aerojet environmental update

15
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916) 355-2945 [email protected]

Upload: larue

Post on 19-Jan-2016

56 views

Category:

Documents


0 download

DESCRIPTION

Aerojet Environmental Update. Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916) 355-2945 [email protected]. Aerojet’s Goals for Remedial Action. Shared Goals - Aerojet and Stakeholders - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Aerojet Environmental Update

Aerojet Environmental Update

Carmichael Town Hall Meeting

March 12, 2008

Michael Girard

Aerojet Environmental Site Remediation

(916) 355-2945

[email protected]

Page 2: Aerojet Environmental Update

Aerojet’s Goals for Remedial Action

• Shared Goals - Aerojet and Stakeholders– Meet EPA and State of California goals and objects

– Protect the community’s drinking water resources

– Halt migration of chemicals

– Restore the aquifer

• Minimize disruption to Carmichael community

• Partnership with regulators, local government, water district and the community– Community outreach

– Proceed with the timely planning and implementation of Groundwater Remediation

– Identify opportunities for beneficial use of treated water

Page 3: Aerojet Environmental Update

Path to Successful Implementation

• Collaborative Approach to Response – Carmichael Water District (CWD)– Aerojet Corporation– Federal and State Agencies (EPA, DTSC, RWQCB)– Sacramento County

• Board of Supervisors

• Parks

• Water Resources

• Real Estate

• Development of Mutual Benefits as Part of Project Scope

Page 4: Aerojet Environmental Update

Path to Successful Implementation

• Unique approach to problem solving

• Carmichael Water District with full support from its Board quickly responded– Teamed with Aerojet to seek win-win solutions– Protect the Water Supply– Engage with multiple stakeholders– Protect the interests of the Community– Push for timely resolution

• Innovative use for treated water benefited CWD customers and the Parks

• Multiple project paths resulted in the completion of the Bajamont plant while issues with Ancil Hoffman were resolved

Page 5: Aerojet Environmental Update

How the Cleanup Process Works

Groundwater contamination moves with groundwater flowGroundwater Resource

Protected

Surface WaterWestern Groundwater Movement

Extraction well intercepts and stops plume movement

Extracted groundwater is piped underground to treatment facility

Cleaned groundwater is piped underground to discharge point and returned to environment

Enclosed treatment filters remove contamination

Page 6: Aerojet Environmental Update

Western Groundwater Operable Unit

Area 3 Northern Rancho Cordova

Area 1 Southern Rancho Cordova

Area 2Gold River (Complete

d)

US HW

Y 50

SU

NR

ISE B

LV

D.

Aerojet GET E/F

(Completed)

INTERNATIO

NAL

DRIVE

FOLSOM

BLVD.

Area 4Carmichael

LegendCompleted Extraction WellCompleted Treatment Facility

Completed Pipeline

Approximate Aerojet Boundary

Proposed Extraction Well

Proposed Treatment FacilityProposed Pipeline

Water Supply Well

Page 7: Aerojet Environmental Update

Carmichael Remedial Action (Area 4)

Palm Dr.

Landis Ave.

Bajamont GET L-B

Fai

r O

aks

Bou

leva

rdFair Oaks Boulevard

Ancil Hoffman GET L-A

Action Needed to Protect Water Supply Wells

Ancil Hoffman Treatment Facility under Design

Sunrise Boulevard

Bajamont Facility Complete, and Operating

Extraction Well

Water Supply Well

Treatment Plant

Page 8: Aerojet Environmental Update

Ancil Hoffman GET L-A Design Considerations

• Established residential and recreational area• Minimal impact to Community (short and long-term)• Limited available land to site well and treatment plant• Use of County land for locating extraction well(s) and

treatment plant• Design goals

– Minimize visual impacts in natural setting– Minimal impacts to various park uses and activities – Compatible with existing golf course structures

• Floodway constraints• Integrate design with CWD Storage Tank Project

Page 9: Aerojet Environmental Update

Conceptual GET L-A Treatment Plant

Page 10: Aerojet Environmental Update

GET L-A Schedule Summary

• Design, Bidding, Contract Award Now thru June 2008

• Receive Bids / Award Contracts June 2008

• Complete Well and Pipelines July thru Nov 2008

• CWD Constructs Reservoir Mar thru Nov 2008

• Start Treatment Plant Construction Nov 08 or April 2009

Page 11: Aerojet Environmental Update

Accomplishments

• Bajamont Treatment Plant constructed and operating

• Ancil Hoffman Treatment Plant location selected

• Environmental Documents complete and approved (CEQA)

• Lease agreement with County complete and approved

• Extraction well and monitor wells constructed

• Preliminary facility design complete

• Treated water discharge permit approved (NPDES)

Page 12: Aerojet Environmental Update

System Designed for Flexibility

• Treatment Plant– Planned flow of ~

– Plant capacity as built ~

• Extraction Wells– Planned pumping rate ~

– Well capacity is ~

Ancil Hoffman800 gpm

2000 gpm

800 gpm

1200 gpm

Bajamont600 gpm

1000 gpm

600 gpm

840 gpm

Page 13: Aerojet Environmental Update

Next Steps

• Complete Construction

• Facility start-up and optimization process takes 1-6 months

• Once system has operated for ~ 1 year an Effectiveness Evaluation is performed and a report is provided to the Agencies

• Possible System Adjustment (if necessary)

– Modify pumping rates in existing wells

– Modify treatment plant equipment

– Install new extraction well(s) with associated pipelines

Page 14: Aerojet Environmental Update

Thanks for your Time and Interest !

Questions?

Page 15: Aerojet Environmental Update

Future Questions or Concerns?

Aerojet Contact:

Tim MurphyDirector, Public Affairs

(916) [email protected]