    Aims of theAims of the

    preliminarypreliminary

    investigationinvestigation

    phasephase

  • 8/7/2019 Ais Present New

    3/21

    Things must be done during theThings must be done during the

    preliminary investigation phasepreliminary investigation phase

    Determined the true nature of theDetermined the true nature of theproblem.problem.

    Establish the scope of the problemEstablish the scope of the problem

    Setting the project goalSetting the project goal

  • 8/7/2019 Ais Present New

    4/21

    1) Determined the true nature of the problem.1) Determined the true nature of the problem.

    The company needs to solve the problems not theThe company needs to solve the problems not thesymptomssymptoms

  • 8/7/2019 Ais Present New

    5/21

    2) Establish the scope of the problem2) Establish the scope of the problem

    With scope been establishing the company will stayWith scope been establishing the company will staywithin budget and schedule.within budget and schedule.

    The user and the development team need to agree onThe user and the development team need to agree onthe same scope.the same scope.

    The scope will identify any part of the system need toThe scope will identify any part of the system need tobe changed or outside its control.be changed or outside its control.

  • 8/7/2019 Ais Present New

    6/21

    3)3) Setting the project goalSetting the project goal

    To ensure the right problem been solve and theTo ensure the right problem been solve and the

    company is working that contribute to thecompany is working that contribute to theorganizations effectiveness.organizations effectiveness.

    Need to be developed within the practical bounds ofNeed to be developed within the practical bounds ofthe companythe company

    Identification of deficiencies in the existing system alsoIdentification of deficiencies in the existing system alsocan be use.can be use.

  • 8/7/2019 Ais Present New

    7/21

    Cost-benefit analysis is the process ofcomparing the anticipated costs of an

    information system to its anticipated benefits.

    It is done to determine how well, or how

    poorly, a planned action turned out.

  • 8/7/2019 Ais Present New

    8/21

    TangibleTangible IntangibleIntangible DirectDirect

    IndirectIndirect FixedFixed VariableVariable

  • 8/7/2019 Ais Present New

    9/21

    TangibleTangible

    IncreaseIncrease revenuesrevenues ReduceReduce costcost

    IntangibleIntangible

  • 8/7/2019 Ais Present New

    10/21

    Analysis undertaken to determine whether ornot system request is worthy for further

    consideration

    TechnicalTechnical OperationalOperational

    EconomicEconomic ScheduleSchedule

  • 8/7/2019 Ais Present New

    11/21

    Gantt ChartGraphical tool for project management that

    represents project tasks over time as a bar chart.

  • 8/7/2019 Ais Present New

    12/21

    ClarityClarityTimeTime

    ManagementManagement

    EfficiencyEfficiency CoordinationCoordination

  • 8/7/2019 Ais Present New

    13/21

    Changes to the scheduleChanges to the schedule

    Estimates must be completed firstEstimates must be completed first

    Maintained and updated all the timeMaintained and updated all the time

    Only suitable for smaller projectsOnly suitable for smaller projects

  • 8/7/2019 Ais Present New

    14/21

    Microsoft Office Project providesMicrosoft Office Project providesenhanced tools to help you track andenhanced tools to help you track andcontrol project work, schedules, andcontrol project work, schedules, andfinances.finances.

    Help the organization gain betterHelp the organization gain bettercontrol across all projects.control across all projects.

    The most appropriate projectThe most appropriate projectmanagement software to be used bymanagement software to be used bythe company is Microsoft Projectthe company is Microsoft Project

  • 8/7/2019 Ais Present New

    15/21

    1) Poorly specified system requirement1) Poorly specified system requirement

    Mistake in identifying problems and needsMistake in identifying problems and needs

    Pressure to get job donePressure to get job done

  • 8/7/2019 Ais Present New

    16/21

    2) Ineffective development techniques2) Ineffective development techniques

    Using ancient tools (pencil, paper)Using ancient tools (pencil, paper)

    Ineffective documentation, presentation andIneffective documentation, presentation andmodificationmodification

    3) Lack of user involvement in system development3) Lack of user involvement in system development

    Users fail to give feedback and coUsers fail to give feedback and co--orperationorperation

    No participation during development lead to lack ofNo participation during development lead to lack ofcommitment when implementedcommitment when implemented

  • 8/7/2019 Ais Present New

    17/21

    4) Other side4) Other side

    Lack of support from senior managementLack of support from senior management Not familiar with the new technologyNot familiar with the new technology

    External factor (government issues)External factor (government issues)

  • 8/7/2019 Ais Present New

    18/21

    AA systematicsystematic approachapproach useuse ofof computercomputer--basedbased

    supportsupport inin thethe softwaresoftware developmentdevelopment processprocess

    AssistsAssists inin Planning,Planning, Analyzing,Analyzing, Designing,Designing,

    ProgrammingProgramming andand MaintaningMaintaning informationinformation systemsystem..

  • 8/7/2019 Ais Present New

    19/21

    ADVANTAGESADVANTAGES

    It offer an integrated packages ofIt offer an integrated packages of

    capabilities for several of these taskscapabilities for several of these tasks Commercial software products consisting ofCommercial software products consisting of

    highly integrated applications thathighly integrated applications that effectiveeffectivefor large scale systems and projectsfor large scale systems and projects

  • 8/7/2019 Ais Present New

    20/21

    ADVANTAGESADVANTAGES

    save time and fastsave time and fast

    Tools improve quality and productivity ofTools improve quality and productivity ofsoftwaresoftware

    Tools reduce the time for error correctionTools reduce the time for error correctionand maintenance.and maintenance.

    Tools provide clear readability andTools provide clear readability andmaintainability of the system.maintainability of the system.