africa prefab quick formwork system
DESCRIPTION
form work prefabricatedTRANSCRIPT
No construction waste, with high recycle value.
80% components can be re-used in next project.
No cranes, skilled labor, and overhead are required.
Excellent surface finish with more seismic resistance.
200 times repetition, no plastering, very cost-effective.
4~6 days each floor, monolithic pour(slab). Speed
The advantages of this system are…
Maintenance
Quality
Economy
Recyclability
Compatibility
Formwork engineering is not only technically challenging but also required to have practising professionals and expertise. We have a good team of designers, engineers, architects, trained workers at back stage, whose professional knowledge and dedication always gives satisfied solutions and trusted advice to our partners.
If you wish to use old formwork system from the past projects in new projects, our engineers could help you re-arrange the panels and components in such a way that maximize the utilization of formwork system itself, thereby minimize your expenditure in purchase of new one.
Apart from the sales of entire formwork system, we also like to manufacture the standard panels and components, such as 400*2400,400*2700mm, and other sizes upon customer’s request. OEM&ODM services are also available.
Step 1:In we use state-of-art software to create best formwork system for your building project or business after receipt of the drawings(DWG format preferred).
Step 2:Our engineer team works closely with you to convert architectural plans to 3D shell models, the calculation of costing is carried out, we prepare and present the proposal. And then, you can execute the budget planning next.
Step 3:After you have approved the formwork solution, the final drawings and detailed work instruction are dispatched to start production.
How to work?