Integrated Project ExecutionMarc-Henri J. CerarISEIT Conference - Oct. 24th, 2006

Page 2: AMEC IPE Solution_ISEIT 2006

15/04/23 2

What Is IPE, and What Is The AMEC Solution

Integrated Project Execution

Page 3: AMEC IPE Solution_ISEIT 2006

15/04/23 3

What Is IPE ?

An environment which……enables the collaboration…of all parties…and all applications…involved in an EPC project…executed from multiple locations…safely, efficiently and effectively

Page 4: AMEC IPE Solution_ISEIT 2006

15/04/23 4

Challenges of a Design Project

The design model must reflect reality (what is to be built)

Document changes must be controlled

Changes in one document must be reflected in all documents

Information must be readily available to all

The pieces must fit together when fabricated

Page 5: AMEC IPE Solution_ISEIT 2006

15/04/23 5

The design model must reflect reality (What is to be built)• Design model must be dynamically linked to P&IDs and procurement

Document changes must be controlled• Electronic approvals required for revisions

Changes in one document must be reflected in all documents• Documents, models and other engineering deliverables must be

linked and “red flagged” when a change is made Information must be readily available to all

• Internet access required• Documents must be linked for quick reference

The pieces must fit together when fabricated• Design model must include everything (actual structure, pipe

supports, cable trays, realistic valves and controls)

Solutions to Design Challenges

Page 6: AMEC IPE Solution_ISEIT 2006

15/04/23 6

Integrated Project Execution

IPE Common Industry Practices Trained staff using a common work

process

Each project organized differently

Smart P&IDs linked to 3-D Model,

engineering deliverables and

procurement & expediting databases

Separate stand alone databases and

spread sheets

Automatic consistency check between

P&ID, procurement and 3-D Model

Not possible

Electronic control requiring approvals for

issuing revisions

Manual approvals based on signature

block. Revisions can be issued without

proper sign-off

Latest revision automatically available on

electronic document management

system

Manual check necessary to assure the

paper document being used is latest

issue. Not possible to assure destruction

of all out of date documents.

Page 7: AMEC IPE Solution_ISEIT 2006

15/04/23 7

IPE Common Industry Practices Historical tracking of drafts and

revisions Manual tracking possible only if old

copies kept and everyone manually records each change made

All changes “red flagged” on all other effected documents

Not possible

All documents searchable and cross-referenced by metadata (e.g. tag number, PO, line number, etc.)

Not possible

Design done in 3-D Model. Drawings printed from 3-D Model

Model built from 2-D drawings

3-D Model includes all pipe, pipe supports, cable trays and controls

Model includes major pipe

3-D Model includes proper coping of structural joints

Structural members carried to centerline of joint

All data shared over Internet Not possible

Integrated Project Execution (cont.)

Page 8: AMEC IPE Solution_ISEIT 2006

15/04/23 8

Improved quality– Change is minimized, and managed

Reduced time scales– Faster deliverable production

– Plant on-site sooner

Minimized risk– Plant delivered on schedule and to budget

Removal of uncertainty– Visibility of all data to whole project team

Integrated Project Execution Benefits

Page 9: AMEC IPE Solution_ISEIT 2006

15/04/23 9

Benefits to Projects­ Reliable and repeatable work processes­ Common technical database across multiple projects areas,

eliminating duplicated effort & producing consistent results­ Common configuration across multiple projects, resulting in

consistent design and execution­ Consistent basis for progress tracking & reporting­ Improved quality management­ Improvements in communication and collaborative work

effort between multiple work sites­ Consistent material requisitions, awards and tracking of

procured equipment and material ­ Quicker and more consistent conveyance and storage of

deliverables and other project documents

Integrated Project Execution Benefits

Page 10: AMEC IPE Solution_ISEIT 2006

15/04/23 10

The AMEC Paragon Solution forIntegrated Project Execution

Page 11: AMEC IPE Solution_ISEIT 2006

15/04/23 11

However fit-for-purpose our skills may be, in the end, we are AMEC Paragon an Engineering company and not a Software Development company.

We look to Aveva, FileNet, and others to provide architectural features that allow us to configure, not custom-build, a core application framework supporting our business process requirements.

We require an extremely flexible and powerful architecture that supports all of our requirements and frees us to focus on the bigger picture – data integration and work process integration – that provides even greater ROI to our organization.

Business Motivators

Page 12: AMEC IPE Solution_ISEIT 2006

15/04/23 12

Entering data once

Interconnection of databases

P&ID Creation

Engineering Database Development

3D Model Design

Integrated Project Execution

Page 13: AMEC IPE Solution_ISEIT 2006

15/04/23 13

IPE Covers All Processes

CommissioningConstructionProcurementEngineeringPrimary

Processes

Materials Management

Document Management

Project Management

SupportingProcesses

Planning

Progress Management

Cost Management

ProjectControls

Page 14: AMEC IPE Solution_ISEIT 2006

15/04/23 14

Data Access and Collaboration

Project Management

Materials Management

Project Controls

ConstructionProcurementEngineeringRequirements

EngineeringLayout

EngineeringDesign

AMEC Solutions For IPE

AVEVA VPDAVEVA VPE AVEVA VPRM

Planning Design Progress Cost Management

P&IDsD

ata

Man

agem

ent

Process

Mechanical

Piping

Instruments

Electrical

Multi-Discipline3D Modelling

2D / 3D Integrity

Design Document Control(Planning, Distribution, Production Monitoring)

PipingSpecifications

BulkMaterial Take Off

RequisitionProduction

Vendor Documents(Planning, Distribution, Monitoring)

Expediting

Inspection

Shipping

Buying

Convero

FileNet

ORBISS

Document Vault

ConstructionPlanning

InventoryControl

ConstructionProgress & QA

Commissioning

3D ModelReview

Full Reporting of All Project Activities

Planning and Monitoring

Primavera

WinPCSVPIDVPE ProcessVPE MechanicalVPE PipingVPE InstrumentsVPE Electrical

PDMSPipe support appl.Clash ManagerDeliverable ManagerModel Object ManagerConn. Manager

Implant/ExplantStressCGlobalHazmapLaser Model InterfaceReview Reality/LE

Page 15: AMEC IPE Solution_ISEIT 2006

15/04/23

VPID

VPE

ENGINEERINGANALSIS

VPRM

FILENET

VPDPDMS

DATA

DOCUMENTS

AMEC Solutions For IPE

Page 16: AMEC IPE Solution_ISEIT 2006

15/04/23

MAT’LREQS

PURCHORDERS

VENDORDOCS

MAT’LSPECS

PIPEWORKS

E /IRACEWAY

MECH

INSTR

ELECT

PROCESS

VPDGLOBAL

VPDROUTER

MODELOBJECT

MGR

CEASARII ETAP

HYSYS

SACS

STRUCT.

VPID

VPE

ENGINEERINGANALYSIS

VPRM

FILENET

VPDPDMS

DATA

DOCUMENTS

AMEC Solutions For IPE

Page 17: AMEC IPE Solution_ISEIT 2006

15/04/23 17

Construction

QA/QC

Project Controls

ProcurementScope Definition

Engineering/Design

Project Definition

Execution Strategy

HSE

Procedural RequirementsReporting Requirements

Monitoring Frequency

Project SynopsisScope of SupplyAdministrationOrganizationCommercial

Risk Mitigation

BudgetSchedule

Earned Value BaselineResource Loading

ReportingChange Management

Basis of DesignDeliverables Definition

Operability

ConstructabilityLogistics

Commissioning

RFQ PackagesSubcontracting Strategy

T&C’s DefinitionMaterial Control

Vendor Data

IPE Enables Communication & Sharing

Page 18: AMEC IPE Solution_ISEIT 2006

15/04/23 18

VPID & VPE Implementationby AMEC Paragon

Page 19: AMEC IPE Solution_ISEIT 2006

15/04/23 19

Comparator

Model Object Manager

VPD

P&ID’s

ExcelSpecification

Sheets

Reports

BusinessObjects Reports

ASPECTAssistant Drawings

VPE Workbench

VANTAGE P&ID

VANTAGE P&ID

DeliverableDeliverables

Programs

Data Transfer

Between programs

Data Mapper

(spreadsheetdata)

Excel

How Vantage Programs Work Together

Page 20: AMEC IPE Solution_ISEIT 2006

15/04/23 20

VANTAGE P&ID

VPE Workbench

Plant Connectivity Manager(PCM)

PCM Tables

Primary Load

Tables

ResolveTables

Engineering Tables

Engineering Modules

InstrumentProcessPipingElectricalMechanical

Issue for Engineering

InstrumentsEquipmentLinesReview Resolve and

Load Reports

CorrectErrors or incorporate changeson P&ID

Incorporate Engineering Design Changes

Validate P&IDs / Save Data to VPE

Page 21: AMEC IPE Solution_ISEIT 2006

15/04/23 21

Preliminary P&ID’s• “Non-intelligent”

Preliminary P&IDs must be re-created using VANTAGE P&ID

Preliminary P&ID’s• “Non-intelligent”

Preliminary P&IDs must be re-created using VANTAGE P&ID

VANTAGE P&ID INPUT

• EQUIPMENT TAGS• LINE TAGS• INSTRUMENT TAGS

VANTAGE P&ID INPUT

• EQUIPMENT TAGS• LINE TAGS• INSTRUMENT TAGS

VPE WORKBENCH

VPE WORKBENCH

VANTAGEP&IDS

VANTAGEP&IDS

DELIVERABLES• CONTROL LOOPS• EQUIPMENT SPECS• INSTRUMENT SPECS• MECHANICAL SPECS• MOTOR SCHEMATICS• ONE LINE DIAGRAM

DELIVERABLES• CONTROL LOOPS• EQUIPMENT SPECS• INSTRUMENT SPECS• MECHANICAL SPECS• MOTOR SCHEMATICS• ONE LINE DIAGRAM

EXTRACTED FILES• INSTRUMENT INDEX• CABLE SCHEDULES• BOB Reports• VPRM• CABLE Tray Routes

EXTRACTED FILES• INSTRUMENT INDEX• CABLE SCHEDULES• BOB Reports• VPRM• CABLE Tray Routes

DATA SCREENS• PROCESS• INSTRUMENT• ELECTRICAL• PIPING• MECHANICAL• ADMIN

DATA SCREENS• PROCESS• INSTRUMENT• ELECTRICAL• PIPING• MECHANICAL• ADMIN

VPDDESIGN

VPDDESIGN

Vantage Workflow

Page 22: AMEC IPE Solution_ISEIT 2006

15/04/23 22

P&ID’s are the Master Documents for Line, Equipment

and Instrument Data.If there are any changes to data loaded from

VANTAGE P&ID, the P&ID’s must be changed and

then reloaded into VPE Workbench.VANTAGE P&ID loaded data can not be changed

within the VPE Workbench program.

Vantage Workflow

Page 23: AMEC IPE Solution_ISEIT 2006

15/04/23 23

VPRM Implementationby AMEC Paragon

Page 24: AMEC IPE Solution_ISEIT 2006

15/04/23 24

EstimatingDatabase

VendorDatabase

VPRM Project Specific Capabilities

Specifications

MaterialTake-offs

Requisitions

Procurement

MaterialControl

ProjectAdministrati

on

Vendor DocumentationControl System

Project Controls

AutoCAD / PDMS / Vantage PE(Bulk and Engineered Equipment)

MaterialCatalog

VPRM Multi-Project Foundation

VPRM System Integration

FileNet(ElectronicDocument

ManagementSystem)

• PO Vendor Document Requirements

• Released Engineering Documents• Receipt Transmittals for Vendor Documents• Attachment of MR Engineering Documents

This is a key interface forIntegrated Project Execution

Page 25: AMEC IPE Solution_ISEIT 2006

15/04/23 25

VPRM Workflow

Page 26: AMEC IPE Solution_ISEIT 2006

15/04/23 26

VPRM Project Setup

Page 27: AMEC IPE Solution_ISEIT 2006

15/04/23 27

PDMS (VPD) Implementationby AMEC Paragon

Page 28: AMEC IPE Solution_ISEIT 2006

15/04/23 28

Increase Overall Efficiency

Must make good business sense– Cost effective customization

– Align with company’s future vision

Eliminate redundant work processes– Modeling begins and remains in PDMS

– Layout done in model

– Drawings remain in PDMS throughout project

Reduce design & draft man-hours– Automated modeling & drafting

– Minimize user input

– Fewer revisions

Page 29: AMEC IPE Solution_ISEIT 2006

15/04/23 29

Comparator

Model Object Manager

VPD

P&ID’s

ExcelSpecification

Sheets

Reports

BusinessObjects Reports

ASPECTAssistant Drawings

VPE Workbench

VANTAGE P&ID

VANTAGE P&ID

DeliverableDeliverables

Programs

Data Transfer

Between programs

Data Mapper

(spreadsheetdata)

Excel

How Vantage Programs Work Together

Page 30: AMEC IPE Solution_ISEIT 2006

15/04/23 30

Intelligent P&IDs coupled with Model Object Manager and VPE will save time during the entire project by tracking changes quickly and accurately.

PDMS Integration with P&IDs

Page 31: AMEC IPE Solution_ISEIT 2006

15/04/23 31

Increase User Productivity

Complete catalogs– Organize listings user sees– Limit user defined members– Address every condition

Reduce repetitive actions– Automate connections

– Reporter macros

User friendly modeling– Easy to use forms

– Minimum user input

Construction macros– Repetitive structures– Time consuming structures

Page 32: AMEC IPE Solution_ISEIT 2006

15/04/23 32

Enhance Model Content

Every element modeled accurately

Complete database information

Diverse reporting functionality

Methods to check accuracy of database

Page 33: AMEC IPE Solution_ISEIT 2006

15/04/23 33

Procurement Effort Due to high level of detail in the model, MTO of all materials can

be complete

Electronic Transfer of the Design Database to VPRM for procurement

Extremely Accurate MTO of all Materials to Fabricator

Increase Overall Efficiency

Page 34: AMEC IPE Solution_ISEIT 2006

15/04/23 34

FileNet Implementationby AMEC Paragon

Page 35: AMEC IPE Solution_ISEIT 2006

15/04/23

VPID

VPE

ENGINEERINGANALSIS

VPRM

FILENET

VPDPDMS

DATA

DOCUMENTS

FileNet Integration

Page 36: AMEC IPE Solution_ISEIT 2006

15/04/23

VPID

PDMS

VPE

VPRM

Equipment Data Valve InfoTag Numbering P&IDsPiping Line Info Eqpt & Line Sizing

Eqpt Arrangement Dwgs Piping LayoutsMaterial Take-offs Piping Isometrics Evacuation Routes Cable LayoutsConsistency Checking Clash Checking

Equipment List Raceway Details Eqpt Data Sheets Short Circuit AnalysisInstrument Index Cable DetailsInstrument Sizing Calcs

Document Tracking Progress ReportsPurchase Orders Expediting ReportsMaterial Control RequisitionsPipe Specifications

Project Start

Electronic Document Storage

OUTPUTSSYSTEMS

FILENET

Project End

TIMING

- Systems and their Outputs -

Project Deliverables Management

Page 37: AMEC IPE Solution_ISEIT 2006

15/04/23 37

Business DevelopmentProject Management

Financial & Admin

Engineering Systems

Fabrication/Construction

Operation & Maintenance

FileNet Document Vault

Clients

Vendors/Subcontractors

- Consumers of Documents -

Project Information Management

Page 38: AMEC IPE Solution_ISEIT 2006

15/04/23 38

Observed BenefitsUsing the AMEC Paragon Work Processes

Page 39: AMEC IPE Solution_ISEIT 2006

15/04/23 39

Intelligent P&ID Integrity and Validation to the Engineering Database

Major Equipment List, Line List and Other Reports Created from the Various Project’s Databases and Published “On-Demand” Through the Web

Engineering Creation of Requisitions in a Consistent and Repeatable Workflow

Efficiency of Procurement Effort due Consistent and Repeatable Workflow and Electronic Documentation

Tagged Items Registry Validated to the Engineering, Design and Procurement Databases.

100% Electronic Document Deliverables to Client with Indexing Attributes from the Engineering, Design and Procurement Databases.

Observed Benefits

Page 40: AMEC IPE Solution_ISEIT 2006

15/04/23 40

Thank you