ahmed fathy cv

7
Ahmed Fathy Mohamed PERSONAL INFORMATIONS Date of Birth: 07/05/1979 Nationality: Egyptian. Permanent address: Elmaahad Eldiny Street, Ain shams, Cairo, Egypt Tel: +202 21874710 Cell phone: +2 0100 20 95 761 Email: [email protected] Marital Status: Married. Military status: Completed EDUCATION (1996-2001) Helwan university (graduation grade: good) Faculty of engineering electrical power department LANGUAGE SKILLS Arabic: Mother Tongue English: Excellent (written, reading & spoken) SUMMARY OF QUALIFICATIONS I am fast leaner and I have the ability to work under pressure and meet deadlines, also I have high presentation and communication skills and have ability to take decisions under pressure and ability to lead a team and work in group to meet the job requirements. EXPERIENCE From July 2014 till Now Company: Reliance Heavy Industry (RHI) Job title: Senior Electrical Engineer Scope of work : Tender Documents Preparation, Invitation and instructions to bidders, Setting the criteria and procedures for evaluation of suppliers and contractors Page 1

Upload: ahmed-fathy

Post on 10-Aug-2015

51 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ahmed Fathy CV

Ahmed Fathy Mohamed

PERSONAL INFORMATIONS

Date of Birth: 07/05/1979Nationality: Egyptian.Permanent address: Elmaahad Eldiny Street, Ain shams, Cairo, EgyptTel: +202 21874710Cell phone: +2 0100 20 95 761Email: [email protected] Status: Married.Military status: Completed

EDUCATION (1996-2001) Helwan university (graduation grade: good) Faculty of engineering electrical power department

LANGUAGE SKILLS

Arabic: Mother TongueEnglish: Excellent (written, reading & spoken)

SUMMARY OF QUALIFICATIONSI am fast leaner and I have the ability to work under pressure and meet deadlines, also I have high presentation and communication skills and have ability to take decisions under pressure and ability to lead a team and work in group to meet the job requirements.

EXPERIENCEFrom July 2014 till Now

Company: Reliance Heavy Industry (RHI) Job title: Senior Electrical Engineer Scope of work :

Tender Documents Preparation, Invitation and instructions to bidders, Setting the criteria and procedures for evaluation of suppliers and contractors

Tenders evaluation and negotiations including detailed analysis of bids received, guarantee and performance testing conditions evaluation, study of vendors and sub-vendors and sub-contractor's list to ensure quality of deliverables.

Projects technical specification preparation Electrical design review for basic and details engineering for all electrical and

instrumentations items such as single line diagram, power demand calculation, consumer list, sensor list, cable list, instruments flow sheet,earthing and lightning calculations, electrical panels details engineering,…..etc.

Purchase documents review for all electrical equipment such as cables, motors, switchgears, variable frequency drives, transformers, diesel generators,…etc.

Page 1

Page 2: Ahmed Fathy CV

Clients and projects

El Arish Cement Factory (GOE) line 3&4 Wadi El Nile Cement Factory new coal mill Sinai Cement Factory new coal mills South Valley cement Factory new coal mill

From Jan 2013 till July2014

Company: Orascom Construction Industries in Iraq (OCI) Job title: Lead Electrical QA/QC engineer Project: Baiji Power plant (6x160MW) Iraq

Scope of work :

Prepare Inspection and testing plan (ITP) and check sheets for all electrical and instrumentation activities

Materials verifications according to drawing sand project standards and codes. Monitoring on daily site work and Submit daily reports and documents of activities to

QA/QC Manager Work planning and progress follow up Preparing the commissioning schedule and follow up the commissioning activities Review the sub-contractors submitted invoices according to the completed tasks Issuing the NCR for any non-conformance Prepare the turn over package to the client Follow up the electrical quality team Site construction and technical supervision for the electrical installation activities such

as power transformer 220MVA and distribution transformer 10MVA, switchgears, field instrumentations, I/O panels, black start diesel generators, start-up transformers, gas turbine skids and instrumentations, 400KV GIS 8 Bays and transmission, cable laying and termination, lighting and earthing,…etc.

From January 2010 till December 2012

Company: Orascom Construction Industries in Algeria (OCIA) Job title: Senior Electrical QA/QC engineer Project: Sorfert fertilizer complex ammonia/urea (Algeria)

Scope of work :

Prepare Inspection and testing plan (ITP) and check sheets for all electrical and instrumentation activities

Materials verifications according to drawing sand project standards and codes. Monitoring on daily site work and Submit daily reports and documents of activities to

QA/QC Manager Work planning and progress follow up Preparing the commissioning schedule and follow up the commissioning activities Review the sub-contractors submitted invoices according to the completed tasks Issuing the NCR for any non-conformance Prepare the turn over package to the client Site construction and technical supervision for the electrical installation

activities such as GIS 60KV and underground cable installation and testing, power and distribution transformer up to 30MVA, neutral ground resistor, LV and MV

Page 2

Page 3: Ahmed Fathy CV

switchgears, MV and LV motors, variable frequency drives, UPS, Battery chargers, field instruments (pressure,tempreture,levels,…etc.) transmitters and indicators,...etc.

Perform field inspection and testing according to ICAPS system (Integrated Commissioning and Progress system)

From May 2007 till January 2010

Company: Bureau Veritas Egypt (BV Egypt)Division: Inspection and verification services IVS department Job title: Senior Electrical inspection engineer

Scope of work :

Cables (LV, MV cables up to 30KV) inspection FAT test as 3rd party according to IEC60502-2

Check the electrical resistance of the conductor Partial discharge test Power frequency test voltage Sample test including conductor examination and dimension, hot set test and

voltage test and voltage test Tan δ test and impulse test

Clients and projects

Petrofac company (Khalda Gas Plant) New Doha airport Aramco petroleum company Degremont (Elgabal el Asfar) Orascom Construction Industries (Sorfert project algeria) Saint gobain glass factory

MV Switchgear inspection FAT test as 3rd party according to IEC62271-200

Visual check for the component according to the design documents Di-electric test on auxiliary and control voltage Power frequency withstand voltage test Mechanical operation test by verifying the switching devices, interlocking and

withdrawable parts 5 times Contact resistance test for CB Perform CT and VT testing Function test for switchgear according to the wiring diagram

Clients and projects

Odebrecht company (Doraleh container terminal project)

Page 3

Page 4: Ahmed Fathy CV

Orascom Construction Industries (Sorfert project Algeria) Degremont (Elgabal el Asfar project)

HV air Circuit breaker inspection FAT test as 3rd party

Visual check for the component according to the design documents Five times closing and tripping at rated, 110% and 85% of rated voltage Check close and tripping time Contact resistance measuring Check SF6 gas pressure values at normal, alarm and trip functions Power frequency test

Clients and projects

Iberdrola company (Kuraymat project)

Electrical installation, start up and commissioning as 3rd party

Check the installation and testing of the all electrical systems

Clients and projects

Bell Egypt factory IBIS hotel (Muscat,Oman) Movinpic Jeddah (Saudi Arabia) SEEI Company : ( El Zeina Factory at 10th of Ramadan) Schlumberger (Western Geco facility ) Cepsa petroleum company (Administration building) Coca-Cola company (Administration building) Multinational force &observers camps sinai (MFO) Palm hills project (6th of October)

From October 2002 till May 2007

Company: Asec Automation (ASA) Division: Technical department Job title: Electrical design, start-up & commissioning engineer

Scope of work :

Low voltage switchgear, marshalling and PLC panels design

Prepare the load list for the low voltage switchgears Prepare the signal list according to the flow sheet and the interface local panels Prepare the technical purchasing order for the required material Preparing the single line diagram and control diagram

Page 4

Page 5: Ahmed Fathy CV

FAT (Factory acceptance) test for panels

Visual check for the panel dimension, materials, rating of CB and labels identification.

Perform the DC insulation test for the panels Function check for the panel according to the wiring diagram Prepare the as manufacturing documentations

Testing, Commissioning and start up

Testing for (LV,MV) Cables by continuity check, insulation test and HI-POT testing for the MV cables

Performing the signal test and loop check for all consumers, instruments and local panels

Testing the distribution transformers (2500 KVA, 8 MVA & 10 MVA) by performing the visual check, turns ratio, vector group, no load test, winding resistance, Meggering test and function check for all interface signals from the transformer instruments

Testing the LV & MV switchgear by performing Visual check, wiring check, bus bar torqueing, mechanical check for movable parts, check all mechanical interlock, check the interchangeability, check the CT ratio and direction, Check VT ratio and polarity and check the protection relays

Testing (LV,MV) motors by performing insulation check, signal test at test position and cold run for the motors

Testing and start up for LV variable frequency drives and soft starter

Clients and projects

Cement mill 2 upgrading (Lafarge cement factory, Amman, Jordan) Cement mill upgrading (Lafarge cement factory, rashadeyah, Jordan) Crusher upgrading (Lafarge cement factory, rashadeyah, Jordan) New cement silo (Sinai white cement factory) Russian compressor upgrading (Assuit cement factory) Cement mill 7 & 8 upgrading (Assuit cement factory) Water pump station line 1 upgrading (Assuit cement factory) Kiln increase capacity line 3 (Assuit cement factory) Line 1 upgrading (Ammreyah cement factory)

Page 5