Page 1: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

1

ALTERNATIVE APPROACHES TO WELL P&A

16th November 2016

Case Study

Page 2: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

2

Overview • Introduction to Petrofac Late Life Asset Management

& Decommissioning Solutions

• Horne & Wren: Rig-less NUI Well P&A

– Summary of Petrofac Well Engineering Work Scope for

Horne & Wren Wells P&A

– Review of Wells Project Performance and Recommendations

– Well P&A Activities vs Approach: What did we do and how?

– Who stole my derrick? Working without a derrick – what is different?

– Would we change our approach in the future? – What are the drivers for vessel selection?

• Alternative approaches to Well P&A in other projects

Page 3: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

3

New approaches Mature basins require new service sets and approaches; as the project phase evolves,

so too does the focus. Early engagement is key to optimising the planning and execution of

decommissioning services.

NORMAL OPERATIONS LATE LIFE ASSET

MANAGEMENT DECOMMISSIONING

ASSET LIFE CYCLE PHASE

DUTY HOLDER / OPERATIONS AND MAINTENANCE

WELL ENGINEERING / PLUG AND ABANDON

ENGINEERING / STUDIES

OPTIMISATION

PROJECT MANAGEMENT

SUPPLY CHAIN MANAGEMENT

VERIFICATION, TRAINING AND ER

SERVICE MODEL(S)

COP

DECONSTRUCTION HLV

MGT

Page 4: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

4

Late Life Asset Management and decommissioning services

DECOMMISSIONING

ENGINEERING

WELL ENGINEERING

OPTIMISATION VERIFICATION

PROJECT

MANAGEMENT

SUPPLY

CHAIN

MANAGEMENT

DECONSTRUCTION

HLV

MANAGEMENT

DISPOSAL

MANAGEMENT

STUDIES

DUTY HOLDER

OPERATIONS

AND

MAINTENANCE

LATE LIFE ASSET MANAGEMENT

PLUG AND

ABANDONMENT

Page 5: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

5

Track record

Currently providing:

• Duty Holder in Decommissioning,

BP Miller (UKCS)

• Asset management review,

Talisman Sinopec (UKCS)

• Duty Holder oversight, decommissioning,

Tullow Horne and Wren (UKCS)

• Late Life Asset Management (LLAM),

ENI Hewett (UKCS)

• Studies – various (confidential)

Previous projects:

• Well Plug and Abandon campaign,

Tullow Horne and Wren (UKCS)

• Hutton TLP topsides separation project,

Conoco (UKCS)

• AH001FPU decommissioning project,

Ithaca/Petrofac (UKCS)

• Bacton Gas Terminal decommissioning,

ENI (Onshore, UK)

• Decommissioning Cost Estimates,

multiple, confidential (Europe and Africa)

Page 6: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

6

HORNE & WREN: Rig-less NUI well P&A

Page 7: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

7

THOUGHT MOMENT… What seems simple from afar…

Page 8: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

8

IS NOT SO SIMPLE UP CLOSE … Challenges included:

• Multiple service requirement

• Congested decks

• No derrick

We addressed these challenges, met our objectives and delivered 58 incident-free days.

Page 9: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

9

WELLS WORK SCOPE & PERFORMANCE

Page 10: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

10

Petrofac well engineering work scope

Timeline

Page 11: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

11

WellAtlas®

Using our project delivery tool,

WellAtlas® we were able to drive

project schedule and efficiencies

through its ability to integrate 14

key project elements including:

• Plans

• Actions

• Risks

• Lessons learned

• Critical information

• Assurance reviews

• Approvals

Page 12: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

12

How did we do?

KPI TARGET / ACTUAL

LTI’s 0 / 0

Recordable Incidents 0 / 0

Spills 0 / 0

Loss of primary containment 0 / 0

Fines 0 / 0

7%

12%

81%

WoW

Non Productive Time

Productive Time

Accrued WOW 2%

Accrued NPT 26% (SNS offsets)

WHAT TOOK LONGER THAN PLANNED?

Waiting on Weather due to tall main crane boom height

(100m weather) and drive on currents preventing PSV work

Critical Path Scaffolding

Interface activities between barge and platform and platform

preparation

First Well Activities: Deep Plugs 44% time improvement on

Well 2

$2.5 M COST SAVED

Barge vs Rig: $1.4M USD saved after

additional barge productive time included

Casing removal with barge vs HLV: $0.65M

USD saved

Pre-RD&D activities as a SIMOP: $0.40M

USD

WELL P&A COST (GBP)

OGUK 2015* for SNS

Platform Wells

£3.0M –

£7.0M

Horne £2.9M**

Wren £3.5M**

* Oil & Gas UK Decommissioning Insight Report 2015: Average to Upper Range of Platform Well P&A costs for all Southern North Sea and Irish Sea Platform Wells

** Horne & Wren well costs are fully inclusive of all mob and demob and NPT for a two well campaign plus pre-RD&D activities

Page 13: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

13

Our performance

• EHS assurance role during the planning phase

• Good quality EHS and operations inductions for all personnel

• Good shared understanding of control of work tools and processes

• Prompt After Action Reviews and implementation of lessons and optimisations into the next wells activity

• Multi-discipline service company personnel

• Welllsite EHS Advisors: Positive energy reaching all crew members embedding the “one team” culture

– Leading on hazard hunt activities – excellent initiative and a fresh perspective that focussed the crews and supported enhanced HazOb system participation

– Leading on delivery of key EHS messages to the crew: Barrier policy, PPE, Platform POB management, Housekeeping

– Daily EHS Report focussed discussion on key topics at regular meetings

– Daily Permit Audits

• Leading & Lagging indicator tracking – Trend monitoring, provides focus to proactive efforts and able to identify key areas of EHS activity that are receiving less attention

• Regular visits by onshore management team to the location

Page 14: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

14

WELL P&A ACTIVITIES VS APPROACH How did we do it?

Page 15: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

15

Horne Well

Fluids • 5 ½” Tubing – Seawater

• A Ann – 9.5ppg Brine

• B Ann – 10 ppg OBM

Zones of Interest • Leman Sandstone

HC gas bearing normally pressured

• Bunter Sandstone

& Cretaceous Chalk

Water bearing normally pressured

Verification Plug 2: Single Barrier

• Cement Plug Tagged

(631ft MD barrier)

• Cement Plug Pressure Tested

(500psi above FG)

• Bridge plug tagged and pressure tested

• Annulus cement verified during construction

Plug 1: Combination Barrier

• Cement Plug Tagged

(860ft MD barrier)

• No losses during cementing

• Bridge plug tagged and pressure tested

• Annulus cement verified during construction

1,000ft

2,000ftTop at 2,033ft

3,000ft

Btm at 3,370ft

4,000ft

Top at 4,241ft

5,000ft

Btm at 5,320ft

6,000ft

Halite interbedded

with mud/s

Dolomite

7,000ft

8,000ftDolomite

Top at 8495ft

9,000ft

Btm at 9700ft

10,000ft

Cretaceous

Chalk

Perm

eab

le

Hyd

rocarb

on

s

Mudline Hanger

SystemMD BRT

(ft) Salt

Leman

Sandstone

Bunter

Sandstone

Before

1,000ft

2,000ft5 Top at 2,033ft

3,000ft

Btm at 3,370ft

4,000ft

Top at 4,241ft

5,000ft

Btm at 5,320ft

6,000ft

Halite interbedded

50 with mud/s

Dolomite

7,000ft

8,000ft

88 Dolomite

Top at 8495ft

9,000ft

Btm at 9700ft

90

10,000ft

Inclin

ati

on

(o)

Salt

Leman

Sandstone

Perm

eab

le

MD BRT

(ft) Hyd

rocarb

on

s

Cretaceous

Chalk

Bunter

Sandstone

After

Page 16: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

16

Wren Well

Zones of Interest • Leman Sandstone

HC gas bearing normally pressured

• Bunter Sandstone and

Cretaceous Chalk

Water bearing normally

pressured

Verification Plug 2: Single Barrier

• Cement Plug Tagged

(731ft MD barrier)

• Cement Plug Pressure Tested

(500psi above FG)

• Bridge plug tagged and pressure tested

• Annulus cement verified during construction

Plug 1: Combination Barrier • Cement Plug Pressure Tested

(1020ft MD barrier)

• No losses during cementing

• Bridge plug tagged NOT pressure tested

• Annulus cement verified during construction

1,000ft

2,000ft

Top at 2,140ft

3,000ft

4,000ft

Btm at 4,696ft

5,000ft

6,000ft

Top at 6,269ft

7,000ft

Btm at 7,864ft

8,000ft

Interbedded

anhydrite

9,000ft

10,000ft

Top at 10,455ft

11,000ftBtm at 10,963ft

Leman

Sandstone

MD BRT

(ft) Perm

eab

le

Hyd

roca

rbon

s

Anhydrite

Salt

Cretaceous

Chalk

Bunter

Sandstone

Before

0

1,000ft

2,000ft

39 Top at 2,140ft

3,000ft

4,000ft

Btm at 4,696ft

5,000ft

6,000ft

Top at 6,269ft

7,000ft

Btm at 7,864ft

8,000ft

56Interbedded

anhydrite

9,000ft

10,000ft

79

77 Top at 10,455ft

11,000ftBtm at 10,963ft

Salt

Perm

eab

le

Hyd

roca

rbon

s

MD BRT

(ft)

Cretaceous

Chalk

Bunter

Sandstone

Anhydrite

Incl

inati

on

(o)

Leman

Sandstone

After

Page 17: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

17

How did we do each well activity?

WELL ACTIVITY WELL SERVICE

Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s.

Coiled Tubing cementing

Surface Tank Farm

Surface Venting Package

Tubing Severance Slick-line, Jet cutter

Tubing Recovery Tension table and starter jacks

Crane and side door elevators

Band saw

Laydown rack with kick over plate

Shallow Set Plug Slick-line, 9 5/8” BP, perforation guns

Surface Tank Farm, Surface Venting Package

Coiled tubing cementing

Slick-line tagging TOC

Multi-String Casing

Recovery

Multi string (4) Abrasive cutter

Tension table and starter jacks

Drill and pin unit, Band saw

Crane and dedicated sling set (Limited platform load)

Laydown bucket

Page 18: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

18

WHO STOLE MY DERRICK? Working without a derrick

– what is different?

Page 19: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

19

Differences between Rig and Rig-less P&A?

DIFFERENCE LEARNING

Sea Fastening Time consuming activity if welding is required:

best avoided if the balance of risk recommends

to do so e.g. heavy lifts, poor weather forecast

No rig floor Extensive scaffolding required around the platform top deck

which is time consuming

Manning Levels Deck crew only, no drill crew to re-assign

to assist services. Multi-skilled service crews are an

important resource for barge operations.

Vertical to

Horizontal

No V door, require kick over rack and swivel bucket to lay

down recovered tubulars

Incidental Services Ad Hoc welding, Drill floor tools, Dunnage

Tanks not pits Less functionality for separating, recirculation,

and supplying the on-board fluids

Deck Management

– Multiple Services

JULB not as familiar with service change out.

More used to load – sail – deploy – return

Approach to

critical path

JULB less attuned to offline preparation

Primary Crane Slow compared to draw-works

Crane Operators Less familiar and less efficient with multiple loading and

offloading of PSV

Page 20: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

20

What are the drivers for Barge vs Rig vessel selection?

DRIVER BARGE RIG

Rig Move Costs

A self propelled barge needs no tow vessel support.

Lighter vessels have shorter pre-load and jacking times.

+ –

Operating Rate

Barges remain lower cost than jack-up rigs. + –

Crane Operations for Boat Work

High capacity cranes move more slowly and crew’s are less

accustomed to high volume lifting activities.

– +

Lots of Tubular Handling

A rig would provide more handling options for stands of pipe and

contingencies, including torque capability.

– +

Scaffolding Requirements

A rig would require fewer scaffolding towers to provide safe access to

intervention equipment on the drill floor or top deck.

– +

Rig-Up time per well

Could be more efficient with the benefit of a drill floor. – +

Would we change our approach in future?

Page 21: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

21

ALTERNATIVE APPROACHES TO WELL P&A: Other projects

Page 22: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

22

Alternative approaches to Well P&A: Other on-going projects

UKCS

• Abandonment of three subsea wells in the CNS

with Petrofac Well Engineering as outsourced Well

Operator

Japan

• Examining methods to abandon a problem well

onshore Japan which has collapsed casing and

annulus pressures

Australia

• Strategy for abandonment of two onshore wells in

Western Australia to use coiled tubing to set the

primary reservoir abandonment plug then a

workover rig to cut and recover tubing and complete

the abandonment operations. This will reduce cost

as a rig can be mobilised for the drilling and

abandonment phases at the same time

New Zealand

• Review of studies into the optimal method of

decommissioning offshore subsea wells in New

Zealand – recommendation is to use an intervention

vessel rather than a rig

Page 23: Alternative Approaches to Well P&A · Deep Set Plug Setting Slick-line suspension plug recovery, set bridge plug’s. Coiled Tubing cementing Surface Tank Farm Surface Venting Package

23

Alternative approaches to well P&A: Some interesting challenges

• Abandoning a well that was drilled in 1931 and therefore has no data

• Wells drilled and completed with fully un-cemented casing strings

• Wells that have been suspended with ‘wooden plugs’

• A well beside an airport runway – SIMOPS with Air Traffic Control!

• An old well that started leaking under a house

• An old abandoned well that is leaking and it is located in a warehouse basement