Page 1: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

1

Page 2: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

2

AHANTA WEST DISTRICT ASSEMBLY

2013 ANNUAL PROGRESS REPORT

1.0 Introduction

The District Monitoring and Evaluation Team (DMET) within the District Planning

Coordinating Unit (DPCU) in the year under review monitored and evaluated the implementation

of Development Policies, Programmes and Projects as outlined in the District Medium Term

Development Plan (DMTDP). In doing this, the DPCU collaborated with Communities,

Government Agencies, Non-Governmental Organizations and other Civil Society Groups in the

District. The DMET instituted an effective and efficient system for tracking the processes of

development activities and projects captured in the DMTDP and other socio-economic

interventions in the entire District. This enabled the generation of timely reports that are reliable

and contain vital information required by the National Development Planning Commission

(NDPC) and the other relevant stakeholders for submission through the Western Regional

Planning Coordinating Unit (RPCU) to the Central Government Agencies to make the right

policies.

The main objective of M&E was to ascertain the level of achievements in the implementation of

development policies, programmes and projects that the District embarked for the year 2013 in

the DMTDP. Again, another objective was to assess whether the programmes and projects

objectives stated are still relevant as well as finding out the reasons for not achieving the stated

objectives.

The major problem was untimely release of needed information from the decentralized

departments.

Page 3: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

3

1.1 Status of DMTDP

Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The

DMTDP is in its final year of implementation after the 2013 development budget was approved

and adopted by the General Assembly. The final copies of the DMTDP have since been sent to

NDPC and RPCU. In order to implement all the planned policies, programmes and projects in

the DMTDP during the planned period, the D.A must be proactive in terms of its revenue

generation internally and sourcing for adequate funds from the Central Government and other

Development Partners.

2.0 Monitoring and Evaluation Activities Report

The M&E Activities Report includes the following programmes and projects status for the year,

update on disbursements from funding sources as well as update on indicators and targets. Others

include update on Critical Development and Poverty Issues and Participatory M&E.

2.1 Programmes/Projects status for the year

A total of Fifty-Five (55) projects were undertaken in the year under the review. Out of the 55

projects, 31 of them representing 56.4 percent were physical projects. Out of these 31 projects, 6

projects representing 19.4 percent have been completed and are yet to be handed over. The

remaining Twenty-Five (25) representing 80.6 percent are still ongoing and far advanced to be

completed within the current year all things being equal. From the foregoing analysis, one can

conclude that most of the projects are behind schedule. The tables 1 and 2 below represent

details of physical and non-physical projects.

Page 4: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

4

Table 1. MONITORING OF DEVELOPMENT PROJECTS AS AT 31ST DECEMBER, 2013 REPORT

(DISTRICT WIDE)

PROJECT

NAME

LOCATION SECTOR CONTRAC

T SUM

GH¢

SOURCES

OF FUND

CONTRACTORS

DETAILS

EXPENDITUR

E TO DATE

GH¢

START

DATE

COMPLETION

DATE

%

WORK

DONE

REMARKS

1.Completion

of Light

Industrial

Area at Agona

Nkwanta

(1ST Phase)

Agona

Nkwanta

Commercial

49,416.00

DACF

Kings pock

40,012.00

-

-

100%

Completed

2.Construction

of 1 No. 3-Units

Classroom

Block with

Ancillary

facilities

Abase -

Tumentu

Education 138,000.00 DACF M/S Turktim Co.

Ltd, P.O. Box MC

307

Takoradi

62,864.45 16/10/12 15/06/13 65% Roofed,

Work in

Progress,

delay in

completion

3. Supply of

2000 Basic

School

Furniture

District Wide Education 127,500,00 DACF Chriswill Ventures 39,342.00 16/10/12 15/06/13 35% 100 pcs of

mono desk,

430 KG

tables

supplied.

Delayed in

completion

4. Spot

improvement of

selected feeder

roads

Agona –

Banso

Agona –

Damtes and

others

Roads

40,000.00

DACF

Direct Labour

(Assembly Grader)

-

-

-

80%

32.4km out

of 40.5km

of feeder

roads

earmarked

were

reshaped by

the DA

Page 5: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

5

PROJECT

NAME

LOCATION SECTOR CONTRAC

T SUM

GH¢

SOURCES

OF FUND

CONTRACTORS

DETAILS

EXPENDITUR

E TO DATE

GH¢

START

DATE

COMPLETION

DATE

%

WORK

DONE

REMARKS

5.Construction

of 1 No. 2-Units

K.G Block with

Ancillary facil.

Akwidaa Education 80,669,63 DACF Stekwam Ent.

P.O Box, TD 984

Takoradi

29,783.12 16/10/12 15/06/13 45% Gable block

yet to start

Work in

Progress,

delay in

completion

6. Construction

of 1 No. 3-Units

Classroom

Block with

Ancillary

facilities.

Agona

Ahanta

Education 138,000.00 DACF M/S Austbe Co.

Ltd.

P.O Box MC 384,

Takoradi

55,424.28 16/10/12 15/06/13 65% Roofed,

plastering in

progress

7.Construction

of 1 No. 2-Units

K.G Block with

Ancillary

facilities

Ahanta

Anyinase

Education 79,981.58 DACF M/S Appiah

Furniture & Const.

Works

P.O Box 10

Axim

42,778.28 16/10/12 15/06/13 65% Roofed,

work in

progress

8. Completion

of 1No. 3-unit

classroom block

and 1No. 4

Seater KVIP

Bokoro

Education

87,073.41

DACF

M/S Prefos LTD.

Box 1609, Accra

50,142.55

17/11/09

17/05/10

80% Main block

completed,

yet to start

work on

toilet.

9.Completion

of Incinerator

at Agona

Nkwanta

Agona

Nkwanta

Sanitation

39,800.00

DACF

Joe Nsiah

Consult, Box

518, KNUST,

KSI

28,000.00

25/01/06

25/05/06

90%

Abandoned

Page 6: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

6

PROJECT

NAME

LOCATION SECTOR CONTRAC

T SUM

GH¢

SOURCES

OF FUND

CONTRACTORS

DETAILS

EXPENDITUR

E TO DATE

GH¢

START

DATE

COMPLETION

DATE

%

WORK

DONE

REMARKS

10.Completion

of 1No. BS 1-6

Classroom

School Block,

1No. 6 Seater

water Closet

Toilet Block

and1No.Mecha

nised Borehole

Nsemaba

Education

146,650.00

GetFund

Ariester Ent. Box

865, T’di

101,481.74

20/12/07

20/06/08

100%

Completed

and in use,

but yet to be

officially

commission

ed

11. Completion

of 1No. BS 1-6

Classroom

School Block,

1No. 6 Seater

water Closet

Toilet Block

and 1No.

Mechanised

Borehole

Kejabil

Education

145,850.00

GetFund

Morkaro

Enterprise, P.O.

Box, 69, Wassa

Akropong

48,741.67

20/12/07

20/06/08

80%

Plastering

completed,

borehole

yet to start.

Project

abandoned.

To be

budgeted for

and re-

awarded

12. Completion

of 1No. BS 1-6

Classroom

School Block,

1No. 6 Seater

water Closet

Toilet Block

and 1No.

Mechanised

Borehole

Princess

Akatekyi

Education

144,268.01

GetFund

M/S Kakson

Const.Work Ent.

Box… Takoradi

33,474.01

06/10/10

06/06/2011

100%

Completed

now, yet to

be

commission

ed but in use

13. Completion

of 1 No. 6 -

Unit Classroom

Blocks with

Ancillary

Facilities.

Aboadi

Education

157,670.00

GetFund

LEEGSKY LTD

P.O.BOX,OS 936

OSU-ACCRA

41,842.56

06/06/11

06/02/2012

90% Painting

completed

Page 7: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

7

PROJECT

NAME

LOCATION SECTOR CONTRAC

T SUM

GH¢

SOURCES

OF FUND

CONTRACTORS

DETAILS

EXPENDITUR

E TO DATE

GH¢

START

DATE

COMPLETION

DATE

%

WORK

DONE

REMARKS

14.Completion

of 1 No. 6 -

Unit Classroom

Blocks with

Ancillary

Facilities

Kamfakrom

Education

181,511.00

GetFund

Active Eng. Co.

Ltd, Box EF 271,

Takoradi

-

05/09/11 05/04/12

100%

Completed,

yet to be

handed over

15. Completion

of 1 No. 6 - Unit

ClassroomBlocks

with Ancillary

Facilities

Nyameyawkr

om

Education

159,635.00

GetFund

M/S Johnsimons

Co. Ltd P.O.Box,

9828

Accra

-

06/06/11

06/02/2012

45%

Lintel Level,

delay in

completion

16. Completion

of 1No. 3-unit

classroom block

and 1No. 4

Seater KVIP

Beahu

Education

127,178.87 Getfund DO NOT GIVE UP

Const. Works Ltd,

Box 390, Obuasi

- 28/08/11 29/04/2012 45% Gable.

Delay in

completion

17.Completion

of 1No. 3-unit

classroom block

and 1No. 4

Seater KVIP

Akwidaa

Education

127,132.79 Getfund M/S Mark Kelly

Const. Ltd, Box 30,

Agona Ahanta

- 28/08/11- 29/04/2012 15% Partly

hardcorefille

d

18.Completion

of 1 No. 6 -

Unit Classroom

Blocks with

Ancillary

Facilities

Dixcove

Education

163,279.27

GetFund

EVANGHS

CO.LTD

P.O.BOX, 447

SEKONDI

-

28/08/11 29/04/2012 40% Lintel level.

Work in

Progress,

delay in

completion

19. Completion

of 1 No. 4-units

Teachers

Accomm.

Princess

Akatekyi

Education

144,797.97

DDF M/S Kakson

Construction

Works, Box 53,

Takoradi

121,989.28 19/01/11 19/08/11 100% Completed,

yet to be

handed over

Page 8: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

8

PROJECT

NAME

LOCATION SECTOR CONTRAC

T SUM

GH¢

SOURCES

OF FUND

CONTRACTORS

DETAILS

EXPENDITUR

E TO DATE

GH¢

START

DATE

COMPLETION

DATE

%

WORK

DONE

REMARKS

20.

Construction of

1 No. CHPS

Compound with

Ancillary

facilities.

Aketenchie. Health 85,285.01 DDF Pro-Emeth Ltd

P.O. Box, A62

Agona - Ahanta

76,756.51 16/10/12 15/06/13 100% Completed

but not in

use

21.

Construction of

Police DHQ

Agona

Ahnata

Social

Service

170,000.00 DDF Direct Labour 55,000.00 Aug-2013 March-2014 55% Suspended

Slab under

Construction

22.Construction

of Slaughter

House

Agona

Ahanta

Agric/Sanitati

on

60,000.00 DDF M/S JOESWITH

COY. LTD.

9,000.00 05/09/13 04/03/14 45% Gable level,

block work

yet to start.

23.

Construction of

Mother’s Hostel

Dixcove Health 82,000.00 DDF M/S JOETHUR

ENT.

12,300.00 05/09/13 04/03/14 75% Roofed,

plastered

and frames

fixed,

external

works.

24.

Construction of,

2No. 40

Market Stalls

Abura Commercial 99,982.43 DDF M/S VENITEL

ENTERPRISE

89,984.19 05/09/13 04/03/14 100% Completed,

yet to be

handed over

25. Completion

of 1No. Single

StoreyDormitor

y Block for

BBSHS

Agona

Ahanta

Education 207,655.10 DDF M/S Lilgeo

Enterprise LTD,

Box, 20, Tdi

168,178.87 19/01/11 19/08/11 65% Plastering

and fixing of

frames

26.Completion

of 1 No. 6 -

Unit Classroom

Blocks with

Ancillary

Facilities

Egyambra

Education

226,221.82 OFID Simokan Ltd. P.O.

BOX 4145

ACCRA

- 12/08/11 13/04/2012 30% Foundation

overcast

concrete

done

Page 9: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

9

PROJECT

NAME

LOCATION SECTOR CONTRAC

T SUM

GH¢

SOURCES

OF FUND

CONTRACTORS

DETAILS

EXPENDITUR

E TO DATE

GH¢

START

DATE

COMPLETION

DATE

%

WORK

DONE

REMARKS

27. Completion

of 1 No. 3 –

Units Teachers

Accomm.

Asemasa Education 108,312.85 OFID M/S RIGO-DEL

CO. LTD. BOX

16017, ACCRA

- 12/08/11 13/04/2012 55% Gable Level.

Delay in

completion

28. Drilling of

11No. Bore

holes

11 selected

communities

Water and

Sanitation

- GOG COMWASAN

CONSULT

Box, TN 27

Teshie-Nungua

Est.

Accra

- - - 60% Boreholes

have been

drilled in 10

comms

29. Drilling of

6No. Bore holes

6 selected

communities

Water and

Sanitation

63,000.00 GOG Quay-Hydro

Consult

P.O Box, OD 293

Odorkor-Accra

- July, 2012 November, 2012 60% Boreholes

have been

drilled in all

the selected

comms but

pumps yet to

be fitted

30. Drilling of

6No. Bore holes

6 selected

communities

Water and

Sanitation

- GOG - - - 60% Boreholes

have been

drilled in all

the selected

comms but

pumps yet to

be fitted

Page 10: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

10

Table 2: MONITORING OF NON – PHYSICAL PROJECTSREPORT AS AT 31-12-2013

(DISTRICT WIDE)

PROJECT

NAME

LOCATIO

N

SECTOR BUDGET

GHs

SOURCE

S OF

FUNDS

RESPONSIBLE

DEPT

REMARKS

1.0 10 AEAs, 7

DDOs and

DDAundertook

Home and Field

Visits to

educatefarmers

onnew farming

technologies.

Farming

communitie

s

Agric - MOFA DADU On-going

1.1 Organize

workshops to

sensitizefisherme

n and farmers to

work with Banks

Selected

Communitie

s

Agric. - DA/MOF

A

DADU Farmers

wereeducate

d on proper

record

keeping.

1.2 Provide

extension services

to livestock and

poultryfarmers.

Fishing

communitie

s

Agric. - MOFA/D

A

DADU On-going

1.3 Sensitize

Coastal

Communities on

mangrove

conservation

Coastal

Communitie

s

Environme

nt

1,500.000 CRC CRC/CF/Stakeholde

rs

On-going

1.4 Provide

scholarship to

needy but

brilliantstudents

District

Wide

Education 30,000.00 DACF Admin. On-going

1.5 Waste

Management

Services

Entire

District

Admin. 108,000.0

0

DACF EHU Waste

evacuation

and other

sanitarywork

s on-going

1.6 Support NYEP

Program

Entire

District

Social 5,000.00 DACF NYEP On-going

1.7 Support

DHMT for

diseases

surveillance

Entire

District

Health 500.00 DACF GHS On-going

Page 11: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

11

PROJECT

NAME

LOCATIO

N

SECTOR BUDGET

GHs

SOURCE

S OF

FUNDS

RESPONSIBLE

DEPT

REMARKS

1.8 Support

annual BECE

Mock Exams for

Basic Schools

District

Wide

Education 8,500.00 DACF GES BECE Mock

Exams Done

1.9 Support

DPCU activities

Agona

Ahanta

Admin. 25,000.00 DACF DPCU Secretariat On-going

2.0 Screen food

vendors medically

Selected

communitie

s

Admin. 2,000.00 IGF EHU On-going

2.1 Support for

HIV/Aids and

TB control

program

District

Wide

Health 1,625.000 DACF GHS On-going

2.2 Support for

people with

disability

Entire

District

Social 12,500.00 DACF Admin. On-going

2.3 Support

School Feeding

Program

Selected

Schools

Education 2,500.00 DA DA On-going

2.4 Facilitate the

procurement of

fishing gears

Fishing

communitie

s

Agric. - MOFA/D

A

DADU On-going

2.5 Support

National

Immunization

program

District

Wide

Health 3,000.00 DACF GHS NID done

2.6 Support

Malaria control

program

District

Wide

Health 12,500.00 DACF DACF On-going

2.7 Raise

awareness for

selected

communities to

register newly

born babies and

deaths

Selected

Communitie

s

Admin 1,500.00 IGF Births and Deaths On-going

Page 12: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

12

PROJECT

NAME

LOCATION SECTOR BUDGET

GHs

SOURCES

OF

FUNDS

RESPONSIBLE

DEPT

REMARKS

2.8 Organize

discussions on

annual fee

fixing

resolution and

budget

hearing with

citizenry

Area

Councils

Headquarters

Admin. 6,250.00 IGF DPCU Secretariat Public

discussions

done

2.9 Organize

STME Clinics

Apowa and

Agona

Education 3,000.00 DACF GES STME

Clinics done

3.0 Support

the supply of

school

uniform

Selected

schools

Education 10,000.00 DACF GES 6917 school

uniforms

were

supplied.

3.1 Organize

annual

revenue

mobilization

and

management

training for

all DA’s

revenues

staff

Agona

Ahanta

Admin. 1,500.00 DACF Finance Dept. Training

done

3.2

Celebration of

farmers day

Selected

community

Agri 5,500.00 DA/MOFA DADU Farmers

Day

celebrated.

3.3 Support

NADMO

activities

District Wide Admin 2,500.00 DACF NADMO NADMO

activities

supported

within the

year

Page 13: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

13

2.2 Update of the funding by sources

The details of the update of disbursement from funding sourcing are presented in table 3 and 4

below.

Table 3: UPDATE OF FUNDING BY SOURCES

ITEM 2011 2012 2013 TOTALS

Approved

GHs

Actual

GHs

Approved

GHs

Actual

GHs

Approved

GHs

Actual

GHs

Approved

GHs

Actual

GHs DACF 2,168,495.00 1,712,885.83 1,435,392.00 686,454.41 1,611,211.53 714,558.51 5,215,098.53 3,113,898.75

IGF 685,791.06 446,442.80 637,114.00 584,170.73 706,974.00 576,537.73 2,029,879.06 1,607,151.26

HIPC - 65,000.00 30,000.00 20,000.00 30,000.00 0.00 60,000.00 85,000.00

GOG

GRANTS

472,231.20 590,651.60 546,912.00 1,090,180.68 2,478,739.51 2,295,859.49 3,497,882.71 3,976,691.77

DONOR

GRANTS

- - 986,919.40 352,510.96 634,957.00 440,488.57 1,621,876.40 792,999.53

MPs CF - 51,814.50 80,000.00 15,232.66 100,000.00 82,602.98 180,000.00 149,650.14

TOTALS 3,326,517.26 2,866,794.73 3,716,337.40 2,753,549.45 5,561,882.04 4,110,047.28 12,604,736.70 9,725,391.45

SOURCE: FINANCE OFFICE, 2013

NB: MPs CF represent the MEMBER OF PARLIAMENT Common Fund net transfers

to the Assembly

Comment on sources of funds

1. Release of funds

Release of DACF to the Assembly has been untimely and inappropriate. The release of DACF

in the year under review was not encouraging. In practice, three (3) out of the four (4) quarters

are released within the year under review and the fourth (4th) quarter is released to the

Assemblies within the first (1st) quarter of the following year.

2. Effort to improve IGF

The Assembly has taken steps to improve collection of internally generated fund. These

includes; strengthening the capacity of the of the sub-structure to collect ceded ratable items

Page 14: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

14

from their respective Area Councils, prosecution of property rates defaulters as well as

enforcing building regulations as a means of generating income, formation of District Revenue

Taskforce to assist in revenue mobilization, organizing public budget hearings to involve the

local people in the budgeting process , setting of revenue targets for collectors and awarding

hardworking staff, strengthening monitoring and evaluation.

3. Challenges with generation of funds.

The major challenge in IGF generation is the nature of the local economy. Majority of the

people in the District are subsistence farmers with low infrastructure base which makes it

difficult to the needed revenue. Again, due to lack of resources sustaining tax education has

been a problem for the District.

Table 4: UPDATE ON DISBURSEMENT OF FUNDS

ITEM 2011 2012 2013 TOTALS

Approved

GHs

Actual

GHs

Approved

GHs

Actual

GHs

Approved

GHs

Actual

GHs

Approved

GHs

Actual GHs

ADMIN 511,317.68 354,133.82 314,760.00 306,465.62 991,804.00 776,276.73 1,817,881.6

8

1,445,170.55

PE 572,155.58 646,965.31 644,215.00 1,222,714.1

3

1,710,554.0

0

1,852,019.6

4 2,926,924.5

8

3,143,199.95

SERVICES - - 457,917.30 346,278.88 647,345.00 451,089.96 1,105,262.3

0

909,007.26

SPECIAL

PROJECTS

892,387.68 565,467.01 1,675,458.0

0

1,068,371.0

4

1,881,008.0

4

749,810.07 4,448,853.7

2

2,990,735.08

MISC. 176,357.68 72,725.20 143,048.00 149,048.00 331,171.00 125,544.50 650,576.68 341,317.70

TOTALS 2,152,218.

62

1,639,291.

34

3,235,507.3

0

3,092,877.6

7

5,561,882.0

4

3,954,740.9

0

10,949,498.

96

8,829,430.54

SOURCE: FINANCE OFFICE, 2013

Comments on the Disbursement of Funds

1. Adequacy

Page 15: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

15

DACF is not adequate for the Assembly to undertake its development projects. This is

because, the release of DACF comes with many deductions and statutory provisions

making it impossible for the Assembly to meet its budgetary requirement.

2. Utilization of Funds according to Budget

The Assembly tries as much as it can to work with the budgetary allocation, the

directives from the Central Government sometimes put pressure on the Assembly to

deviate from its budget.

3. Challenges

The directives from the Central Government make the Assembly to deviate from the

budgetary allocation. Again, the disbursement procedures for the MPs Common Fund

are not followed, thus making accounting for those funds difficult. Another challenge is

also the unforeseen situations which are equally important to address. Also, late release

of the DACF and other external funds makes it difficult to fully implement planned

projects and programmes.

Page 16: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

16

Table 5: Core District Indicators

Indicators(Categorized by

GSGDA Thematic Areas)

National

Baseline (2009)

District

Targets

(2013)

District

Indicator Level

(2013)

ENHANCING COMPETITIVENESS IN GHANA’S PRIVATE SECTOR

1 % increase in tourist arrivals 58.4% 65% 60.5%

ACCELERATED AGRICULTURE MODERNIZATION AND SUSTAINABLE NATURAL

RESOURCE MANAGEMENT

2

Percentage (%) increase in

yield of selected crops,

livestock and fish

MAIZE-0.27

CASSAVA-0.39

PLANTAIN- 0.11

OIL PALM- 0.52

MIAZE- 0.09

CASSAVA-0.12

PLANTIAN- 0.06

OIL PALM- 0.15

MIAZE- 0.05

CASSAVA – 0.08

PLANTIAN– 0.04

OIL PALM- 0.12

3 Hectares of degraded forest,

mining, dry and wet lands

rehabilitated/restored:

a. Forest b.Mining c. Dry /

wetland

NRD NRD NRD

OIL AND GAS DEVELOPMENT

4 Percentage of youth Trained

in Oil and Gas related skills

NRD NRD NRD

ENERGY, INFRASTRUCTURE AND HUMAN SETTLEMENT

5 % change in number of

households with access to

electricity

NRD NRD NRD

6 Teledensity/Penetration rate: NRD NRD NRD

7 Proportion/length of roads

maintained/Rehabilitated

- Trunk Roads (in km)

- Urban Roads (in km)

- Feeder Roads (in km)

NRD

NRD

NRD

40.5

NRD

NRD

27.9

8 Percent of population with

sustainable access to safe

water sources

59.50% 70.8% 62.3%

9 % of population with access to

improved sanitation (flush

toilets, KVIP, household

38.3% 45.0% 31.5%

Page 17: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

17

latrine)

10 % of people with access to

ICT facilities.

NRD NRD NRD

Indicators(Categorized by

GSGDA Thematic Areas)

National

Baseline (2009)

District

Targets (2013)

District

Indicator Level

(2013)

HUMAN DEVELOPMENT, EMPLYMENT AND PRODUCTIVITY 11 HIV/AIDS prevalence rate (% of

adult population, 15-49 yrs. HIV

positive)

2.8% 2.8% 0.2%

12 Maternal Mortality ratio (Number

of deaths due to

pregnancy and childbirth per

100,000 live births)

64 0 206

13 Under-five mortality rate

(Number of deaths occurring

between birth and exact age five

per 1000 live births)

0.6 0.6 4.1

14 Severe malaria case fatality in

children under five years

1.9 0 2.1

15 Penta 3 Coverage NRD 90% 139.1%

16 T B Cure-rate NRD 80% 54%

17 O P D Per Capital NRD 0.9 0.92

18 Antenatal Coverage NRD 90% 112%

19 a. Gross Enrolment Rate

(Indicates the number of

pupils/students at a given

level of schooling-regardless

of age- as proportion of the

number children in the

relevant age group)

-K.G

- Primary

- JSS

- SSS

b. Net Admission Rate in

Primary Schools (Indicates

Primary One enrolment of

pupils aged 6 years)

101.4%

88.7%

76.3%

23.8%

87.3%

107.30%

99.2%

99.00%

60.00%

74.90%

109.10%

99.40%

91.50%

59.60%

82.00%

20 Gender Parity Index (Ratio

between girls’ and boys’

enrolment rates, the balance of

parity is 1.00)

0.99

0.98

0.94

0.36

0.79

K.G- 1.00

Prim- 1.00

JHS- 1.00

SHS- 0.80

TVET-1.00

K.G- 1.00

Prim- 1.00

JHS- 1.00

SHS-0.32

TVET-0.92

21 Gross Admission Rate (GAR) NRD

K.G-100%

Prim.-102.90%

K.G-90.00%

Prim.-102.80%

Page 18: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

18

JHS-108.00%

SHS-80.00%

JHS-101.90%

SHS-65.00%

22 Indicators(Categorized by

GSGDA Thematic Areas)

National

Baseline (2009)

District

Targets

(2013)

District

Indicator Level

(2013)

TRANSPARENCY AND ACCOUNTABLE GOVERNANCE

23 Total amount of internally

generated revenue

294,788.94 706,904.00 576,537.73

24 Amount of Development

Partner and NGO funds

contribution to DMTDP

implementation

38,160.00 634,957.00 440,488.57

25 % of DA expenditure within

the DMTDP budget (How

much of DA’s expenditure

was not in the annual budget?)

NRD NRD NRD

26 Number of reported cases of

abuse (children, women and

men)

NRD 80 46

27 Police citizen ratio 1:5,494.2 1:6000 1:6754

SOURCE: DPCU, 2013

NOTE:

NRD – No Reliable Data

Page 19: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

19

2.4 Update of Critical Development and Poverty Issues

A. Ghana Youth Employment and Entrepreneur Development Agency (GYEEDA)

The GYEEDA is on-going. The District has registered One Thousand, Six Hundred and Eighteen

(1,618) unemployed youth under Eight (8) modules. Out of these number, Three Hundred and

Ninety-Four (394) youth have been employed under eight (8) modules representing 24.4% of the

total registered people. The summary is presented in table 6 below:

Table 6: Ghana Youth Employment and Entrepreneur Development Agency

Source: GYEEDA District Office, 2013

However, the District has registered Nine Hundred and Eighty-Seven (987) unskilled youth

under Unpaid/Setup Modules i.e Trade and Vocation. About 25 percent of the registered youths

have been enrolled and allocated to the respective tradesmen. The summary is presented below;

NO. MODULES NO. OF

APPLICANTS

REGISTERED

NO. EMPLOYED % EMPLOYED

1 Health Extension

Workers

174 52 30.0%

2 Community Protection

unit

50 13 26.0%

3 Community Teaching

Assistants

220 62 28.2%

4 Waste and Sanitation 1,050 225 21.4%

5 Paid Internship 23 6 26.1%

6 Waste and Sanitation

Zoil (Eco – Brigade)

- - -

7 Teacher Community

Assistants Initiative

60 24 40.0%

8. Fire Service and

Preventive Assistants

41 12 29.3%

TOTAL 1,618 394 24.4%

Page 20: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

20

Table 6a: Ghana Youth Employment and Entrepreneur Development Agency – Trade and

Vocation

Source: GYEEDA District Office, 2013

B. National Health Insurance Scheme (N.H.I.S)

Ahantaman Mutual Health Insurance Scheme (AMHIS) records indicated that a total number of

One Hundred and One Thousand, Two Hundred and Thirty-Four (101,234) people have so far

been registered with the scheme as at 31-12-2013 representing 95.5 percent of the District

population as of 2010 census. Out of this about 96.8 percent have been issued with I.D Cards.

The total amount of money received from the Government of Ghana (GOG) was One Million,

Two Hundred and Nine Thousand, Seven Hundred and Eighty – Seven Ghana Cedis, Thirty

Pesewas (GH ¢ 1,209,787.30). Out of this, One Million, Two Hundred Thousand, Four Hundred

and Ninety-Four Ghana Cedis, Ninety-Eight Pesewas (GH ¢1,200,494.98) have been paid to

healthcare providers. Total indebtedness of the scheme as at 31-12-2013 stood at Three Hundred

Sixty Thousand, Eight Hundred and Sixty-Six Ghana Cedis, Thirty-Five Pesewas (GH ¢

360,866.35)

The main challenge the Scheme encounters is serious unstable network.

NO. MODULES NO. OF APPLICANTS

REGISTERED

NO. EMPLOYED % EMPLOYED

1. Dress Making 250 170 68.0%

2. Hair Dressing 124 40 32.3%

3. Oil and Gas 205 8 4.0%

4. ICT/Mobile Phone

Repairs

60 30 50.0%

5. Road Maintenance 348 - -

TOTALS 987 248 25.1%

Page 21: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

21

C. CAPITATION GRANT

The District Directorate of Education received the Capitation Grant amounting to GHs

141,830.28 for the 2012/2013 academic year representing First, Second and Third terms’

Capitation Grants. It came in late than expected. The release of the funds is presented below:

CAPITATION – 2012/2013

1ST TRANCHE ENROLMENT GHs

Kindergarten 7017 11,062.09

Primary 16885 26,662.49

JHS 6101 9,618.04

TOTALS 30,003 47,232.62

2ND TRANCHE

Kindergarten 7017 11,062.09

Primary 16885 26,662.49

JHS 6101 9,618.04

TOTALS 30,003 47,232.62

3RD TRANCH

Kindergarten 7017 11,062.09

Primary 16885 26,662.49

JHS 6101 9,618.04

TOTALS 30,003 47,232.62

GRAND TOTAL 141,830.28

Besides the Capitation Grant, the Government also supplied Three Hundred and Forty-Seven

Thousand, Three Hundred and Forty-Nine (347,349) pieces of exercise books to the Ahanta

West District. This is represented in the table 7 below;

Page 22: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

22

Table 7: TYPES OF EXERCISE BOOKS SUPPLIED

ITEMS NUMBER ALLOCATED

Note 1 Exercise Book 236,402 pcs

P1 Language Exercise Book 10,579 pcs

P1 Writing Exercise Book 29,386 pcs

P1 Maths Exercise Book 10,579 pcs

P2 and P3 Maths Exercise

Book

29,892 pcs

Technical Drawing Book 18,649 pcs

Graph Book 11,872

347,349

These interventions by Government have relieved parents and guardians the expenditure that

would have been incurred by them thus increasing their disposable incomes on other items hence

improving on the levels of living of the beneficiary communities.

D. Special Challenges with the implementation of the District M & E Plan

The main challenges in the implementation of the District M & E Plan are untimely release of

funds and irregular deductions from DACF at source. This makes it difficult for the D/A to meet

all its financial obligations. Besides, capacity level of the DPCU members in carrying out M & E

activities and project management is low.

E. The Ghana School Feeding Programme

The Ghana School Feeding Programme (GSFP) is a government initiative to encourage

enrolment in schools particularly among public basic schools. It was instituted in July, 2006.

Currently, 18 basic schools are on-board the programme and pupils are fed in the beneficiary

schools in the District. The programme has created employment for private individuals and

currently 20 caterers are engaged in the catering services to the beneficiary schools.

Page 23: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

23

In spite of the tremendous impact of the programme in terms of boosting-up enrolment, it is

beset with a lot of challenges such as delays in the release of funds for the caterers, inadequate

kitchen facilities for the caterers and overwhelming increase in enrolment in beneficiary schools.

The table 8 below indicates the list of beneficiary schools and number of pupils enrolled on the

programme in each cluster in the District. Total amount of Four Hundred and EighteenThousand,

Three Hundred and Seventy-Two Ghana Cedis and Twenty Pesewas was paid to the Caterers

(GHs 418,372.20) for their services rendered to the beneficiary schools.

Table 8: List of Beneficiary Schools under GSFP in AWDA

CIRCUIT SCHOOL NO. OF PUPIL

EWUSIEJOE EGYAM CATHOLIC

PRY/K.G & PUMPUNIE

K.G

768

ANKYERNYIN D/A

PRY/K.G

270

NYAMEYEKROM D/A

PRY/K.G

247

KANFAKROM 454

APOWA PRETSIA D/A PRY/K.G 249

DIXCOVE BOEKROM D/A PRY/K.G

&ELOMBANKATA

615

YAAKOW 441

CAPE – 3 – POINTS 299

BUTRE 342

AGONA AGONA BANSO SDA

PRIM/K.G

270

APEMANIM 348

KWAMEKROM FASIN

D/A PRIM

554

AGONA BANSO SDA

PRY/KG

270

ABOADE D/A PRY & KG 454

ABURA NSEMABA 256

GYABENKROM 180

ABASE – TUMENTU 248

ENMOKAWO 293

Source: GES District Directorate, 2013

Page 24: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

24

F. Guinea Worm

Guinea Worm is not prevalent in the District.

G. Incentives for Business Development in the District

The proximity of the District to the commercial city of Western Region, Takoradi enhances

business and trade in the District. In order to promote the activities of local artisans, the

Assembly has acquired Fifty (50) acres of land to be developed as Light Industrial Area. Out of

this, Twenty –Three (23) acres have been completed as 1st phase of the project. The 1st phase is

being done by the D/A in collaboration with GTZ. Utility Service lines have been extended to

the site.

Besides, the current discovery of oil in the waters of Cape Three Point Basin of Western Region

and its prospective development of Down Stream Oil Industry has motivated both local and

international investors into the District to acquire land for industrial and commercial

establishments. The District have put measures in place to expedite its permitting process, in lieu

of this both the Technical and Statutory Planning Committees have been scheduled to meet every

fortnight to review proponent’s applications in order to approve development permit to

prospective developers on time.

Again, the District has been enrolled onto the Rural Enterprise Project. This project will ensure

the creation of a Business Advisory Center (BAC) and the Rural Technology Facility. The

Business Advisory Center will advise small scale businesses in order to make them more

efficient whiles the Rural Technology Facility will establish machine shop to facilitate the work

of local artisans such as fitters and welders

H. Land under Irrigation

The District Directorate of MOFA is awaiting a result from feasibility studies conducted by

Irrigation Development Authority in the last quarter of 2008.

Page 25: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

25

2.5 Participatory Monitoring and Evaluation

Participatory Monitoring and Evaluation (P.M & E) is one of the most valuable tools used to

capture perceptions and assess whether the planned development interventions introduced have

met the beneficiaries’ expectations, notably the poor and vulnerable in the society.

For an effective P.M & E, the DPCU educated and also raised awareness among the beneficiaries

by involving them in the selection of achievable indicators to monitor the intervention set in

motion.

The major activity the DPCU undertook under participatory M & E was the promotion of

partnerships between the District Assembly and identified stakeholders in participatory

Monitoring and Evaluation methods.

For social analysis and participatory impact assessment, the DPCU adopted Focus Group

Discussions (F.G.Ds) as the main P.M & E tool and methodology.

2.6 The Way Forward

The District Assembly is making effort to generate more internally generated fund to support its

activities. Again, members of the DPCU are sensitized to appreciate the work of DPCU.

However, there are other issues to be addressed; the irregular deductions from the DACF and

directives from the Central Government as well as Capacity building of DPCU members in M &

E activities in project management.

2.6.2 Recommendation

The following recommendations are however made to ensure full implementation of

development policies, programmes and projects in the DMTDP;

Page 26: AHANTA WEST DISTRICT ASSEMBLY, 2013 APReport...3 1.1 Status of DMTDP Ahanta West District’s MTDP has been prepared to cover a period between 2010 – 2013. The DMTDP is in its final

26

� The District Administration has taken advantage of capacity building component of the

DDF to build the capacity of DPCU members including M & E and project management

skills.

� The implementation of Composite Budget must properly be coordinated by bringing all

relevant stakeholders on board at the same time during training sessions.

� The irregular deductions from the DACF as a result of unplanned purchases on behalf of

the D/As should be stopped.