alliance inspection and engineering services profile updated 2017.pdf · 2019. 7. 21. · iii....

43

Upload: others

Post on 22-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 2: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 3: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. DESCRIPTION

01 Company Introduction / General Infromation

02 Registration Certificates

03 Scope of Work

04 List of Clients

05 List of Job Work Contracts (Completed)

06 List of Job Work Contracts (In hand)

07 List of Equipments

08 HSE and Quality Policy

09 List of key personel

LIST OF CONTENTS

Page 4: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 5: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

INTRODUCTION OF COMPANY AIES had been established to provide Services as Third Party Inspection and Non Destructive Testing Services for Fabrication, Erection and Oil and Gas Industry

Our system and procedures are in Conformance with ISO – 9001 accredited procedure.

We operate countrywide. Our Inspection Services protect our valued Client’s interest by ensuring that what each client buys is precisely what he wants.

WHY INSPECTION IS IMPORTANT Inspection can save time and money. Our services contribute to effective purchasing and project execution by:

Assessing the capability of manufactures before the contract is awarded. Making critical stage manufacturing checks and witnessing tests, monitoring and

reporting agreed stages of inspection during of major project. Issuing verification that correct goods are dispatched. Minimizing the risk of delays and rectification of Cost due to NON-

CONFIRMING equipment / material arriving at site. Maximizing quality and reliability standards inherent in the Specifications.

ALLIANCE INSPECTION AND ENGINEERING SERVICES Is a thought of engineering professional having a diversified exposure in specialize services of all kind of inspection quality management system and technical services to Petrochemical, Energy sector and other Engineering Industries.

Nature of Company services is an essential part of inspection and technical services required in Pakistan as a result of changes in the recent approach to increase pressure on industries to improve the quality, reduce cost and increase profitability.

The Mission of Our Company is:-

“EARNING COUSTOMER STISFICATION BY EMPLOYING STATE OF THE ART SERVICES & INVESTING OUR PEOPLE TO OUR CLIENT”.

Although there are many companies providing alike services in Pakistan butt we, being a professional and experienced group, claim to provide these services in more professional manner.

We offer total solution in engineering and inspection services at promising cost and at the doorstep of our client.

Page 6: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

WHERE CAN WE HELP If we need to ensure that supplies meet specification, arrive the destination in good

condition and perform correctly than we are here to serve in:

• Approving the quality control plan

• Identifying the manufactures and developing their abilities to produce goods to

required standards.

• Arranging in process- inspection

• Witnessing the test or trails

• Inspection of product packing and making

• Pre-shipment verification

THE COST OF INSPECTION:

The cost of inspection is negligible as compared with consequences of incorrect and

substandard supply. The fee is quoted on individual contract basis depending upon the

scope of inspection, the type of equipment and source of manufactures. It is quoted either

as a lump sum fixed fee, as a percentage of value or on a day rate basis along with

reimbursable as the case may be,

Page 7: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

GENERAL INFORMATION

Company Name: ALLIANCE INSPECTION AND

ENGINEERING SERVICES Registered Office House # MC-204, Ground Floor, Street # 06, Address: Green Town, Airport, Karachi # 43. 75210. UAE Office Office # 13, Mussafah Industrial Area # 40, Address: Abu Dahbi. (P.O. Box # 111587) Telephone No. 021- 34580003 Fax. No. 021- 34580016 UAE Tel No. 00971-508599103 Email [email protected]

[email protected] Web Site www.aiespk.com Year incorporated: 2004.

Page 8: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 9: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 10: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 11: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 12: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 13: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 14: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction
Page 15: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 16: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

SCOPE OF WORK

We are working for Oil & Gas, Fertilizer, Power and Petrochemical Industries. We have experienced Engineers and certified inspectors from API, ASNT and PAEC which have thorough knowledge and sufficient experience of project management and stage inspection .We are providing services in the field of Procurement, Construction, Third party inspection services for Stage and In-Service Inspection, documentation of APIQ1, ISO9001 & its implementation and Commissioning of Project.

Main features and activities of our company include.

A) Third Party inspection Services for LPG and CNG i. Consultancy for modification in Old Plant approved by HDIP in accordance with

OGRA and NFPA – 58 set standards ii. Consultancy for verification of Design

iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction of LPG Vessel, Bullets and Bowzer v. Stage Inspection for LPG cylinders manufacturing

vi. Calibration of equipments vii. Consultancy for set-up of Auto LPG Gas dispensing station.

B) Third Party Inspection Services for Cross Country Pipeline:

i. Inspection of ROW, Stringing and Fitups of joints. ii. Visual Inspection of Welding Joints during Construction. iii. Inspection of Trenching and Lowering. iv. Inspection during Installation of Heat Shrink Sleeves.

C) Third Party Inspection Services for Procurement: i. Inspection of steel plates for Storage Tanks, Vessels, LPG Bullets and Bowzer

ii. Inspection of Station and Refinery piping material iii. Inspection of Rotary and Stationary equipments

D) Third Party Inspection Services for Welding: i. Prepare Welding Specification and procedures

ii. Supervise the welding procedure and welder qualification tests iii. Inspection of welding during execution of job

Page 17: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

E) Third Party inspection Services for Stage Inspection: i. During fabrication Erection of Storage Tanks

ii. During fabrication of Pressure Vessels, Heat Exchangers & Boilers iii. During manufacturing of Pipes and Coating at mills

F) Third Party inspection Services for In- Service Inspection: ii. Pressure Vessels as per API - 510

iii. Storage Tanks as per API – 653 iv. Station Piping as per API – 570 v. CP audit and Corrosion Control

G) Non Destructive Testing Services: i. Radiographic Testing (R.T.)

ii. Ultrasonic Testing (U.T.) iii. Magnetic Particle Testing (M.T.) iv. Liquid Penetration Testing (P.T.) v. Visual Inspection (V.T.)

H) Skilled Manpower Supply Services

i. Engineers of all disciplines ii. Certified Inspectors

iii. Supervisors of all disciplines iv. Fabricators, Welders, Riggers v. Skilled & Unskilled Labors

I) Quality Management System Services i. Documentation of ISO 9001 - 2000

ii. Documentation of API Q1 iii. Implementation of Quality management system iv. Annual maintenance service for Quality management system

Page 18: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 19: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. CLIENT NAME

01 Pak Arab Pipeline Company Ltd02 Pakistan Petroleum Limited03 Pak Arab Refinery Company Ltd04 B.G. Elect. & Mechanical Company05 Engineering Kinetics Limited06 S&T Engineering (Pvt.) Ltd.07 Weatherford Pakistan08 Lucky Textile Mills Karachi09 Shashi Steel Pipe Works ( Pvt.) Ltd10 Murtizvi Oil & Gas Services11 Zishan Engineers (Pvt.) Ltd.12 Karachi Water & Sewerage Board13 China Harbour Construction Corporation14 Midhat Siddiqui associates15 TECHNO Engineering (Pvt.) Ltd16 Interglobe Commerce Pakistan (Pvt.) Ltd17 Marathon Construction Company (Pvt.) Ltd.18 SEFEC Engineering (Pvt.) Ltd.19 Pakistan State Oil.20 Lucky Cement Karachi21 Uniteam (Pvt.) ltd.22 ABS Engineering23 Industrial Development & Engineering Associates24 Hascombe Storage (Pvt.) Ltd.25 RM Gulistan Engineers and Contractors26 Ayoub Brothers Engineers & Contractors27 Shell Oil Pakistan (Pvt.) Ltd. 28 UNICOL (Pvt.) Ltd.29 Hi Sooper Gas (Pvt.) Ltd.30 Rohi Gas (Pvt.) Ltd.31 Blessing Gas (Pvt.) Ltd.32 Macca Gas (Pvt.) Ltd.33 JJVL Pakistan (Pvt.) Ltd.34 Progas Pakistan Ltd.35 Marshal Gas (Pvt.) Ltd.

LIST OF CLIENTS

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Page 20: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

36 Kiran Gas (Pvt.) Ltd.37 Sindh Gas (Pvt.) Ltd.38 Fon Gas (Pvt.) Ltd.39 Errection Engineers & Contractors (EEC)40 Fas Tube Mill & Engineering Industries41 Imran Engineering.42 Data Steel (Pvt.) Ltd.43 Hitek Associates.44 Hameed & Sons Engineering.45 Admor Oil (Pvt.) Ltd.46 Enar Petroleum Refining Facility47 Shaheen Gas (Pvt.) Ltd.48 Alliance Energy (Pvt.) Ltd.49 Alpha Gas (Pvt.) Ltd.50 Wyne Gas (Pvt6.) Ltd.51 Sarhad Petroleum (Pvt.) Ltd.52 Shell Gas LPG (Pvt.) Ltd. 53 Lorenzo Gas (Pvt.) Ltd.54 Hazara Efficient Gas55 Super Gas (Pvt.) Ltd.56 Bosicor Pakistan (Pvt.) Ltd.57 OPI Gas Dhurnal LPG Plant58 Kazmi Engineering.59 National Refinery Ltd (NRL)60 Sui Southern Gas Company Limited61 Dynamic Engineering (Pvt.) Ltd.62 Gull Ahmed Textile Mill.63 Ravi Green (pvt.) Ltd.64 Alprince Engineers (Pvt.) Ltd.65 Crescent Steel & Allied Products66 Crescent Construction Company 67 Petrocon (Pvt.) Ltd.68 Engro Polymer & Chemical (Pvt.) Ltd.69 Lasani LPG Private Limited70 Engro Vopak Terminal Limited71 China Petroleum Construction and Engineerting Corp. (CPECC)72 China National Chemical Engineering Corporation (CNCEC)73 Fatima Fertilizer Company Limited.74 Peoples Steel Mill75 Indusmen Corporation Limited76 Cress LPG Private Limited77 Metcraft Engineering78 British Petroleum Pakistan79 China National Chemical Engineering 16 Corporation (CNCEC 16)

Page 21: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

80 ICC Engineering (Pvt.) Ltd.81 Tobishima Corporation82 Etihad Energy Private Limited83 Mari Petroleum Compny Limited (MPCL)84 Thatta Cement (Pvt) Ltd85 Byco Petroleum Pakistan Ltd

Page 22: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 23: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

01 WOPP PAPCO TECHNO Engineering (Pvt.) Ltd. 2004 MPI & DPT of Pipeline02 WOPP PAPCO TECHNO Engineering (Pvt.) Ltd. 2004 MPI & DPT of Storage tanks03 WOPP PAPCO B.G. Elect. & Mech. Co. 2004 - 05 MPI of Structural Equipments04 At Workshop Defence Housing Athourity Engineering Kinetics Limited 2004 MPI, DPT & RT of Storage tanks

05 Pipeline Maintenance PARCO PARCO 2004 - 05 WPQR, WQT & Sleeve Inspection (VT; MT;UT. & RT.)

06 Const.of Storage Tanks Pakistan State Oil S&T Engineering (Pvt.) Ltd. 2004 - 05 Storage Tanks (S.S.) MT.&RT07 At Workshop Weatherford Pakistan Weatherford Pakistan 2004 - 05 RT Inspection of Spool

08 Lucky Textile Mill Unit - 4 Lucky Textile Mills Karachi N.Z. Techno Craft (Pvt.) Ltd. 2004 - 05RT & Visual Inspection of Plant Errection, Pipeline and Power House Construction

09 At Workshop Murtizvi Oil & Gas Services Murtizvi Oil & Gas Services 2004 - 05 MPI of connections10 Manpower Supply Zishan Engineers (Pvt.) Ltd. Zishan Engineers (Pvt.) Ltd. 2004 - 05 Manpower Supply for Nijeria

12 OP-II Karchi Port Trust Karachi Port Trust (KPT) China Harbour Construction Corporation

2005 UT Inspection of Piles

13 OP-II Karchi Port Trust Karachi Port Trust (KPT) Midhat Siddiqui associates 2005 MPT Inspection of Structure

14 Mancher Bypass 16" Dia Pipeline Pak-Arab Refinery Ltd. Marathon Construction Company (Pvt.) Ltd.

2005 - 06 RT & Visual Inspection of Pipeline

15 Interconection of Existing Facility & WOPP line PARCO

Pak-Arab Refinery Ltd. Interglobe Commerce Pakistan (Pvt.) Ltd

2005 - 06 RT & Visual Inspection of Pipeline

16 Storage Tanks of Jhang Sugar Mills at Jhang

Jhang Sugar Mills Interglobe Commerce Pakistan (Pvt.) Ltd

2006 RT Inspection of Storage Tanks

17 Storage Tanks of Bhon Sugar Mills at Bhon (Jhang)

Bhon Sugar Mills Interglobe Commerce Pakistan (Pvt.) Ltd

2006 RT Inspection of Storage Tanks

18 Pipeline Maintenance PARCO PARCO 2006 UT & Visual Inspection of Sleeve

19 Interconection of Existing Facility & KPLP line PARCO

Pak-Arab Refinery Ltd. Marathon Construction Company (Pvt.) Ltd.

2006 RT & Visual Inspection of Pipeline

20 Storage Tanks at Lucky cement Karachi

Lucky Cement Karachi SEFEC Engineering (Pvt.) Ltd 2006 RT Inspection of Storage Tanks

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

Karachi Bulk Water Supply (KW&SB)

Karachi Water & Severage Board 2004 - 05 RT & Holiday Inspection of Pipeline11 Echowest Pakistan (Pvt.) Ltd.

Page 24: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

21 Discharge Lines From HSD Tanks at Pak Arab Refinery

Pak-Arab Refinery Ltd. Errection Engineers & Contractors

2006 RT inspection of Piping

22 Storage Tanks of Shell Oil Pakistan (Pvt.) Ltd. at Kaimari.

Shell Oil Pakistan (Pvt.) Ltd Interglobe Commerce Pakistan (Pvt.) Ltd

2006 RT and MPI Inspection of Storage Tanks

23 Construction of Lucky Cement Karachi

Lucky Cement Karachi SEFEC Engineering (Pvt.) Ltd 2006 RT Inspection of Storage Tanks

24 Pipeline Maintenance PARCO PARCO 2006 UT & Visual Inspection of Sleeve25 WOP Pipeline Maintenance PARCO PARCO 2006 UT & Visual Inspection of Sleeve

26 Karachi Bulk Water Supply K-III Project

Karachi Water & Severage Board (KW&SB)

RM Gulistan Engineers and Contractors

2006 RT, UT & Holiday Inspection of Pipe line

27 Mill Inspection & Loading Supervision for Dia 2", 3" & 4"

Kazmi Engineering Huffaz Seamless Pipe Industries Limited

2006 Mill Inspection & Loading Supervision

28 Karachi Bulk Water Supply K-III Project

Karachi Water & Severage Board (KW&SB)

Ayoub Brothers Engineers & Contractors

2006 RT, UT & Holiday Inspection of Pipe line

29 Storage Tanks at Mirpurkhas Sugar Mill

UNICOL (Pvt.) Ltd ABS Engineering (Pvt.) Ltd. 2006 RT Inspection of Storage Tanks

30 LPG storage Tanks and Plant inspection

Hi Sooper Gas (pvt.) Ltd. Imran Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

31 Interconection of Piiping at Pak Arab Refinery Qasba Gujrat

Pak-Arab Refinery Ltd. Errection Engineers & Contractors

2006 RT inspection of Piping

32 Pipe End X - Ray Sui Southern Gas Company Ltd Shashi Steel Pipe Works (Pvt.) Ltd.

2006 RT inspection of Pipe Ends and Repairs

33 LPG storage Tanks and Plant inspection

Rohi Gas (Pvt.) Ltd Imran Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

34 Mill Inspection & Loading Supervision

Industrial Development & Engineering Associates

Huffaz Seamless Pipe Industries Limited

2006 Mill Inspection & Loading Supervision

35 Mill Inspection & Loading Supervision for Dia 2", 3" & 4"

Kazmi Engineering Huffaz Seamless Pipe Industries Limited

2006 Mill Inspection & Loading Supervision

36 LPG storage Tanks and Plant inspection

Blessing Gas (Pvt.) Ltd. Imran Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

Page 25: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

37 LPG storage Tanks and Plant inspection

Macca Gas Pvt. Ltd Imran Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

38 LPG storage Tanks and Plant inspection

JJVL Pakistan (Pvt.) Ltd Imran Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

39 LPG storage Tanks and Plant inspection

Progas Pakistan Ltd Uniteam 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

40 LPG storage Tanks and Plant inspection

Marshal Gas (Pvt.) Ltd Kazmi Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

41 LPG storage Tanks and Plant inspection

Kiran Gas (Pvt.) Ltd Kazmi Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

42 LPG storage Tanks and Plant inspection

Sindh Gas (Pvt.) Ltd Kazmi Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

43 LPG storage Tanks and Plant inspection

Fon Gas (Pvt.) Ltd Kazmi Engineering 2006 Third Party Inspection and NDT Inspection of LPG Storage tanks

44 Pipe End X - Ray Sui Northern Gas Company Ltd Data Steel (Pvt.) Ltd. 2006 RT inspection of Pipe Ends and Repairs

45 LPG storage Tanks inspection Imran Engineering Hi Sooper Gas (Pvt.) Ltd. 2006Third Party Inspection and NDT Inspection of LPG Storage tanks

46 LPG storage Tanks inspection Synergy Resouces (Pvt.) Ltd. Hitek Associates 2006Third Party Inspection and NDT Inspection of LPG Storage tanks

47 LPG storage Tanks inspection Hameed & Sons Engineering Hameed & Sons Engineering 2006Third Party Inspection and NDT Inspection of LPG Storage tanks

48Station Piping and Storage Tanks piping Admor Gas (Pvt.) Ltd. Petroequipment (Pvt.) Ltd. 2006 RT inspection of Piping

49LPG storage Tanks and Piping inspection Kazmi Engineering Kazmi Engineering 2006

Third Party Inspection and NDT Inspection of LPG Storage tanks

50 Mill Inspection & Loading Supervision for Dia 2", 3" & 4"

Kazmi Engineering Huffaz Seamless Pipe Industries Limited

2006 Mill Inspection & Loading Supervision

518" Dia Station Piping of PSO Kemari Terminal B Pakistan State Oil

Dianamic Engineering Private Limited. 2006 RT inspection of Piping

52 Third Party Inspection of LPG Plant Shaheen Gas (Pvt.) LtdFas Tube Mill and Engineering Industries 2007

Third Party Inspection and NDT Inspection of LPG Plant Errection

Page 26: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

53 Storage Tanks of OGDCL at Dhodhak Oil Field

OGDCL Interglobe Commerce Pakistan (Pvt.) Ltd

2007 RT Inspection of Storage Tanks

54 Pipeline Maintenance PARCO PARCO 2007 UT & Visual Inspection of Sleeve55 WOP Pipeline Maintenance PARCO PARCO 2007 UT & Visual Inspection of Sleeve

56 Piping of Boiler Gul Ahmed Textile Mill Descon Engineering (Pvt.) Ltd. 2007 RT inspection of Piping

57 Pipe End X - Ray Sui Northern Gas Company Ltd Shashi Steel Pipe Works (Pvt.) Ltd.

2007 RT inspection of Pipe Ends and Repairs

58 LPG Storage Tanks Inspection Imran Engineering Imran Engineering 2007 Third Party Inspection and NDT Inspection of LPG Storage tanks

59 PARCO to Admor Gas Pipeline PARCO Hitek Associates 2007 RT inspection of Pipline

60Welding inspection on MFM Pipeline at Upper Gogera Canal PARCO

Marathon Construction Company (Pvt.) Ltd. 2007 RT & Visual Inspection of Pipeline

61 Cylinder Inspection Sindh Gas (Pvt.) LtdFas Tube Mill and Engineering Industries 2007 Inspection of Cylinders Manufacturing

62 Pipeline Maintenance PARCOErrection Engineers & Contractors 2007 UT & Visual Inspection of Pipeline

63 LPG Storage Tank Inspection JJVL Pakistan (Pvt.) Ltd Imran Engineering 2007Third Party Inspection and NDT Inspection of LPG Storage tanks

64 LPG Storage Tank Inspection OCCE Ravi Green (Pvt.) Ltd 2007 NDT Inspection of LPG Storage tanks

65 LPG Storage Tank Inspection Home Gas (Pvt.) Ltd Hameed & Sons Engineering 2007Third Party Inspection and NDT Inspection of LPG Storage tanks

66Construction of Lubricant Plant at Port Qaism

Total Atlas Pak. Lubricant (Pvt.) Ltd. Petrocon (Pvt.) Ltd. 2008 NDT Inspection of Piping and Tanks

67Laying of CO2 Pipe Line from Engro Vopac to Engro Asahi Engro Polymer & Chemical Ltd. ABS Engineering (Pvt.) Ltd. 2008 100 % Radiography of Pipe Line

68 KPLP Phase - II Port Qasim PAPCO Al - Prince Engineers 2008 100 % Radiography of Pipe Line

69KPLP TDL Phase - II PS - 1 Korangi Creek PAPCO

Metal Engineering Complex (Pvt.) Ltd. 2009 100 % Radiography of Pipe Line

70Construction of Tank and Piping at Bubak Station PS - 2 PAPCO Ravi Green (Pvt.) Ltd 2008 Radiography of Storage Tank and Piping

71Construction of Storage Tank of Bosicor Refinery Bosicor Pakistan Ltd.

Interglobe Commerce Pakistan (Pvt.) Ltd 2008 Radiography of Storage Tank

Page 27: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

72Construction of Storage Tank of Engro Asahi Engro Polymer & Chemical Ltd. Engineering Kinetics Limited 2008 Radiography of Storage Tank

73 LPG Storage tank Inspection Dua LPG (Pvt.) LtdFas Tube Mill and Engineering Industries 2008

NDT and Third Party Inspection of LPG Storage tanks

74 LPG Storage tank Inspection Rana LPG (Pvt.) Ltd.Fas Tube Mill and Engineering Industries 2008

NDT and Third Party Inspection of LPG Storage tanks

75 Pipeline Maintenance PARCO 2008 UT & Visual Inspection of Sleeve Welding

76Construction of Tank and Piping at Fazilpur Station PS - 4 PAPCO Ravi Green (Pvt.) Ltd 2008 Radiography of Storage Tank and Piping

77Construction of Dish ends of Tuwarqi Steel Tuwarqi Steel Mils Ltd. Imran Engineering 2009 Radiography of Dish Ends Joints

78Mill Inspection ans Loading Supervision of 18" Dia line Pipe Sui Southern Gas Company Ltd Data Steel (Pvt.) Ltd. 2009

Mill Inspection ans Loading Supervision of 18" Dia line Pipe

79Construction of Storage Tank of Attock Petroleum Limited Attock Petroleum Limited

Interglobe Commerce Pakistan (Pvt.) Ltd 2008 Radiography of Storage Tank

80Designing and Inspection of LPG Bottling Plant of Lasani LPG Lasani LPG Private Limited ~ 2009

Third Party Inspection and NDT Inspection of LPG Storage tanks and Plant

81Radiogarphy of Vessels of Engero Asahi Polymer Engro Polymer & Chemical Ltd. ~ 2009 Radiography of Vessels

82Radiogarphy of MNA Energy LPG Plant Piping MNA Energy Private Limited Uniteam 2008 Radiography of Plant Piping

83Inspection of Dry Gas Filters fo Sui Northern Pipiline Limited Sui Northern Gas Company Ltd Ever Clean Associates In Progress

Inspection of Filters Manufacturing as Per ASME Sec VIII

84Relocation of PARCO 20" Dia Transfer Line AT Malir River PARCO

Marathon Construction Company (Pvt.) Ltd. 2009 Radiogarphy of Pipeline

85Construction of Storage Tank of Engero Asahi Polymer Engro Polymer & Chemical Ltd. Engineering Kinetics Limited 2008 TPI and Radiography of Storage Tank

86Valve Segragation of Tanks at PARCO's TS - 4 Machieke PARCO Hi - Tek Associates 2008 Radiogarphy of Joints Dia 18" and 16"

87Radiogarphy of EDC Storage Tank of Engero Asahi Polymer Engro Polymer & Chemical Ltd. Engineering Kinetics Limited 2008 TPI and Radiography of Storage Tank

88Radiogarphy of Piping for Ethylene Transportation Engro Vopak Terminal Ltd.

China National Chemical Engineering Corp. (CNCEC) 2009 100 % Radiogarphy of Process Piping

89Construction of Storage Tank of Caltex Pakistan Limited Caltex Pakistan Limited

Interglobe Commerce Pakistan (Pvt.) Ltd 2009 Radiography and MPI of Storage Tank

Page 28: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

90Welder Qualifictaion For ADCOP Project Abu Dhabi

China Petroleum Engineeing & Construction Corporation

TECHNO Engineering (Pvt.) Ltd. 2009

Third Party inspection of WQT and NDT Inspection WQT at Karachi. Pakistan

91 Cylinder Inspection Agha Gas (Pvt.) LtdCylinder Engineering Ind. (Pvt.) Ltd. 2009

Third Party Inspection of Cylinders and Bowzer

92 LPG Storage tank Inspection Lasani LPG Private LimitedFas Tube Mill and Engineering Industries 2009

Third Party & NDT Inspection of LPG Storage tanks

93Construction of 36" dia. 15 Km Water Pipeline K.W. & S.B. Indusmen Corporation 2009 Third party and NDT inspection of Pipeline

94Construction of VCM Plant at Engro Polymer & Chemical Ltd. Engro Polymer & Chemical Ltd.

China National Chemical Engineering Corp. (CNCEC) 2009 100 % Radiogarphy of Process Piping

95Construction of CA Plant at Engro Polymer & Chemical Ltd. Engro Polymer & Chemical Ltd.

China National Chemical Engineering Corp. (CNCEC) 2009 100 % Radiogarphy of Process Piping

96Construction of Fatima Fertilizer Plant at Sadiqabad Fatima Fertilizer Company Ltd.

China National Chemical Engineering Corp. (CNCEC) 2009

Third party inspection of WQT and NDT inspection of all Fabrication Works

97Construction & Repairing of Oil Storage Tank British Petroleum Metcraft Engineering 2009 NDT inspection of all Fabrication Works

9809 Nos. of 150 M. Ton LPG Storage tank Inspection Cress LPG (Pvt.) Ltd

Ravi Green (Pvt.) Ltd / IFC Engineering (Pvt.) Ltd. 2010 Radiographic Inspection of LPG Storage tanks

99NDT & TPI of Encirclement Sleeve Welding on KMK Line PARCO

Errection Engineers & Contractors (EEC) 2010 UT & Visual Inspection of Sleeve Welding

100NDT of Fire Fighting Line (EPLP-4801 and EPLP-1832) Engro Vopak Terminal Ltd. Al - Raheem Engineering 2010 Radiogarphy of Piping

101RT at DHDS PARCO MCR Qasba Gujrat Project PARCO

China National Chemical Engn 16 Corp. (CNCEC 16) 2010 100% Radiographic Inspection of Weld Joints

10206 Nos. of 60 M. Ton LPG Storage tank Inspection SSGC Hitek Manufacturing (Pvt.) Ltd. 2010

TPI and Radiographic Inspection of LPG Storage tanks

103 05 Nos. of 10 M. Ton LPG Storage tank Inspection

Tetra Pack Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Storage tanks

104 100 M. Ton LPG Storage tank Inspection

Synergy Resouces (Pvt.) Ltd. Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Storage tanks

105 30 M. Ton LPG Bowser Inspection Synergy Resouces (Pvt.) Ltd. Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Bowzer

106 60 M. Ton LPG Storage tank Inspection

Madni Gas (Pvt.) Ltd. Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Storage tanks

107 30 M. Ton LPG Bowser Inspection Madni Gas (Pvt.) Ltd. Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Bowzer

Page 29: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

108 25 M. Ton LPG Bowser Inspection Home Gas (Pvt.) Ltd. Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Bowzer

109 25 M. Ton LPG Bowser Inspection Noor LPG Gas (Pvt.) Ltd. Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Bowzer

110 25 M. Ton LPG Bowser Inspection Yaqoob Industries Hitek Manufacturing (Pvt.) Ltd. 2010 TPI and Radiographic Inspection of LPG Bowzer

111 Radiography at CROF site KNNUP Karachi

PAEC ICC (Pvt.) Ltd. 2010 100% Radiographic Inspection of Weld Joints

112 NDT & TPI of Encirclement Sleeve Welding on KMK Line

PARCO PARCO 2010 UT & Visual Inspection of Sleeve Welding

113 Construction of Enar Petroleum Refinery Facility 2 (EPRF-2)

Enar Petroleum Refinery Peoples Steel Mill / Hi-Tek Associates & ICPL

2010 NDT inspection of all Fabrication Works

114 50 M ton LPG Storage tank Inspection

Noor LPG Gas (Pvt.) Ltd. Ravi Green Engineering (Pvt.) Ltd.

2010 Radiographic Inspection of LPG Storage tank

115 NDT & Full Encirclement Sleeve Welding on KMK Line

PARCO PARCO 2011 UT & Visual Inspection of Sleeve Welding

116 NDT & Full Encirclement Sleeve Welding on WOP Line

PARCO PARCO 2011 UT & Visual Inspection of Sleeve Welding

117 30 M. Ton LPG Bowser Inspection Hitek Manufacturing (Pvt.) Ltd. 2011 Radiographic Inspection of LPG Bowzer

118 10 M. Ton LPG Bowser Inspection Hitek Manufacturing (Pvt.) Ltd. 2012 Radiographic Inspection of LPG Bowzer

119 LPG Storage tank Inspection Fas Tube Mill and Engineering Industries

2012 NDT and Third Party Inspection of LPG Storage tanks

120Mill Loading/unloading Supervision pf 62300 meters pipe 12.75 inch dia WT bare linepipe/3LPE Coating at Shghai CHINA

SUI Southern Gas Company. 2012Mill Loading/unloading Supervision pf 62300 meters pipe 12.75 inch dia WT bare linepipe/3LPE Coating at Shghai CHINA

121 DPT Inspection at Metcraft KHI BP Pakistan Metcraft Engineering 2012 DPT Inspection at Metcraft KHI

122 Supervision Services during construction pf 6" dia 5X at ADHI

Pakistan Petroleum Limted 2012 Supervision Services during construction pf 6" dia 5X Buried feeder at ADHI

123 Supervision Services during construction of Tanks water at SUI

Pakistan Petroleum Limted 2012 Supervision Services during construction of Tanks water at SUI

124 DPT Inspection at ISL of Ammonia Gas Plant ISL Rana Brother 2012 DPT Inspection at ISL of Ammonia Gas Plant

125 Visual and RT During Construction of Ground vertical S.Storage Tank

Pakistan Petroleum Limted 2012 Visual and RT During Construction of Ground vertical S.Storage Tank at SUI

126 Visual and RT During Construction of feeder line SUI 98 well

Pakistan Petroleum Limted 2013 Visual and RT During Construction of feeder line SUI 98 well at SUI

Page 30: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

127 Radiography Project different Dia Pakistan State Oil Aftab Technologies 2013 Radiography Inspection Services at Keemari

128 NDT and Viusal Inpection for Tank LMT

Pakistan State Oil Pearl Engineering 2013 NDT and Viusal Inpection for Tank LMT Karachi

129 NDT and Viusal Inpection for Tank LMPA

Pakistan State Oil 2013 NDT and Viusal Inpection for Tank LMPA Karachi

130 Radiography /MT /DPTand Visual Inspection

UEP PCL 2013 Radiography and Visual Inspection at PCL KHI Yard

131 NDT Services at BOT karachi Pakistan State Oil ~ 2014 NDT and Visual Inspection of Tank at BOT

132 NDT Services at Korangi karachi Pakistan State Oil ~ 2014 NDT and Visual Inspection of Tank at Korangi

133 NDT Services at Kemari karachi Pakistan State Oil ~ 2014 NDT and Visual Inspection of Tank at Kemari

134 NDT Services at LMPA karachi Pakistan State Oil ~ 2014 NDT and Visual Inspection of LMPA Tank at Kemari

135 RT of 36" Dia Water pipeline from Pepri to Malir damloti

KW&SB Sahara Tameerat 2014 Ultrasonic Testing of Weld Joints

136 Radiography and Visual services at different Location

OGDCL Applus Velosi Integrity 2014 Radiography and Visual services at different Location

137 Radiography /MT /DPTand Visual Inspection

UNICOL (Pvt.) Ltd Rana Brother 2014 Radiography /MT /DPTand Visual Inspection at Unicol Plant Mirpurkhas

138 Radiography /MT /DPTand Visual Inspection

UNICOL (Pvt.) Ltd IMJ Assocates 2014 Radiography /MT /DPTand Visual Inspection at Unicol Plant Mirpurkhas

1393rd Party Inspection and Loading Supervision of 16" Dia 8.5 KM X52 SMLS Pipe

Pakistan Petroleum Limted Hengyang Valin Steel Tube Co. Ltd.. China

2014 Mill Inspection and Loading Supervision

1403rd Party Inspection and Loading Supervision of 16" Dia 1 KM X52 & 0.5 KM X60 SMLS Pipe

Pakistan Petroleum Limted Hengyang Valin Steel Tube Co. Ltd.. China

2014 Mill Inspection and Loading Supervision

1413rd Party Inspection and Loading Supervision of 16" Dia 1 KM X52 & 0.5 KM X60 SMLS Pipe

Pakistan Petroleum Limted Yangzhou Lontrin Steel Tube Co. Ltd. China

2014 Mill Inspection and Loading Supervision

1423rd Party Inspection and Loading Supervision of 8" Dia 11.5 KM X70 SMLS Pipe

Pakistan Petroleum LimtedHuffaz Seamless Pipe Industries Limited 2014 Mill Inspection and Loading Supervision

1433rd Party Inspection and Loading Supervision of 8" Dia 9.5 KM X70 SMLS Pipe

Pakistan Petroleum LimtedHuffaz Seamless Pipe Industries Limited 2014 Mill Inspection and Loading Supervision

Page 31: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

144 Radiography and Visual Inspection Call out Basis 1 Year 2014-2015

National Refinery Limited ~ 2015 Radiography and Visual Inspection Call out Basis 1 Year 2014-2015

145 NDT Services at Kemari karachi Pakistan State Oil ~ 2015 TPI and NDT Inspection at KTA 402

146NDT Services at Sujjal X-1 and Sujawwal Block Mari Petroleum Company Ltd Joint Engineering /AWS 2015

TPI/NDT Services of 17Km Pipeline at Sujjal X1 and Sujawal Block Plant Piping.

147 RT and DPT Works at HUB Infradev UEP 2015 RT and DPT of Tanks.

148 Pit Laying and Geomembrane at different location

Pakistan Petroleum Limitred ~ 2015 Pit Laying and Geomembrane at different location

149Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Cangzhou CHINA

Pakistan Petroleum Limitred ~ 2015Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Cangzhou CHINA

150Integrity Check of Sell Roof Associated Structure of HSD WOTS Port Qasim

PAPCO ~ 2016Integrity Check of Sell Roof Associated Structure of HSD WOTS Port Qasim

151Welding Inspection NDT Services at Bahawalpur Distribution Regions

SUI Northern Gas Pipeline Limited ~ 2016

Welding Inspection NDT Services at Bahawalpur Distribution Regions

152 Integrity Assessment of Shell ,Roof and Bottom Tank 407 KTA

Pakistan State Oil ~ 2016 Integrity Assessment of Shell ,Roof and Bottom Tank 407 Keamari Terminal A

153Integrity Assessment of Shell ,Roof and Bottom Tank 413 and 437 KTA Pakistan State Oil ~ 2016

Integrity Assessment of Shell ,Roof and Bottom Tank 413 and 437 Keamari Terminal A

154 Radiography of Tanks at Keemari AL-Noor Terminal ~ 2016 RT of Tanks at Keemari

155 NDT Services at ZOT karachi Pakistan State Oil ~ 2016 TPI/NDT and Visual Inspection of Tank 1901

156 Internal Inspection of Tank PS-1 karachi

PARCO ~ 2016 Internal Inspection of Tank PS-1 Karachi

157 Integrity Assesment of Tanks 413 407 and 437

Pakistan State Oil 2016 Integrity Assesment of Tanks 413 407 and 437

Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Jiangye Changye CHINA

Pakistan Petroleum Limited ~ 2016Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Jiangye Changye CHINA

157Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Hangyang CHINA

Pakistan Petroleum Limited ~ 2016Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Hangyang CHINA

158 TPI / NDT Services at KTB Keemari karachi

Pakistan State Oil ~ 2016 TPI/NDT and Visual Inspection of 302 Tank at KTB Kemari

Page 32: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR

WORK CARRIED OUT

COMPANY EXPERIENCESWORK COMPLETED / EXECUTED BY AIES

159 Radiography Services at SSGC Khadeji

SSGC Applus Velosi 2017 Radiography Services at SSGC Khadeji

160 NDT Services at shikarpur and karachi

Hascol IIW Pvt Ltd 2017 NDT Services at shikarpur and karachi

161 TPI / NDT Services at KTB Keemari karachi

Pakistan State Oil ~ 2017 TPI/NDT and Visual Inspection of 309 Tank at KTB Kemari

162 Radiography services at Kunar Gas Field OGDCL

Pipelink Construction Limited Zishan Engineer 2017 Radiography services at Kunar Gas Field OGDCL

163Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Factory in Pakistan and CHINA

Pakistan Petroleum Limited ~ 2017Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Factory in Pakistan and CHINA Call out 3 Years 2014-2017

164Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Changhong Steel Pipes (Hong Kong)

Pakistan Petroleum Limited ~ 2017Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Changhong Steel Pipes (Hong Kong)

165Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Tianjin Xinyou CHINA

Pakistan Petroleum Limited ~ 2017Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Tianjin Xinyou CHINA

166Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Jiangsu Valin Xigang CHINA

Pakistan Petroleum Limited ~ 2017Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Jiangsu Valin Xigang CHINA

167

Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Zheijiange dewei Stainless Steel CHINA

Pakistan Petroleum Limited ~ 2017Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Zheijiange dewei Stainless Steel CHINA

Page 33: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 34: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

S.No. PROJECT OWNER CONTRACTOR COMPLETION YEAR WORK CARRIED OUT

01 NDT Services at ZOT karachi Pakistan State Oil ~ In Progress TPI/NDT and Visual Inspection of Tank 1902

02TPI / NDT Services at KTA Keemari karachi Pakistan State Oil ~ In Progress

TPI/NDT and Visual Inspection of 428 Tank at KTA Kemari

03 Radiography of Tanks at SITE GRESHAM PVT LTD ~ In Progress RT of Tanks at SITE.

04 Radiography of Tanks at SITE Al-Raheem ~ In Progress RT of Tanks at Kemari

05Radiography of Bullet tanks and different Pipes Byco Refinery IMJ Associates In Progress Radiography of Bullet tanks and different Pipes

06Third Parry Inspection of Line Pipe as per API-5L at Manufacturer Factory in CHINA For Adhi wells

Pakistan Petroleum Limited ~ In ProgressThird Parry Inspection of Line Pipe as per API-5L at Manufacturer Factory in CHINA For Adhi wells

07 RT Services at Kemari Total PARCO PEARL ENGEERING In Progress RT of Tanks at Keamari Terminal

08 Integrity Assessment of Tank 304 and 306 at Keamari Terminal B

PSO ~ In Progress Integrity Assessment of Tank 304 and 306 at Keamari Terminal B

09 Radiography Services of Tanks at Port Qasim

FQM Enterprises EPIC Pvt Ltd Call Out Basis

10 Integrity Assessment of Tank 001,002 and 007 at Sahiwal

PSO ~ In Progress Integrity Assessment of Tank 001,002 and 007 at Sahiwal

11 Viusal and NDT Inspection of all PPL Location call out 2017-2020

Pakistan Petroleum Limited ~ In Progress Visual and NDT Inspection of all PPL Location wells and Plants call out 3 years

12

Third Parry Inspection of Stainless steel Duplex Pipe as per API-5L at Manufacturer Factory in CHINA/PAK For 3 years(2017-2020)

Pakistan Petroleum Limited ~ In ProgressThird Parry Inspection of Stainless steel Duplex Pipe as per API-5L at Manufacturer Factory in CHINA/PAK For 3 years(2017-2020)

13

Third Parry Inspection CRA Line Pipe as per API-5L at Manufacturer Factory in CHINA,INDONESIA and USA.2017-2020

Pakistan Petroleum Limited ~ In ProgressThird Parry Inspection CRA Line Pipe as per API-5L at Manufacturer Factory in CHINA,INDONESIA and USA.2017-2020

COMPANY EXPERIENCESWORK IN PROGRESS / IN HAND

Page 35: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 36: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

LIST OF EQUIPMENT: A complete range of instruments and equipment is available to cater for all aspects of site work in connection with project monitoring and field activity supervision of a construction project.

1) CRACK DETECTION:

• MPI Yoke AC 220V (Adjustable) Complete 02 Nos • MPI Yoke Permanent 01 Nos • Ultraviolet Lights 01 Nos

2) ULTRASONIC TESTING:

• Flaw detector USM 52 01 No • Flaw detector USK 7 01 No • Flaw detector USL 32 01 No • Flaw detector USM 2 01 No • Flaw detector TUD280 01 No • Flaw detector EECI DS322 01 No • Normal Beam Probes 10 Nos • Angle Beam Probes 12 Nos • Test Blocks 05 Nos • Thickness gauging DM2 Thickness meter 02 Nos

3) VISIUAL EXAMINATION:

• Optical Magnifying glasses 02 Nos • Inspection Mirror 02 Nos

4) DIMENSIONAL CONTROL:

• Welding Master Gauge 03 Nos • Welding High Low Gauge 03 Nos • Pit measuring gauges 02 Nos • Screw gauges 02 Nos

Page 37: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

• Vernire calipers 02 Nos • Depth gauges 02 Nos • Micrometer 02 Nos • Dial indicators 10 Nos • Measuring tape 50 Nos • Bevel protector 01 No • Snap gauges 02 Nos

5) COAT AND WARP INSPECTION:

• Holiday detector Complete Sets 02 Nos • Peel adhesion tester 01 No • Coating thickness measuring gauges 01 No

6) RADIOGRAPHY EQUIPMENT:

• Crawler For Pipeline RT 01 No • Gamma Projector up to 100 Cri 05 Nos • Radio Isotopes Iridium 192 04 Nos • Manual Film Processing Unit 08 Nos • Radiation Survey Meter 05 Nos • Densitometer 05 Nos • Beeper (Personnel Alarm Monitor) 020 Nos • Film Viewer 04 Nos • Thermo Luminescent Dosimeter (TLD) 06 Nos. • Direct Reading Dosimeters 08 Nos • Dosimeter Chargers 02 Nos • Coli meters 03 Nos • Long Tongs 03 Nos. • IQI DIN Standard (10 – 16) 50 Nos • IQI DIN Standard (06 – 12) 50 Nos • Film Cassettes with Lead Screen 600 Nos • Film Hangers (Single to 3 Channel) 200 Nos • Dark Room Safe Lights 05 Nos

07) PITLINER EQUIPMENT • Welding Machine 04 Nos • Hot Gun 06 Nos • Vacuum Box 02 Nos

Page 38: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 39: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

HEALTH, SAFETY, ENVIRONMENT Policy (HSE POLICY)

Our long term success depends on our ability to continuously improve our service delivery while protecting our people and the environment in which we work.

It is our policy to:

Provide and ensure a safe working environment, conditions and equipment, coupled with training that will provide our employees with the knowledge and information necessary to safely carry out their assigned duties.

Ensure that our services are performed in such a way as to protect the environment and, where possible, assist clients to do the same.

To meet or exceed our clients’ expectations, the first time and every time, through the application of proven quality principles at all levels of our service delivery process, while being guided by the tenets of our Code of Integrity & Professional Conduct.

We are committed to:

Protecting the health and safety of our employees, customers and third parties.

Protecting our environment and that of the communities where we work and live.

Improving the quality of our services and service delivery. Creating awareness on HSE matters amongst all the employees through

comprehensive programs, with special attention paid to Radiation Safety.

Making execution teams directly responsible for the implementation of HSE program.

Striving for continuous improvement in practices with a focus on minimizing causes of accidents and hazards

The HSE policy will be integrated at all levels and is the responsibility of management with the active support of all our employees.

Page 40: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

Quality Policy

AIES is committed to provide services conforming to International / National Quali ty standards based on applicat ion of Modern Inspection technologies and

techniques; ensuring Customers sat isfact ion, s tr iving for continuous

improvement, and doing right the firs t t ime – assured through an independent

quali ty function.

Page 41: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

ALLIANCE INSPECTION AND ENGINEERING SERVICES

Address: House # MC – 204, Ground Floor, Street # 6, Green Town, Airport, Karachi # 43, 75210 Phone # (92-21) 34580003 Fax # (92-21) 34580016.

Email: [email protected], Web: www.aiespk.com

Page 42: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

MATRIC INTERME-DIATE

DIPLOMA DEGREE OTHERS

01 NASEER AHMED Chief Executive 1984 1986 ~ BE ~

Level III RT (ID # 182225) API 510 Certified Pressure Vessel Inspector (ID # 26180) Level II UT, PT, MT

More than 23 years experience in the field of oil and gas, i.e. Pressure Vessels, Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

02 MUHAMMAD YASEEN

Director / Partner 2002 ~ ~ DAE ~

Level II RT, UT, MT, PT,API 653 (ID# 56340) API 570 (ID# 49345) CSWIP ID # 74546

More than 10 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

03 QI DASHUNINTERNATION

AL QA ENGINEER

BE Level III RT

More than 13years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

04 SHEERAZ ALI QA ENGINEER ~ ~ ~ BE ~ Level II RT More than 3 years experience in the field of oil and gas,

05 TARIQ AHMED TPI /NDT INSPECTOR

DAE Level II RT ,DPT,MT Certified from PNRA

More than 18years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

06 SYED UMAIR SHAH RPO/ADMIN INCHARGE

2002 ~ 2006 DAE/BA/MA

~Level II RT,DPT CERTIFIED FROM PNRA (RPO)

More than 07 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

07 ABDUL HAFEEZ SENIOR TPI/WIR

1990 ~ 1994 ~ ~ Level II RT, DPT Certified from PNRA

More than 18 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, RT Inspection and Interpretation

08 ABDUL REHMAN TPI/WIR INSPECTOR

1990 ~ ~ ~ ~ Level II RT Certified from PNRA

More than 7 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, RT Inspection and Interpretation

09 UMAID ALI TPI/WIR INSPECTOR

~ ~ ~ DAE ~ Level II RT

More than 7 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, RT Inspection and Interpretation

10 AMMAD ABBAS WELDING INSPECTOR

~ ~ ~ DAE ~ CSWIP

More than 05 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

11 ABDUL HANAN TPI/NDT INSPECTOR

2007 ~ 2010 B-TECH ~ Level II RT,MT,DPT Certified from PNRA

More than 7 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, RT Inspection and Interpretation

12 ABDUL WAHAB NDT/WI 2009 ~ 2015 DAE ~Level II RT, UT,MTCertified from PNRA

More than 06 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

13 WASEEM AHMED AWAN

NDT/WELDING INSPECTOR

2006 ~ 2010 B-TECH ~ Level II RT,

More than 05 years experience in the field of oil and gas, i.e. Pressure Vessels, Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

LIST / RESUME OF MANPOWER PERMANENTLY EMPLOYED BY THE COMPANY

S. No. NAME OF THE STAFF DESIGNATION ACADEMIC QUALIFICATIONS (year) PROFESSIONAL

QUALIFICATIONS

EXPERIENCE

Page 43: ALLIANCE INSPECTION AND ENGINEERING SERVICES Profile Updated 2017.pdf · 2019. 7. 21. · iii. Consultancy for approval of LPG facility from OGRA iv. Stage Inspection during construction

14 QAISER ALI TPI/WELDING INSPECTOR

~ ~ ~ DAE ~ Level II RT

More than 06 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

15 KHALID RAZA WELDING INSPECTOR

DAE Level II RT

More than 06 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

16 SAJJAD HUSSAIN WELDING INSPECTOR

~ ~ ~ ~ ~ Level II RT

More than 06 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

17 MUHAMMAD FAHEEM

TPI/WELDING INSPECTOR

~ ~ ~ ~ ~ Level II RT

More than 06 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

18 AMJAD AZIZ RADIOGRAPHER

~ ~ ~ ~ ~ Level II RT

More than 05 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

19 SHAMSUDDIN AHMED

NDT INSPECTOR

~ ~ ~ ~ ~ Level II RT,MT,DPT

More than 16 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

20 MUEED ADNAN RADIOGRAPHER

2002 ~ DAE ~ ~ Level II RT ,DPT,MT Certified from PNRA

More than 05 years experience in the field of oil and gas, i.e. Pipeline, Line Pipe, Storage Tanks, Station Piping, QA / QC.

21 MUHAMMAD AFZAAL

RADIOGRAPHER

~ ~ DAE ~ ~ Level II RT, More than 5 years experience in the field of oil and gas,

22 MUHAMMAD SIDDIQ TECHNICAL ASSISTANT

~ ~ ~ ~ ~ Level I RT More than 2 years experience in the field of oil and gas,

23 MUHAMMMAD IQBAL

TECHNICAL ASSISTANT

~ ~ ~ ~ ~ Level I RT More than 2 years experience in the field of oil and gas,

24 KHALID HUSSAIN TECHNICAL ASSISTANT

2008 2014 DAE ~ Level I RT Certified from PNRA

More than 2 years experience in the field of oil and gas,

25 ASIM TECHNICAL ASSISTANT

~ ~ ~ ~ ~ Level I RT More than 2 years experience in the field of oil and gas,