african domain includes: ne africa w africa s africa
TRANSCRIPT
African Domain
Includes: NE Africa
W Africa
S Africa
Motivation/Mid-term Goals• Land use change/sensitivity/agriculture:
– Regional attribution• What’s expected in individual regions?• Forcings?• Land use impacts as part of climate change
– Africanized model (includes baseline sim.)– Foci on precip, H2O cycle, surface energy
balance, temp, crop model (Bill and Lisa for connections)
– Engage with external forces/professionals
• Engage aerosol studies.• Contribute to IPCC 4th Assessment Report.
African Networking• Domain sizes:
– NE Africa (lat 40N 10S; lon 18E 60E; 100x88)– W Africa (lat 40N 5S; lon 25W 22E; 90x94)– S Africa (lat 5N 40S; lon 0E/W 57E; 90x114)
• Team leaders:– NE: Hasanean M.– W: Ernest A.– S: Anne B.
• Project ideas:– Mosaic of land use– Aerosols and convection (ICTP collaboration)
↑ Lat 40N 10S; Long 18E 60E
← Lat 5N 40S; Long 0E/W 57E
← Lat 40N 5S; Long 25W 22E
African Domains
To do:• Center lines for domains.• Projection• Short runs to test/compare over domain,
~1997-2001 for:• NE: NDJFM• W: JJAS• S: DJF & JJA
• Baseline simulation.• Literature review on land use, etc… in
individual domains.• Land use variables: ppt, temp, runoff, clouds
(1984-1989), convection, ITCZ.
Model parameters• Grell and Betts-Miller convection schemes
• Use default baseline
• .gif images to compare with similar intervals (posted on web)
• Idea for live-access server betw groups (long-term)
Land use in NE Africa
• Aerosols: linked to dust emissions; examine incoming tracers, using offline computations?
• Reforestation experiments in Egypt; deforestation in Ethiopia – ppt, runoff, Nile river flow or not.
Land Use for W Africa• Lake Chad.
• Nigeria: deforestation 2.8%/a; savanna movement; Sahel movement.
• Investigate driving forces of above in W Africa: change forests to cropland to examine deforestation effects.
• Aerosols: linked to fire/gas/dust emissions; examine incoming tracers, using offline computations?
Land Use for S Africa• Aerosols: linked to fire emissions; examine
incoming tracers, using offline computations?
• Literature review for further case studies.
Milestones• W Africa associates with ICTP and Jeremy• NE Africa assoc. Greg and Nellie• S Africa based in CT/Pta, SA• Due date for:
– Short runs: Aug. 2003– Long runs: mid 2004– Perturbation runs: mid 2004-early 2005
• Need planning workshop (Egypt?) for:– Long runs– Logistics– Target date for workshop: early Nov 2003 in Egypt !
• Writing workshop 2005
Other Issues
• Computing resources.
• Visiting other institutions:– Computing– Writing (thinking time)
• Data storage.
• Etc…
Additional issues/needs
• Resolution (high res. exp.) with Jeremy.
• Emissions data (Fabien)
• Add betts-miller scheme (Bi)
• Computing needs (need computers for west africa runs)
• Late 2003 meeting
• Subgrid parameterization