ahmed-el-shouny2016

5
Eng. Ahmed El shouny Day of birth: 8/15/1980 21463 00966540500795 [email protected] married Work experience Nov2014 - now Project Manger SAUDI BINLADIN GROUP (SBG) Responsibilities: Agreeing project objectives Making sure the quality standards are met developing the programme of work and strategy for making the project happen planning ahead to prevent problems on site before they occur, for example, planning the delivery and storage of equipment and materials organizing the various professional people working on a project taking care about Implementation of safety and security at site Jan2012 - Nov2014 Construction Manager SAUDI BINLADIN GROUP (SBG) Responsibilities: Review Shop drawing and Coordination drawing. Materials orders for site. Follow up Concrete Work. Make weekly work schedules. Site supervision and man power control. Speed up the site woke to achieve the project planning requirement. Ensure the quality of work elements.

Upload: ahmed-samir

Post on 20-Jan-2017

13 views

Category:

Documents


0 download

TRANSCRIPT

Eng. Ahmed ElshounyDay of birth: 8/15/1980

21463

00966540500795

[email protected]

married

Work experience

Nov2014 - nowProject Manger

SAUDI BINLADIN GROUP (SBG)

Responsibilities:

Agreeing project objectives

Making sure the quality standards are met

developing the programme of work and strategy for making the project happen

planning ahead to prevent problems on site before they occur, for example, planning the delivery and storage of equipment and

materials

organizing the various professional people working on a project

taking care about Implementation of safety and security at site

Jan2012 - Nov2014Construction Manager

SAUDI BINLADIN GROUP (SBG)

Responsibilities:

Review Shop drawing and Coordination drawing.

Materials orders for site.

Follow up Concrete Work.

Make weekly work schedules.

Site supervision and man power control.

Speed up the site woke to achieve the project planning requirement.

Ensure the quality of work elements.

April2011 - Jan2012Construction Manager

SAUDI BINLADIN GROUP (SBG)

Responsibilities:

The project consists of main villa two floors 10000 M2, reception villa

2700 M2 and Service buildings 3000 M2

Review Shop Drawing and Quantity Survey for all items

Materials orders for all elements.

Revise contracts for all subcontractors with the site condition before starting in work.

Speed up the site work on as much as possible to achieve the project requirement.

Control that is applied all quality standards.

April2010 - April2011Project Engineer

SAUDI BINLADIN GROUP (SBG)

Responsibilities:

Site supervision and man power control.

Handing over the inspection with the consultant.

Check and approve the payment for all subcontractors.

Speed up the site work to achieve the project requirement.

April2008 - Feb2010Senior Technical office Engineer

Beijing Emirates Construction

Responsibilities:

A) Technical

Shop drawing and Coordination drawing

Materials take off

Site invoice to the owner.

Prepare the payment for all subcontractors.

Revise contracts for all subcontractors with the site condition before starting in work.

Aug2007 - April 2008

Project EngineerSAIC

Responsibilities:

A) Site

Follow up all finishing Works

Site coordination with all MEP subcontractors.

Site supervision and man power control.

Speed up the site woke to achieve the project planning requirement.

B) QA/QC

Handing over the inspection with the consultant.

Checking the work finished and comparing it with the aimed planned program.

Oct2005 - Jun2007Project Engineer

AL-RAJHI DEVELOPMENT CO

Responsibilities:

A) Technical

Shop drawing and Coordination drawing

Materials take off

B) Site

Follow up all Civil works, Concrete items, finishing items and landscape &road works in the hospital

Site coordination with other trades.

Site supervision and man power control.

Speed up the site woke to achieve the project planning requirement.

C) QA/QC

Handing over the inspection with the consultant.

Checking the work finished and comparing it with the aimed planned program

Dec2002 - Sep2005Site Engineer

Alexandria Construction Company –Talaat Mustafa –El Rehab City-New Cairo

Responsibilities:

A) Site

Follow up all Civil works, Concrete items, finishing items

Site coordination with other trades.

Site supervision and man power control.

B) QA/QC

Handing over the inspection with the consultant.

Checking the work finished and comparing it with the aimed planned program

Other professional experiences, references

I have very good experience in finishing work and concrete works. Surveying the quantity of each project item

. I have good experience on roads works, survey work. Soil mechanics (soil exploration, soil tests)

Education

1997 - 2002Tanta University, 2002

Bachelor of Civil Engineering

Certificates and Courses

Course at Al-Ahram management computer centerAutocad (2d, 3d, programming) &• Office (word. excel)

Occupational Safety and Health courseOccupational Safety and Health course 30 hours construction (NASP)

Project Management professional and PMP exam preprationAttending and successfully completed Project Management professional and PMP exam prepration

Other skills and abilities

Language proficiency

Arabic

English

Driver's licenseGroups A

Other skills and abilities:I can work under pressure and able to work with different cultures

I have 14 years experience

Created by CV generator IQresume.com