aiesec ftu hcm_ogcdp_r&r application_ignite 2014
TRANSCRIPT
AIESEC FTU HCMC| 01.07.2013 – 30.06.2014
Criteria Score AchievedMaterialattached
Quality Standards Check list made and followed 1 1
EP Buddy JD defined and implemented 1 1
iSOS Service is implemented and used for all Eps 1 1
Insurance or Visa Partnership done or used 2 2 (newsletter)
All cases addressed and closed with comments 2 2
OPS and CPS conducted for 90% Eps(Specify number of attendees) 2
OPS and CPS conducted 2 2 Reports
2 LEADs Organized3 3
(engaged in OPS and CPS)
At least 1 Newsletter sent for each engagement phase(4 newsletters) 3 3 Links
Total 15
Here
Here
Here
Event (OPS + LEAD)Welcome EP:
Provide EP with information of program, process and XPP
Smart matching day
Training of email, application, interview… to ensure
matching capacity
Event (CPS + LEAD)
Regional LEAD day:
Training of personal goal setting, teamwork…
Cultural preparation:
Training of cross-cultural preparation, culture-shock…
Newsletters link
• Pre-raise: http://us3.campaign-archive1.com/?u=2e87600fa4fe303f3dc20f547&id=83fd575c43
• Raise2Match: http://us8.campaign-archive2.com/?u=598c2285ca199776eea57825f&id=26848e0958&e=
• Match2Realize: http://us3.campaign-archive1.com/?u=2e87600fa4fe303f3dc20f547&id=b78c747a6e
• Realization:
Malaysia: http://us3.campaign-archive2.com/?u=2e87600fa4fe303f3dc20f547&id=aaa2af352f
India: http://us3.campaign-archive1.com/?u=2e87600fa4fe303f3dc20f547&id=b36624dc67
Criteria Score Achieved Note
All forms on podio workspace have an allotted status 1 1 Click here
Match 2 Realize App have 90% of EPs registered 3 3 Click here
IR survey App to get details from LCs 3 0
oGCDP Partnerships app to save all partnerships done 3 3 Click here
All EP Data from national ORS and OP is addressed 2 0
All Audits since january are filled completely on time 2 2Completely filled the audit in March
OGX Experience tracker updated 1 1Updated in every national OGX meeting
National OGX meeting attended(May and June) *1 1+1 2+1 for each meetingattended
Total 12
Criteria Score AchievedMaterial attached
All EPs needs to be updated in national search tool with relevant details
2 2
EP Searchtool is updated within 48 hours of new TNs/partnership announcement
1 1
Partnership Framework and co-delivery checklist is made between partnering entities
2 2
EP Profile generated for your LC and used 1 1
Total 6
Here
Here
Criteria Score Achieved Note
80% Eps matched through National Partnerships
8 0 10 out of 50 EPs match through national Partnership
80% attendance of representatives in matching manias and power hours
2 2 Attended all 12 matching manias and power hours
SU and expansions achieve target promised 3 0 SUs did not achieved goal but still grow at least 30% each SU
More than 90% of planned EPs realized (RE) 5 0 Achieved only 59% Goal according to OGX experience tracker but grow 45% compare
to last year
More than 90% of planned EPs Matched (MA) 5 5 Achieved 123% Goal according to OGX experience tracker and grow 56% compare
to last year
< 80% Raise target achieved as per plans 2 2 Achieved only 76% Goal according to OGX experience tracker but grow 37% compare
to last year
Total 9
Criteria Score AchievedMaterial attached
Issue Based Sub Product(Brand Packaging) promoted 1 1
90% stories generated from Winter peak 2 2 Stories collection
10 stories submitted for Showcasing Platform from LC 2 2
Innovative Posters and Message 2 2
Year Long Promotions conducted for registrations 2 2 (Our fanpage)
Activeness on commission (Reply to mails/ Confirmations/ Sharing stories, experiences)
5 5
Innovations and Initiatives with results 5 5
Total 19
Here
Here
Here
Here
Global Citizen Posters and Messages:
1. Ensure matching efficiency: Smart matching day
2. Ensure quality of services: CEM map implementation
3. Ensure Leadership development for Eps: Development plan for EPs
4. Promotion event to convert more students and recognize returnees:•Cultural Exchange Day•StoriesVenture
5. Internal communication channel for EP
1. Ensure matching efficiency: Smart matching dayIn smart matching day, we aim to enhance our EP’s competitiveness in EP pool when they apply for projects.
We invited our VP iGCDP and VP MarCom to deliver the sessions to help EP:
- Make their application outstanding
- Prepare for interview with TN managers
- Utilize all channels to get a quick match
Results:14/20 attendants of the event get “matched” in the next 2 weeks
Event report:Here
We have draft a CEM map and question list to find out touchpoints that Eps have negative feelings to remove the detracting factors.
2. Ensure quality of services: CEM map implementation
3. Ensure Leadership development for Eps: Development plan for EPsEP and buddy together will do a development plan so that EP has clear direction of development and we can ensure leadership experience through exchange.
Collection: Here
4. Events:
Cultural Exchange Day: Branding event for Global Citizen Program with a Global Village and small workshops(Result: AF: 40 – Ra: 9)
StoriesVenture: Welcome and recognize returnees, this is the space where they can share their stories to others and to students interested in the program.
4. Events:
5. Internal communication channel for EP:
We have several communication channels with Eps:
- Newsletter: to inform important news and enhance engagement of EP with AIESEC generally
- Matching guideline: In this channel we have:
• Instruction to prepare EP with matching process
• Updates and promote projects of LC partnership and MC partnership
• Information package: VISA, Travelling, Countries culture …
- Facebook group: to keep connection with Eps and enhance EP‘s connections, raise their spirit and give recognition to EPs
Dear AIESEC FTU HCMC,
Hey guys! I’m Nguyen Thi Kim Thuan and I’m spending mytime in Indonesia now which means this is my exchanged trip.By writing this letter I want to send my deepest thank you toAIESEC FTU HCM and everyone who helped me to have thischance to come here, Indonesia, and enjoy this trip. […]
At the present, I’m in Indonesia, which is not my expecteddestination but I learned to be flexible so choosing this countrywith a Health care project was my decision. This project isfuckin awesome as I have tons of friends living around me; thekids are so nice and lovely; no comment for theaccommodation. By the way, I love this country except thetraffic jam but I’m getting used to it, and I know it gonna be aneasy thing to me.
Once again, I cannot say my all of my time when I was inAIESEC was full of happy time but I have experienced, enjoyedand changed myself a lot. Day by day is full of challenges andI’m ready to face them. Thank you so much guys!
Best regards,
Nguyen Thi Kim Thuan
July 2014
[...] Within relatively short time, Shanghai has ameliorated my perspectives towards environment as well as my global prospect in such unexpectedly remarkable way. The first two weeks working as a real farmer at BioFarm is one of the most unique experiences I have ever been through in my life. As I learned how to and why we should do organic farming, I gradually felt the strong connection between human and nature, rekindling the forgotten attitude in me: respecting the environment. […]Shanghai was the place I met my incredible team: Green Power Now Shanghai 2014, Aiesec SJTU. Five interns from five different countries merging into the entire Aieser SJTU family have created the one and only Green Power Now family. It was Shanghai that gave us endless experiences which brought us closer to each other days by days. I was and always be proud of being a part of this culturally diverse family; together we overcame difficulties to reach mutual goals, together we created unfadable memories in; together we connected our countries. In Shanghai, I have found the most brilliant friends who are now my lifetime buddies.One again, thank you for completing me, Shanghai.
Than Ho Lan ChiJune 2014
Summary
Customer experience management
Information management
International Relations management
Goal management
Innovations and Initiatives
Total:
15
12
6
9
19
61/100
AIESEC FTU HCMC| 01.07.2013 – 30.06.2014