all ieee 802.3 task force and study groups minneapolis, mn...
TRANSCRIPT
March 2012
Monday, May 14 – Friday, May 18, 2012
All IEEE 802.3 Task Force and Study
Groups
Minneapolis, MN, USA
Hosted by
IEEE P802.3 Interim Session
March 2012
Interim Meeting Venue
• Hilton Minneapolis
– $149 group rate, with complimentary
guest room Internet access
– Reservation cutoff – April 20, 2012
• 12 miles from Minneapolis/
St. Paul airport (MSP):
– $2.25 light rail service
– $17 shared van service
– Taxi approximately $40
• $23/day hotel valet parking, or nearby
$13/day self parking
• Downtown location, one block from
Nicollet Mall – transit and pedestrian-
only dining/shopping area
�
2 Hosted by
March 2012
Hilton Guest Rooms
3
• $149 per night
– Standard king or double/double
• Executive level, $179
• Junior suite, $184
• Room block cutoff date: 20-April, 2012
Hosted by
Standard king Executive king Junior suite
March 2012
Registration Information
• Early Registration before 5pm PST Friday April 27, 2012
– $335 US for attendees staying at the Hilton Minneapolis (HM)
– $635 US for all other attendees (those not registered at HM)
• Late/Onsite Registration after 5pm PST Friday April 27, 2012
– $600 US for attendees staying at the Hilton Minneapolis (HM)
– $800 US for all other attendees (those not registered at HM)
• Meeting Fee Collection
– The Hilton Minneapolis will charge each attendee for his/her meeting fee,
and will provide a separate receipt for the charge
• Cancellation Policy
– If you register for this meeting and then are unable to attend, you must
request cancellation of your registration no later than 5pm PST Friday
May 4, 2012 to avoid incurring a charge for your meeting fee.
4 Hosted by
March 2012
Schedule
5
* These projects will be voted on by the IEEE 802.3 Ethernet Working Group on Thursday, 15 - March
Date Group Contact Duration
Monday,
14-May
IEEE P802.3.1 Ethernet MIB Task Force Howard Frazier All day
IEEE 802.3 Industry Connections Ethernet Bandwidth Assessment
Ad Hoc John D'Ambrosia 13:00- 18:00
Tuesday,
15-May
Next Generation 100Gb/s Optical Ethernet Study Group Dan Dove All day
EPON PHY for Copper Study Group Howard Frazier All day
Reduced Pair 1Gb/s Ethernet* Steve Carlson All day
Wednesday,1
6-May
Next Generation 100Gb/s Optical Ethernet Study Group Dan Dove All day
EPON PHY for Copper Study Group Howard Frazier All day
Reduced Pair 1Gb/s Ethernet* Steve Carlson All day
Thursday,
17-May
P802.3bj 100 Gb/s Backplane and Copper Study Group John D'Ambrosia All day
Extended EPON Study Group Marek Haiduczenia All day
IEEE 802.3 Maintenance Standing Task Force Wael Diab All day
Ethernet WDM Aggregation Network* Duane Remien All day
MAC Services in Support of Frame Pre-emption* Mike Grimwood All day
Friday,
18-May
P802.3b100 Gb/s Backplane and Copper Study Group John D'Ambrosia All day
Extended EPON Study Group Marek Haiduczenia All day
IEEE 802.3 Maintenance Standing Task Force Wael Diab All day
Ethernet WDM Aggregation Network* Duane Remien All day
MAC Services in Support of Frame Pre-emption* Mike Grimwood All day
Hosted by
March 2012
Minneapolis, Minnesota
6 Hosted by
March 2012
IEEE 802.3 Interims
7
http://www.ieee802.org/3/interims/index.html
Hosted by
March 2012
Hilton Minneapolis
8
• Comfortable public spaces
Hosted by
March 2012
Hilton Amenities
9
• Large meeting rooms and foyers
• Full service facilities
Hosted by