications .................................................................................................. 2

3. Edits to the Design and Operations Report ............................................................................... 5

4. Summary and Conclusions ......................................................................................................... 9

List of Figures

Figure 2-1 Modified Project Location ........................................................................................................................... 4

List of Tables

Table 2-1 Summary of Project Modifications .............................................................................................................. 3

Table 3-1 Edits to the Design and Operations Report ............................................................................................... 6

List of Appendices

Appendix A. Project Modifications Appendix B. Amended Figures for the Design and Operations Report Glossary of Terms

EIS ............................. Environmental Impact Study MNR ........................... Ministry of Natural Resources MTCS ......................... Ministry of Tourism, Culture and Sport mVA ........................... mega Volt-Ampere NextEra ...................... NextEra Energy Canada, ULC NHA ........................... Natural Heritage Assessment O.Reg. 359/09............ Ontario Regulation 359/09 POI ............................. Point of Interconnect The Project ................. Bluewater Wind Energy Centre REA ............................ Renewable Energy Approval

Page 3: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 1

1. Introduction

Varna Wind, Inc. (Varna) is proposing to construct a wind energy centre in the Municipality of Bluewater and the Municipality Huron East in Huron County, Ontario. The following sections of this Renewable Energy Approval (REA) Amendment Report describe the proposed modifications to this Project and resulting updates to the Design and Operations Report.

1.1 The Proponent

The Project will be owned and operated by Varna, a wholly owned subsidiary of NextEra Energy Canada, ULC (NextEra). NextEra’s indirect parent company is NextEra Energy Resources, LLC. The proponent has not changed from the initial REA submission. The primary contacts for the Project are as follows:

Project Proponent Project Consultant

Nicole Geneau Project Director NextEra Energy Canada, ULC 390 Bay Street, Suite 1720 Toronto, ON M5H 2Y2 Phone:…..1-416-364-9714 Email: ...... [email protected] Website: ... www.NextEraEnergyCanada.com

Marc Rose Senior Environmental Planner AECOM 105 Commerce Valley Drive West, Floor 7 Markham, ON, Canada L3T 7W3 Phone: .....905-747-7793 Email: [email protected]

1.2 Project Study Area

The proposed Project is located in the Municipality of Bluewater and the Municipality Huron East in Huron County, Ontario (refer to Figure 2-1). The Project Study Area has not changed from the initial REA submission. The following co-ordinates define the external boundaries of the Project Study Area:

Longitude Latitude

-81.680043 43.553413

-81.350138 43.534437

-81.402727 43.471275

-81.679229 43.433866

Page 4: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 2

2. Proposed Project Modifications

Varna is proposing modifications to the Project. These proposed Project modifications are categorized as follows:

Construction disturbance area modified to reduce or eliminate impacts to Conservation Authority regulation limit; and,

Infrastructure or construction disturbance area added or changed to optimize project design/ constructability.

Table 2-1 summarizes and documents the following about each of the proposed modifications:

1. A description of the modification and a rationale for why the modification is proposed; and 2. New potential environmental effects and corresponding mitigation measures.

Figure 2-1 illustrates the modified Project Location. Appendix A contains a series of figures showing the details for each of the modifications.

Page 5: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 3

Table 2-1 Summary of Project Modifications

Label on Figure 2-1 Proposed Modification Rationale for Proposed Modification New Potential Environmental Effects New Mitigation

Measures A1 Addition of road to Turbine 7 to travel north towards Crystal Springs Road Infrastructure or construction disturbance area added or changed to optimize project design/

constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage N/A

A2 Removal of construction disturbance area to the south east of Turbine 10 Construction disturbance area modified to reduce or eliminate impacts to Conservation Authority regulation limit

None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage N/A

B1 Addition of construction disturbance area to the north of Turbine 32 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage features within 120 m; area previously studied for cultural heritage and water body features

N/A

B2 Addition of construction disturbance area to the east of Turbine 41 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage features within 120 m; area previously studied for cultural heritage and water body features N/A

C1 Addition of construction disturbance area to the west of Turbine 2 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

C2 Addition of construction disturbance area to the south and east of Turbine 14 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

D1 Removal of construction disturbance area to the south west of Turbine 3 Construction disturbance area modified to reduce or eliminate impacts to Conservation Authority regulation limit

None – no new natural heritage features within 120 m; area previously studied for cultural heritage and water body features

N/A

D2 Addition of construction disturbance area to the south of Turbine 17 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

D3 Addition of construction disturbance area to the east of Turbine 4 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

E1 – E2 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage features within 120 m; area previously studied for cultural heritage and water body features

N/A

E3 Addition of construction disturbance area to the north of Turbine 36 Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

E4 Addition of construction disturbance area for the transmission line on private property to the north of Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

E5 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

F1 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage features within 120 m; area previously studied for cultural heritage and water body features

N/A

F2 Addition of construction disturbance area for the transmission line on private property to the north of Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

F3 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Centennial Road.

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

G1 – G4 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

H1 Addition of construction disturbance area for the transmission line on private property to the north of Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

H2 Addition of construction disturbance area for the transmission line on private properties to the north of Centennial Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

H3 – H4 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Hensall Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage features within 120 m; area previously studied for cultural heritage and water body features

N/A

I1 Addition of construction disturbance area for the transmission line POI to the north of the existing disturbance area

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

I2 Addition of construction disturbance area for the transmission line in the municipal road right-of-way along Hensall Road

Construction disturbance area added or changed to optimize project design/ constructability None – no new natural heritage or water body features within 120 m; area previously studied for cultural heritage

N/A

N/A Use of a spare 170 mVA transformer to be stored within the existing footprint of the Jericho Wind Energy Centre substation

N/A N/A N/A

Page 6: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(!(!(

!( !(!(

!(

!(

!(!(

!( !(

!(

!(!( !(

!(!(

!(

!(I2

H4

F1 H2

G4F3 G2

I1

H3G3

E5E4

C1

A1

H1

G1F2

E3

E2E1

B2

D3

D1D2

C2

B1

A2

I

F

EC

D

H

B

A

G

Staffa Rd

Parr Line

Kippen Rd

Hensa

ll Rd

London Rd

Airport Line

182 Rd

Mill Rd

Morrison LineCentennial Rd

Bronson Line

Perth

183 R

d

Goshen Line

Walnut Rd

181 Rd

21 Line

Division Line

Tile Rd

Roman Rd

19 Line

Pavillion Rd

Babylon Line

Bell's Line

Bannockburn Line

26 Line

Zurich-hensall Rd

Hanna

h Line

Stone Rd

Short Horn Rd

Danceland Rd

Rogerville Rd

Front Rd

Blind Line

Perth 24 Line

Huron Rd

28 Line

Fansville Line

Chiselhurst Rd

Oak Rd

Blackbush Line

Kinbur

n Line

Hydro Line Rd

King St

Stanley Rd

Wildw

ood L

ine

Conc 5 Rd

Ausable LineGulley Line

Crystal Springs Rd

Perth 17 Rd

32 Line

North

Line

Bayfield River Rd

Perth

180 R

d

Main St

Roxb

oro Li

ne

Birch St

Blue Bluff Rd

Harpurhey Rd

Main St

N

Mill St

Market St

Smirnoff Line

Sills S

t

Tower Line

York St

Albert

St

Main St S

Water S

tWilliam St Co

leman

St

Lorne Ave

Ellen St N

Mary St

John St

East St

Babylon Line

Zurich-hensall Rd

Bron

son L

ine

Front Rd

Pavillion Rd

Front Rd Huron Rd

Centennial Rd

5

7

3

1

8

9

6

4

2

32

1626

3736

30

11

35

39

24

29

14

34

28

41

33

13

1525

2312

40

21

27

22

17

10

38

18

31

19

Path

: G:\C

AKCN

-Env

ironm

ent\6

0155

032_

BLW

_Lay

outC

hang

es_2

0130

808.

mxd

UTM Z one 17N , NAD 8 3

Project Locat ion

Figure 1

Sept em ber 20 13Pro je ct 60 15 503 2

Blu ewate r Wind Ene rg y Ce ntreREA Am end me nt

This drawing has been p repared for the use of AECOM 's c lient and m ay not be used, reproduced or reli ed upon by thi rd parti es,except as agreed by AECOM and it s c lient , as requi red by law or for use by governm ental reviewing agenci es. AECOM accepts no resp onsibi lit y, and deni es any liabi lity wha tsoeve r, to any partythat m odifi es thi s drawing without AECOM 's expre ss writ ten consent .

1:65 ,00 0

Pro d u ce d b y AEC O M u n d er lice n ce f r om O n ta rio M in ist ry o f N a tu r al R es o ur c es , Co p yr ig h t © Q u e e ns P rin t er 2 0 1 3

²

LegendTransmission Line Stu dy Are aWind Ene rgy Cen tre Study AreaProperties

Janua ry 2013 - 120m Area of Investig ationTurbines and Pe rmanent Meterological Tower!( Ad ded!( Removed!( No Chang e

Layout Modification (Type, Status)Collection Lin e, AddedRoad, AddedCollection Lin e, RemovedRoad, Re movedCollection Lin e, No Ch angeAccess Road, No ChangeTransmission Line, No Cha nge

Modification to Disturba nce AreasStatus

Add edRemovedNo Chang e

Layout M odification Loc ationsA1(Aug ust 20 13 - 120m Area of InvestigationChange Map ExtentA

murrayj8
Text Box
Figure 2-1
Page 7: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 5

3. Edits to the Design and Operations Report

Table 3-1 documents the edits to the Design and Operations Report resulting from the modifications described above. The table includes the text from the original REA submission (AECOM, June 2012) and the Addendum to the Design and Operations Report – Bluewater Wind Energy Centre (AECOM, March 2013), and edits to the text (underlined text represents additions and strikethrough text represents deletions). Updated figures are included in Appendix B of this Amendment Report.

Page 8: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 6

Table 3-1 Edits to the Design and Operations Report

Section / Page Original Text* Revised Text* (underlined text represents additions and strikethrough text represents deletions)

Section 2 / page 5 The proposed Project Location is shown on Figure 2-1, 2-2 and 2-3 in Appendix B, and includes the components of the Project listed below: Approximately 37 km of turbine access roads; and

The proposed Project Location is shown on Figure 2-1, 2-2 and 2-3 in Appendix B, and includes the components of the Project listed below: Approximately 37 38 km of turbine access roads; and

Section 3.5 / page 11 All substation grounding equipment will meet the Ontario Electrical Safety Code. All substation and breaker switch station grounding equipment will meet the Ontario Electrical Safety Code. Section 4.4 / page 13 The collector lines and substation will require periodic preventative maintenance activities. Routine maintenance will include condition

assessment for above-ground infrastructure and protective relay maintenance of the substation, in addition to monitoring of the secondary containment system for traces of oil. Finally, vegetation control will be required around the transmission line to prevent any damage to the line and ensure safe operation.

The collector lines and substation will require periodic preventative maintenance activities. Routine maintenance will include condition assessment for above-ground infrastructure and protective relay maintenance of the substation, in addition to monitoring of the secondary containment system for traces of oil. Finally, vegetation control will be required around the transmission line to prevent any damage to the line and ensure safe operation. In the event of a transformer failure, a spare transformer (stored within the existing footprint of the Jericho Wind Energy Centre substation) will be installed at the same location as the transformer proposed for the Bluewater WEC.

Section 6.1 / page 16 In 2013, a third phase of the Stage 2 archaeological assessment was conducted in the wind energy centre study area. A total of 2 additional sites were recorded, neither of which were recommended for a Stage 3 archaeological assessment. The additional Stage 2 archaeological assessment was submitted to the MTCS on August 28, 2013, and sign-off was received from the MTCS on September 9, 2013.

Section 6.1 / page 16 A Cultural Heritage Assessment was also completed to address built heritage and cultural heritage landscape resources related to the Euro-Canadian land use in the area dating prior to 1970. All work was carried out in accordance with the Ontario Heritage Act, the Provincial Policy Statement, and the Environmental Assessment Act. The report identified 76 structures (45 houses and 31 barns) as greater than 40 years old within the Project Study Area and as having general historical interest as they contribute to the character of the vernacular rural landscape. When applying the criteria set out in Ontario Regulation 9/06, none of these structures were determined to have cultural heritage value or interest. This report was submitted to the MTCS for review and comment. Sign-off from the Ministry confirming that the report is satisfactory was received on March 22, 2012.

A Cultural Heritage Assessments was also completed to address built heritage and cultural heritage landscape resources related to the Euro-Canadian land use in the area dating prior to 1970. All work was carried out in accordance with the Ontario Heritage Act, the Provincial Policy Statement, and the Environmental Assessment Act. The report and its three addendums (August 2012, December 2012 and September 2013) identified 76 80 structures (45 houses and 31 35 barns) as greater than 40 years old within the Project Study Area and as having general historical interest as they contribute to the character of the vernacular rural landscape. When applying the criteria set out in Ontario Regulation 9/06, none of these structures were determined to have cultural heritage value or interest. This The third heritage assessment addendum report was submitted to the MTCS for review and comment on September 6, 2013. Sign-off from the Ministry confirming that the report is satisfactory was received on September 11, 2013.

Section 6.2 / page 17 Sign-off from the MNR confirming that the report is satisfactory was received on March 28, 2012. Sign-off from the MNR confirming that the report is satisfactory was received on March 28, 2012. AECOM later prepared a Natural Heritage Assessment and Environmental Impact Study Report Amendment in order to fulfill the requirements of the REA process and O. Reg. 359/09 with respect to modifications to the Project Location proposed after the original submission of the NHA and EIS to MNR. The MNR issued a re-confirmation letter for the NHA Amendment on January 11, 2013. A second NHA Amendment was submitted to the MNR on August 29, 2013 to address additional modifications to the Project proposed after MNR confirmation and re-confirmation of the NHA and first NHA Amendment.

Table 6-1 / page 17 Features treated as significant for the purpose of this submission (a determination as to whether the mitigation measures described in the EIS will be applied will be made based on the outcome of evaluation of significance studies to be completed prior to construction): Reptile hibernacula (RH-01 and RH-02); Bat maternity colonies (BMC-02, BMC-03, BMC-10, BMC-12, BMC-14, and BMC-15); Amphibian woodland breeding habitat (AWO-03, AWO-04, AWO-05, AWO-06, AWO-08 and AWO-12); and Amphibian wetland breeding habitat (AWE-01).

Features treated as significant for the purpose of this submission (a determination as to whether the mitigation measures described in the EIS will be applied will be made based on the outcome of evaluation of significance studies to be completed prior to construction): Reptile hibernacula (RH-01 and RH-02); Bat maternity colonies (BMC-02, BMC-03, BMC-10, BMC-12, BMC-14, and BMC-15); Amphibian woodland breeding habitat (AWO-03, AWO-04, AWO-05, AWO-06, AWO-08 and AWO-12 AWO-13); and Amphibian wetland breeding habitat (AWE-01).

Table 6-1 / page 17 The following candidate significant wildlife habitats were identified within the 120 m Area of Investigation however not within 120 m of qualifying project infrastructure, and were therefore carried forward to the EIS as Generalized Candidate Significant Wildlife Habitat: Reptile hibernacula (Natural Area 541); Bat maternity roosts (Natural Areas 426, 439, 456, 475, 487, 488, 494, 512, 514, 520, 539, 545, 551, 552, 555, 556 and 561); Amphibian woodland breeding habitat (Natural Areas 450, 463, 483, 510, 534, and 541); Amphibian wetland breeding habitat (Natural Areas 494, 564 and 565); Old growth and mature forest stands (Natural Areas 456, 483, 487, 510, 514, 541 and 542); Woodland raptor nesting habitat (Woodland Unit N); Seeps and springs (Natural Areas 437, 439, 463, 510, 518, 532, 534, and 539); Marsh bird breeding habitat (Natural Area 495); and Habitats of species of conservation concern (numerous).

The following candidate significant wildlife habitats were identified within the 120 m Area of Investigation however not within 120 m of qualifying project infrastructure, and were therefore carried forward to the EIS as Generalized Candidate Significant Wildlife Habitat: Reptile hibernacula (Natural Area 541); Bat maternity roosts (Natural Areas 426, 439, 456, 475, 487, 488, 494, 512, 514, 520, 539, 545, 551, 552, 555, 556 and 561); Amphibian woodland breeding habitat (Natural Areas 450, 463, 483, 510, 534, and 541); Amphibian wetland breeding habitat (Natural Areas 494, 564 and 565); Old growth and mature forest stands (Natural Areas 456, 483, 487, 510, 514, 541 and 542); Woodland raptor nesting habitat (Woodland Unit N); Seeps and springs (Natural Areas 437, 439, 463, 510, 518, 532, 534, and 539); Marsh bird breeding habitat (Natural Area 495); and Habitats of species of conservation concern (numerous).

Section 6.2.1 / page 18 Potential effects from operational and maintenance activities on Significant Wildlife Habitat, Significant Woodlands, Significant Valleylands, and Provincially Significant Wetlands include:

Bats may be disturbed by noise from operations (Features BMC-01, BMC-07, BMC-08, BMC-13 BMC-02, BMC-03, BMC-10, BMC-12 and BMC-14);

No anticipated operational effects to amphibian woodland breeding habitat (Features AWO-03, AWO-04, AWO-05, AWO-06, AWO-08, AWO-11 and AWO-12) although potential exists for amphibian mortality due to vehicular collisions along nearby access roads during operations; and

Potential effects from operational and maintenance activities on Significant Wildlife Habitat, Significant Woodlands, Significant Valleylands, and Provincially Significant Wetlands include:

Bats may be disturbed by noise from operations (Features BMC-01, BMC-07, BMC-08, BMC-13 BMC-02, BMC-03, BMC-10, BMC-12 and BMC-14);

No anticipated operational effects to amphibian woodland breeding habitat (Features AWO-03, AWO-04, AWO-05, AWO-06, AWO-08, AWO-11 and AWO-12 AWO-13) although potential exists for amphibian mortality due to vehicular collisions along nearby access roads during operations; and

Table 6-2 / page 19 Potential Effect Bats may be disturbed by noise from operation (BMC-01, BMC-07, BMC-08, BMC-13, BMC-02, BMC-03, BMC-10, BMC-12 and BMC-14). Monitoring Plan and Contingency Measures

Conduct 3 years of post-construction acoustic monitoring for Features BMC-03, BMC-02, BMC-10, BMC-12, BMC-14 where located within 30 m of construction activities according to protocol described for pre-construction survey (as described in July 2011 version of Bats and Bat Habitats: Guidelines for Wind Power Projects) including:

Potential Effect Bats may be disturbed by noise from operation (BMC-01, BMC-07, BMC-08, BMC-13, BMC-02, BMC-03, BMC-10, BMC-12 and BMC-14). Monitoring Plan and Contingency Measures Conduct 3 years of post-construction acoustic monitoring for Features BMC-03, BMC-02, BMC-10, BMC-12, BMC-14 BMC-15 where located

within 30 m of construction activities according to protocol described for pre-construction survey (as described in July 2011 version of Bats and Bat Habitats: Guidelines for Wind Power Projects) including:

Table 6-2 / page 20 Potential Effect

Absence of confirmed significant cavity trees or other suitable, but not studied, cavity trees removed during construction of access road within Bat Potential Effect

Absence of confirmed significant cavity trees or other suitable, but not studied, cavity trees removed during construction of an access road the

Page 9: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 7

Table 3-1 Edits to the Design and Operations Report

Section / Page Original Text* Revised Text* (underlined text represents additions and strikethrough text represents deletions)

Maternity Colony (BMC-15). Mitigation Strategy

For each suitable cavity tree to be removed, a bat house will be installed in the closest suitable woodland habitat (the remainder of the woodland for the affected habitat).

Details of bat box construction and placement will be provided to MNR for approval prior to installation. If a significant maternity colony must be removed, timing, location, and bat house design will be of utmost importance for the colony to

successfully re-establish, and will be discussed with the MNR. Monitoring Plan and Contingency Measures

Conduct 3 years of post-construction monitoring of any bat boxes installed by a qualified Biologist, to determine the success of the implemented mitigation measures.

Conduct 3 years of post-construction monitoring of all remaining cavity trees within BMC-15 (if determined to be significant) following pre-construction survey methods, as described in July 2011 version of Bats and Bat Habitats: Guidelines for Wind Power Projects by a qualified Biologist, including: Conduct monitoring of roost trees through exit surveys through June. Conduct active visual and acoustic monitoring at the cavity opening or crevice from 30 minutes before dusk until 60 minutes after dusk

in June. Contingency Measures If significant declines or disappearance of species is detected, determine whether likely to have been caused by the project. If so,

corrective measures will be taken, to be determined through consultation with MNR.

transmission line within Bat Maternity Colony (BMC-15). Mitigation Strategy

For each suitable cavity tree to be removed, a bat house will be installed in the closest suitable woodland habitat (the remainder of the woodland for the affected habitat).

Details of bat box construction and placement will be provided to MNR for approval prior to installation. If a significant maternity colony must be removed, timing, location, and bat house design will be of utmost importance for the colony to

successfully re-establish, and will be discussed with the MNR. Clusters of cavity trees (4 cavity trees/ 12.6 m radius of habitat) will not be removed as a result of their high value as maternity roost sites. If

this is not possible, MNR will be consulted regarding mitigation measures that may be required. Monitoring Plan and Contingency Measures

Conduct 3 years of post-construction monitoring of any bat boxes installed by a qualified Biologist, to determine the success of the implemented mitigation measures.

Conduct 3 years of post-construction monitoring of all remaining cavity trees within BMC-15 (if determined to be significant) following pre-construction survey methods, as described in July 2011 version of Bats and Bat Habitats: Guidelines for Wind Power Projects by a qualified Biologist, including: Conduct monitoring of roost trees through exit surveys through June. Conduct active visual and acoustic monitoring at the cavity opening or crevice from 30 minutes before dusk until 60 minutes after dusk

in June. Contingency Measures

If significant declines or disappearance of species is detected, determine whether likely to have been caused by the project. If so, corrective measures will be taken, to be determined through consultation with MNR.

Table 6-2 / page 20 Mitigation Strategy

Perform maintenance operations such as vegetation clearing outside the breeding season of May 1 to July 31. If vegetation clearing takes place during this timing window, nest searches will be conducted by qualified Biologist.

Mitigation Strategy

Perform maintenance operations such as vegetation clearing outside the breeding season of May 1 to July 31. If vegetation clearing takes place during this timing window, nest searches will be conducted by qualified Biologist.

Schedule maintenance operations such as vegetation clearing to occur outside the breeding season of May 1 to July 31. Table 6-2 / page 20 Mitigation Strategy

Vegetation clearing will take place outside the breeding season of May 1 to July 31. If vegetation clearing takes place during this timing window, nest searches will be conducted by qualified Biologist.

Mitigation Strategy

Vegetation clearing will take place outside the breeding season of May 1 to July 31. If vegetation clearing takes place during this timing window, nest searches will be conducted by qualified Biologist. Schedule maintenance operations such as vegetation clearing to occur outside the breeding season of May 1 to July 31.

Table 6-2 / page 21 Potential Effect

Loss of forest cover (up to 0.5 ha) through vegetation clearing in Significant Woodlands due to transmission line establishment. Potential Effect

Loss of forest cover (up to 0.5 ha) through vegetation clearing in Significant Woodlands AJ, AO and AP due to transmission line establishment. Table 6-2 / page 21 Potential Effect

Clearing of vegetation for maintenance of the transmission line, resulting in accidental damage to Significant Woodlands Potential Effect

Clearing of vegetation for maintenance of the transmission line, resulting in accidental damage to Significant Woodlands AJ, AO and AP. Section 6.3.1.1 / page 22 High Sensitivity:

C35 (Project Component: Turbine). High Sensitivity: C35 (Project Component: Turbine). C10-A (Project Component: Collection Line)

Section 6.7 / page 29 There are three authorized aggregate resources located within the Project Study Area. The first aggregate resource is a 36 ha site owned by Huron County and has a Class A Licence for over 20,000 tonnes. This is located 1,510 m from the nearest Project infrastructure (access road to Turbine 33). The second aggregate resource is a 19 ha site owned by G. Heard Construction Limited and has a Class B Licence for 20,000 tonnes or less. This is located 402 m from the nearest Project infrastructure (access road to Turbine 7). The third aggregate resource is a 4 ha Class B site licensed to Donald G. Heard, but has since been surrendered. This is located 242 m from the nearest Project infrastructure (transmission line).

There are three authorized aggregate resources located within the Project Study Area. The first aggregate resource is a 36 ha site owned by Huron County and has a Class A Licence for over 20,000 tonnes. This is located 1,510 m from the nearest Project infrastructure (access road to Turbine 33). The second aggregate resource is a 19 ha site owned by G. Heard Construction Limited and has a Class B Licence for 20,000 tonnes or less. This is located 402 m from the nearest Project infrastructure (access road to Turbine 7). The third aggregate resource is a 4 ha Class B site licensed to Donald G. Heard, but has since been surrendered. This is located 242 m from the nearest Project infrastructure (transmission line). The third aggregate resource is a 19 ha site owned by G. Heard Construction Limited. This is an active authorized aggregate resource with a Class B License for 20,000 tonnes or less and is located adjacent to the proposed access road to Turbine 7 along Crystal Springs Road. As the resource is situated to the north of the road allowance (Crystal Springs Road), and the access road is proposed to constructed running north to south on the south side of the road allowance, no effects as a result of operational activities are anticipated.

Appendix A Section 4 / page 2

In the event of a transformer failure, a spare transformer will be installed at the same location as that presented in the Noise Impact Assessment. The proposed spare transformer will be a Prolec GE 102/136/170 MVA transformer. The Bluewater Wind Energy Centre Noise Impact Assessment was conducted using a Prolec GE 51/65/85 MVA transformer. While this transformer is smaller in capacity and geometry, the proposed spare transformer will have lower noise emissions than the approved transformer in the Noise Impact Assessment Report. As illustrated in the table below, the overall noise emissions (overall Sound Power level) of the proposed spare transformer to be stored at the Jericho Wind Energy Centre are less than those from the Bluewater transformer.

Transformer Sound Power1 (dBA)

Octave Band Centre Frequency (Hz)

31.5 63 125 250 500 1000 2000 4000 8000 Overall (dBA)

Page 10: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 8

Table 3-1 Edits to the Design and Operations Report

Section / Page Original Text* Revised Text* (underlined text represents additions and strikethrough text represents deletions)

Bluewater Transformer 62.0 81.2 93.3 95.8 101.2 98.4 94.6 89.4 80.3 104.8 Spare Transformer 61.0 80.2 92.3 94.8 100.2 97.4 93.6 88.4 79.3 103.8

1. Transformer Sound Power includes 5 dB tonal penalty.

Note: * Italics denotes changes from the Addendum to the Design and Operations Report – Bluewater Wind Energy Centre (AECOM, March 2013)

Page 11: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

AECOM Varna Wind, Inc. Amendment to the Design and Operations Report – Bluewater Wind Energy Centre

07ra_2013-10-08_BLW Amendment-Design & Operations_60301207 9

4. Summary and Conclusions

The Project modifications described in this REA Amendment do not change the overall conclusion of the Design and Operations Report which states that “this Project can be operated without any significant adverse residual effects. Post-construction monitoring related to effects on wildlife, including birds and bats, will be undertaken to confirm this conclusion”.

Page 12: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

07rb_2013-09-27_App Tps_60301207.Docx

Appendix A

Project Modifications

Page 13: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(A1

A2

Goshen L ine

Bronson Line

Mil l RdCrysta l Spr ings Rd

Blue Bluff Rd

7

8

921

2210

19

446000

446000

448000

448000

4820

000

4820

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1A

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 14: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

B2

B1

Pavil lion Rd

Parr Line

Goshen L ine

Babylon Line

32

34

41

33

23

21

22

38

448000

448000

450000

450000

452000

452000

4818

000

4818

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1B

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 15: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(C1

C2

Centennial Rd

Goshen L ine

Bronson Line

1

2

26

24

14

13

15

25

23

12

446000

446000

448000

448000

4816

000

4816

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1C

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 16: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(D3

D1

D2

Staffa Rd

Kippen Rd

Goshen L ine

Bronson Line

Blackbush Line

5

3

4

16

40

27

17

18

446000

446000

448000

448000

4812

000

4812

000

4814

000

4814

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1D

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 17: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(E5

E4

E3

E2

E1

B2

Staffa Rd

Centennial Rd

Parr Line

Babylon Line

Bannockburn L ine

Conc 5 Rd

37

36

35

39

34

41

23

450000

450000

452000

452000

454000

454000

4816

000

4816

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1E

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 18: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(!(

!(

!(

!(F1

F3

F2Centennial Rd

London Rd

Airpor t Line

Gulley L ine

Bannockburn L ine

Sta ffa Rd

Smirnoff L ine

456000

456000

458000

458000

4816

000

4816

000

4818

000

4818

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1F

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:14,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 19: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(!(G4

G2

G3

G1

Staffa Rd

Division L ine

Morrison Line

Kippen

Rd

Centennial Rd

Hannah

L ine

Centennial Rd

460000

460000

462000

462000

464000

464000

4816

000

4816

000

4818

000

4818

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1G

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:14,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 20: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(

!(

!(H4

H2

G4

H3

H1

Ti le Rd

Hensal

l Rd

Kippen

Rd

Centennial Rd

Perth 1

83 Rd

28 Line

466000

466000

468000

468000

4816

000

4816

000

4818

000

4818

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1H

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 21: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

Path: F:\GIS \Nextera\GIS Spatia l\MX Ds\ReportM XDs\Change_repor t\BLU_ChangeReport_Outputs \60155032_B LW_LayoutChangesOverviewZoom_20130808.mx d

!(

!(

!(I2I1

Hensal

l Rd

Huron Rd

Front Rd

Kippen

Rd

Bi rch St

Perth 1

83 Rd

Main St

S

Stanley Rd

Mil l Rd

Rai lway St

Si lls S

t

Albert

St

Water S

t

Chalk S

t S

Brantford St

Wil liam St

Goderich St E

Colem

an St

Jarvis

St S

Victoria St

Front St W

Huron St

Front St E

Daly St

Bayfie ld St E

Oak St

High S

t

Fai rway Rd

Isabel

la St

Nor th St

Crombie St

Centre St

Bayfie ld St W

Third St

Lloyd Eisler St

Spar lin

g St

Second St

Georg

e St S

First StVan

Egmond

St

St. Patr icks StRa

ilway

St

Front Rd

Wil liam St

Victori

a St

468000

468000

470000

470000

4820

000

4820

000

4822

000

4822

000

LegendTransm iss ion L ine S tudy Ar eaWind E nergy Centr e Study A reaProperties

Januar y 2013 - 120m Ar ea of Inves tigationTu rb in es an d P erman en t M eterological Tow er!( Added!( Rem ov ed!( No Change

Layo ut M odif icat ion (Type, S tatus)Col lec tion L ine, AddedRoad, AddedCol lec tion L ine, Rem ov edRoad, Rem ov edCol lec tion L ine, No ChangeAc cess Road, No ChangeTransm iss ion L ine, No Change

Mo dification t o Disturbance AreasStatus

AddedRem ovedNo Change

Lay out Modification LocationsA1(August 2013 - 120m Ar ea of Inves tigation

UT M Zone 17N, NAD 83

Project Location

Figure 1I

Se ptember 2013Project 6015503 2

Bluewater Wind Energy CentreREA Amend ment

Thi s drawing has been prepared for the use of AECOM's c lient and m ay not be used, reproduced or relied upon by third part ies,except as agreed by AECOM and it s cl ient , as required by law or for use by governmental reviewing agenci es. AECOM accepts no responsibilit y, and denies any li abil ity whatsoever, to any partythat m odi fies this drawing without AECOM's express writ ten consent.

1:13,000

Pro du ce d b y AEC OM un d er lic en ce fr o m O nt ar io M inis tr y of Na tu r al Re so ur ce s, Co p yrig h t © Q ue e ns Pr int er 2 0 13

²

Page 22: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

07rb_2013-09-27_App Tps_60301207.Docx

Appendix B

Amended Figures for the Design and Operations Report

Page 23: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

&<&<

&<

&<&<

&<

&<

&<

&<&<&<

&< &<

&<&< &<

&< &<

&<

&<

&<&<

&< &<&<

&<

&<&< &<

&<&<

&<

&<&<

&< &<

&<

&<

&<

&<&<&<

&<&< &<&< &<&<

&<&<

&<

&< &<&< &< &<&<

&<&< &<

&<

&< &< &<&<

&<&< &<

&< &< &<

&<&< &<&<

&<&<&< &<&<&<

&<&< &<&< &< &<&< &< &< &< &<&< &<&<&<&< &<&<&<

&< &< &<&< &<&<&<

&< &<&< &<&<

&< &<&<&<

&< &<&< &<&< &<&<

&< &< &< &<&< &< &< &<&< &<

&<&<&< &<&<

&<&< &<&< &<

&<&< &< &<&<

&< &<&<

&< &< &<&< &< &<

&<&< &< &<&<&<&< &< &<&< &<

&< &<&<

&<&< &< &<&<

&<

&<

&< &< &<

&<

&< &<&< &<&< &<&< &<&<

&<&< &<

&<&< &<&<

&<&<&< &<&<&<

&< &<&<

&<&< &<

&< &< &<&< &<&<

&< &<&<&< &<&<

&< &<&<&<

&<&<

&<

&<&<

&<

&<

&<

Staffa Rd

Parr Line

Kippen Rd

Hensa

ll Rd

London Rd

Airport L i ne

182 Rd

Mill Rd

Ce ntennial Rd

Morr is on Line

Bron son Lin ePe

rth 18

3 Rd

Ro gerv ill e Rd

Goshen Line

181 Rd

19 Line

Walnut Rd

21 Line

Ro man Rd

Til e Rd

Divis ion Li ne

Babyl on Line

Bell's L ine

26 Line

Zur ic h-hens all Rd

Bannockburn Line

Da ncela nd Rd

Hanna

h Line

Bluew

ater H

wy

Stone Rd

Shor t Horn Rd

Front Rd

Blind Line

Perth 24 L ine

Blackbush Line

Perth 17 Rd

Hu ron Rd

28 Line

Fansvi lle Li ne

Ch isel hurs t Rd

Oak Rd

Ausab le Line

Perth

180 R

d

Stanley Rd

King S t

Crys tal Sp ring s Rd

Conc 5 Rd

Pavi lli on Rd

Gulley Li ne

Kinbur

n Line

32 Line

Wildw

ood L

ine

Blue B luf f Rd

Hydro Line Rd

Mctaggar t L ine

Hu rondal e Rd

Main St

Bir ch St

Ha rpurhey Rd

Main St S

Main St

N

Mill St

James StMark et St

Elim vil le Line

Queen S t

Da vid S t E

Smirnoff L ine

Da vid S t

Goder ic h St E

Tower Line

Roxbo

ro Lin

e

Ra ilway St

Sills S

t

York St

Alber t St

Keith Cres

North

Line

Beda

rd Rd

Chalk

S t S

Ca mero n St

Wil liam S t

John St SJohn St N

Jer ry L ane

Hu ron S t

Spar l

ing S t

Lorne Ave

Ann S

t

Brock S t

Fr ont St W

Victor ia S t

Ellen St N

John St

Chalk

S t N

Oak St

East S t

Is abel

l a St

Ox fo rd St W

No rth St

Mill St W

Vienna S t

Ce ntre St

Parks

ide Av

e

Wels h St

Georg

e St S

John St

Goshen Line

Hu ron Rd

Pavi lli on Rd

Babylon Line

Fr ont RdBro

nson

Lin e

Main St

S

Ce ntennial Rd

Zur ic h-hens all Rd

Spar l

ing S t

L

NAL

Y

R

F

AQ

H

AM

Q

AK

AP

AJ

S

G

AO

AR

P

U

K

T

D

I

AE

AT

AA

AF

E

X

AH

M

O

Z

AB

AS

AD

A

AC

B

T5

C46 C32

C28

C13

C87

T6

C30

C71

C42

C11

T4

C19

T7

C41

T17

T2 T8

T3

T9

C6

T1

C56

C83

C40

T10

C22

C18

C72

C33

C34

C10

C54

C66

C52

C55

C27

C113

C36

C116

C88

C3

C25

C35

C115

C50

C51

P3

6

5

2

4

7

1

9

8

34

30

3637

26

16

32

11

27

22

18

31

19

17

10

38

20

39

35

24

14

29

33

41

28

15

13

23

25

40

12

21

5

7

1

8

9

6

4

2

32

16

26

37

36

30

11

35

39

24

29

14

34

28

41

33

13

15

25

23

12

21

27

22

17

38

18

31

19

S o u t h H u r o nS o u t h H u r o n

C26C26

C21

C20

C48

C7

C99

C44

C114C49

446000

446000

448000

448000

450000

450000

452000

452000

454000

454000

456000

456000

458000

458000

460000

460000

462000

462000

464000

464000

466000

466000

468000

468000

470000

470000

4808

000

4808

000

4810

000

4810

000

4812

000

4812

000

4814

000

4814

000

4816

000

4816

000

4818

000

4818

000

4820

000

4820

000

4822

000

4822

000

UTM Zone 17N, NAD 83

Project Location andNatural Heritage Features

September 2013Project 60155032

Bluewater Wind Energy Centre

1:32,000

Basemapping from Ontario Ministry of Natural Resources

0 500 1,000 1,500 2,000250Metres

This drawing has been prepared for the use of AECOM's client and may not be used, reproduced or relied upon by third parties,except as agreed by AECOM and its client, as required by law or for use by governmental reviewing agencies. AECOM accepts no responsibility, and denies any liability whatsoever, to any partythat modifies this drawing without AECOM's express written consent.

²

Figure 2-2

Path: F:\GIS\Nextera\GISSpatial\MXDs\ReportMXDs\D_O_ConstructionReport\Bluewater\REA_September2013\09162013_BLW_NaturalHeritageFeatures.mxd

LegendWind Energy Centre Study AreaTransmission Line Study AreaMunicipal DivisionProperty BoundaryRoads

!( Interconnection Point&< MOE Water Wells

Project Component !( GE Turbine

Collection LineAccess RoadTransmission LineLaydown YardSubstationConstruction Disturbance Area

Natural FeaturesWatercourseWaterbodyCartographic Wetland

Significant Features!(

Significant Wildlife Habitat Reptile Hibernacular

ValleylandWetlandsGeneralized Candidate Significant Wildlife Habitat

Significant Wildlife Habitat

Page 24: Amendment to the Design and Operations Report Bluewater Wind … · 2018. 6. 22. · Report – Bluewater Wind Energy Centre . 07ra_2013 -10-08_BLW Amendment-Design & Operations_60301207

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

kj

kj

")

")")

")

")")

#*")#*

#*#*#* ")") ")") ")")")

#* ")") #*#* #*") ")#* ")

#* #*#* ")#*")

")")#*

#*#*")")") ") ")")")

#* #* #*#* #*#* ") #*")") ")

#*")#*

") #*#*#*

")")")") ")") ")")") #* #*") #* ")#* ") #* ") ")") ")#*#* ")")#* ")") ")")")")")") ")#*")")#* ")#* ")")") ") ")") #*") ")#* ")") #*") ")")

#* #*#*") #* ") #*#* ")") #* #*#* #*")#* #*#* #*#*#* #*") #* #*

#* ")") ")

")#*#*

")#* #*") #* ")") #*") ")

")") #*#* #*")")

")")#*#*

")#*") ")") ")") ") #*

#*#*")") #* #*#* ") #*") #*") #*#* #*") #*")") ")") #*

")") ") ") #* #*")")")") ")")") ")

")#*#* #* ")#* #*#* #*") ")

") ")#* ")")") ")")

#*")")

")") #*#* ")") #* ")

")") #* #*") ")") #*")#*#* ") #*")#*#*") ")

") #* #*") #*") ")#*") ")#* ") ")")")")")

")#* ")")#* ")") ")#* ")#* #*")

#* #*") ")")")")") ")") ") #*") #*") ")#* ")

") ")#* ")")#* ")") #* ")") ")")")

")#*

")") ") ")") #*")#* ")")

")") #* #* #*#* #*") #*#*")

#*")") ")") ")") ")")#*") ")")")#* ")

") ")#*") #* #*")

")#*") #*") ") ")#*

#*")#* #*#*#* #*

")#* #*#*

") ")#*

")") ")#*#*")

") #*#*")

") ")")")#*")

")")") ")#*") ")#* ") ")#*#* #*#* ")")") ")") ") ")")#*")") ")") ")") ") #*") ")") ")")") ")")") ")")") ")")") ")")") ") ")") ")#* ")")") ")")")") ")")#* ")")") ")")") ") #*")")") ") #*")")#*#* #*") #*")#* #*")

")") ") #*") ")")")") #*#*") ")

#* #* ")#* #*") ")") ")

") ")")")#* ")#* ")#*") ")") ")#*#* ")#* ")#* ") #*")

#*#*#* ")

#* ")")") ")")#*

")#*#* #*

")#*") ")

#* ")")

#*

A

A

A

A

AA

A

A

AA

A

A

A

A

A

AA

A

A

A

A

A

A

A

A A

A

AA

A

A

A

A

A

A A

AA

A

AA

A

A

A

A

A

B

P3

Lake Huron

Lake Huron

5

7

3

1

8

9

6

4

2

32

16

26

3736

30

11

35

39

24

29

14

34

28

41

33

13

15

25

2312

40

21

27

22

17

10

38

18

31

19

S o u t h H u r o nS o u t h H u r o n

444000

444000

446000

446000

448000

448000

450000

450000

452000

452000

454000

454000

456000

456000

458000

458000

460000

460000

462000

462000

464000

464000

466000

466000

468000

468000

470000

470000

472000

472000

4806

000

4806

000

4808

000

4808

000

4810

000

4810

000

4812

000

4812

000

4814

000

4814

000

4816

000

4816

000

4818

000

4818

000

4820

000

4820

000

4822

000

4822

000

4824

000

4824

000

UTM Zone 17N, NAD 83

Project Location andSocio-Economic Features

October 2013Project 60155032

Bluewater Wind Energy Centre

1:35,000

Basemapping from Ontario Ministry of Natural Resources

0 500 1,000 1,500 2,000250Metres

This drawing has been prepared for the use of AECOM's client and may not be used, reproduced or relied upon by third parties,except as agreed by AECOM and its client, as required by law or for use by governmental reviewing agencies. AECOM accepts no responsibility, and denies any liability whatsoever, to any partythat modifies this drawing without AECOM's express written consent.

²

Figure 2-3

Path: F:\GIS\Nextera\GISSpatial\MXDs\ReportMXDs\D_O_ConstructionReport\Bluewater\REA_September2013\09172013_BLW_SocioeconomicFeatures.mxd

LegendWind Energy Centre Study AreaTransmission Line Study AreaMunicipal Division120 m Area of Investigation 60 m Road/Rail Buffer 80 m Property Boundary Buffer550 m Noise Receptor Buffer500 m Substation Footprint Buffer 75 m Petroleum Resources Buffer2 km Boundary from Project LocationExpressway / HighwayMajor RoadLocal Road

_̂ Zurich Wind Farm@A Petroleum Wellkj Meterological Tower") Participating Receptor") Non-participating Receptor#* Vacant Lot Participating Receptor#* Vacant Lot Non-participating Receptor!( Interconnection Point

Project Location!( GE Turbine

Access RoadCollection LineTransmission LineDisturbance AreaSubstationLaydown Yard

Natural FeaturesWatercourseWaterbodyCartographic WetlandWoodlots

")

#*#* ")")

") ")") ")")#*")") ") ")") ") #*") ")") ")") ") ")")") ")")") ")")") ")")") ") ")

") ")") ")") ")") ")")#* ")")") ")")

")") #*")") ") #*")

")#*

#*")

#*#*

#*

#*

#*

499500

488484

513

512

506

501498

496493492

491490 487 486485

483

482481

480

479478477

475474

473 472467466

465464463

461

460

459 458457

456455

454

453452450 449

446

445444443 442

440439 438

437436

435

434 432431430

429428 427

423

476469

462451

448

447

Mill Rd

Parr L

ine

A

")

") ")#* ") ")

")") ")") ") ")")")

#*")

")#* #*

")")") ")

")

98979695

9493 92908987 868583

114112110109 108 106104103

102101100

Kippen Rd

Bronson Line

B