8/7/2019 Ais Present New
1/21
-
8/7/2019 Ais Present New
2/21
Aims of theAims of the
preliminarypreliminary
investigationinvestigation
phasephase
-
8/7/2019 Ais Present New
3/21
Things must be done during theThings must be done during the
preliminary investigation phasepreliminary investigation phase
Determined the true nature of theDetermined the true nature of theproblem.problem.
Establish the scope of the problemEstablish the scope of the problem
Setting the project goalSetting the project goal
-
8/7/2019 Ais Present New
4/21
1) Determined the true nature of the problem.1) Determined the true nature of the problem.
The company needs to solve the problems not theThe company needs to solve the problems not thesymptomssymptoms
-
8/7/2019 Ais Present New
5/21
2) Establish the scope of the problem2) Establish the scope of the problem
With scope been establishing the company will stayWith scope been establishing the company will staywithin budget and schedule.within budget and schedule.
The user and the development team need to agree onThe user and the development team need to agree onthe same scope.the same scope.
The scope will identify any part of the system need toThe scope will identify any part of the system need tobe changed or outside its control.be changed or outside its control.
-
8/7/2019 Ais Present New
6/21
3)3) Setting the project goalSetting the project goal
To ensure the right problem been solve and theTo ensure the right problem been solve and the
company is working that contribute to thecompany is working that contribute to theorganizations effectiveness.organizations effectiveness.
Need to be developed within the practical bounds ofNeed to be developed within the practical bounds ofthe companythe company
Identification of deficiencies in the existing system alsoIdentification of deficiencies in the existing system alsocan be use.can be use.
-
8/7/2019 Ais Present New
7/21
Cost-benefit analysis is the process ofcomparing the anticipated costs of an
information system to its anticipated benefits.
It is done to determine how well, or how
poorly, a planned action turned out.
-
8/7/2019 Ais Present New
8/21
TangibleTangible IntangibleIntangible DirectDirect
IndirectIndirect FixedFixed VariableVariable
-
8/7/2019 Ais Present New
9/21
TangibleTangible
IncreaseIncrease revenuesrevenues ReduceReduce costcost
IntangibleIntangible
-
8/7/2019 Ais Present New
10/21
Analysis undertaken to determine whether ornot system request is worthy for further
consideration
TechnicalTechnical OperationalOperational
EconomicEconomic ScheduleSchedule
-
8/7/2019 Ais Present New
11/21
Gantt ChartGraphical tool for project management that
represents project tasks over time as a bar chart.
-
8/7/2019 Ais Present New
12/21
ClarityClarityTimeTime
ManagementManagement
EfficiencyEfficiency CoordinationCoordination
-
8/7/2019 Ais Present New
13/21
Changes to the scheduleChanges to the schedule
Estimates must be completed firstEstimates must be completed first
Maintained and updated all the timeMaintained and updated all the time
Only suitable for smaller projectsOnly suitable for smaller projects
-
8/7/2019 Ais Present New
14/21
Microsoft Office Project providesMicrosoft Office Project providesenhanced tools to help you track andenhanced tools to help you track andcontrol project work, schedules, andcontrol project work, schedules, andfinances.finances.
Help the organization gain betterHelp the organization gain bettercontrol across all projects.control across all projects.
The most appropriate projectThe most appropriate projectmanagement software to be used bymanagement software to be used bythe company is Microsoft Projectthe company is Microsoft Project
-
8/7/2019 Ais Present New
15/21
1) Poorly specified system requirement1) Poorly specified system requirement
Mistake in identifying problems and needsMistake in identifying problems and needs
Pressure to get job donePressure to get job done
-
8/7/2019 Ais Present New
16/21
2) Ineffective development techniques2) Ineffective development techniques
Using ancient tools (pencil, paper)Using ancient tools (pencil, paper)
Ineffective documentation, presentation andIneffective documentation, presentation andmodificationmodification
3) Lack of user involvement in system development3) Lack of user involvement in system development
Users fail to give feedback and coUsers fail to give feedback and co--orperationorperation
No participation during development lead to lack ofNo participation during development lead to lack ofcommitment when implementedcommitment when implemented
-
8/7/2019 Ais Present New
17/21
4) Other side4) Other side
Lack of support from senior managementLack of support from senior management Not familiar with the new technologyNot familiar with the new technology
External factor (government issues)External factor (government issues)
-
8/7/2019 Ais Present New
18/21
AA systematicsystematic approachapproach useuse ofof computercomputer--basedbased
supportsupport inin thethe softwaresoftware developmentdevelopment processprocess
AssistsAssists inin Planning,Planning, Analyzing,Analyzing, Designing,Designing,
ProgrammingProgramming andand MaintaningMaintaning informationinformation systemsystem..
-
8/7/2019 Ais Present New
19/21
ADVANTAGESADVANTAGES
It offer an integrated packages ofIt offer an integrated packages of
capabilities for several of these taskscapabilities for several of these tasks Commercial software products consisting ofCommercial software products consisting of
highly integrated applications thathighly integrated applications that effectiveeffectivefor large scale systems and projectsfor large scale systems and projects
-
8/7/2019 Ais Present New
20/21
ADVANTAGESADVANTAGES
save time and fastsave time and fast
Tools improve quality and productivity ofTools improve quality and productivity ofsoftwaresoftware
Tools reduce the time for error correctionTools reduce the time for error correctionand maintenance.and maintenance.
Tools provide clear readability andTools provide clear readability andmaintainability of the system.maintainability of the system.
-
8/7/2019 Ais Present New
21/21