Aerogeradores gigantes e queda de custos da energia: inovações com Engenharia BRAZIL WINDPOWER 2018

Upload: lephuc

Post on 18-Nov-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Aerogeradores gigantes

e queda de custos da energia:inovações com Engenharia

BRAZIL WINDPOWER 2018

DIÂ

MET

RO

DE

RO

TOR

, m

ANO

PROJETOS CERTIFICADOS PELA CAMARGO SCHUBERT

Nordex N131/3300 Hub height 168m

GE 3.6/137 Hub height 178m

Enercon E141 4.2MW – Hub height 159m

Vestas V126-3.3 / 3.45 MW – Hub height 166m

Ricardo SavioAeronautical Engineer ITA

PhD Massachussets Institute of Technology20 Years in Aircraft Industry (EMBRAER, AIRBUS)

21 Years in Wind Industry6 Wind Technology Patents

Odilon CamargoAeronautical Engineer ITA

40 Years in Wind EngineeringFounder of Camargo Schubert, leading wind

consultancy in Brazil

Iñaki AltiAeronautical Engineer – UPM Madrid22 years in Intelectual Property Protection4 years in Aircraft Industry10 years in Wind Industry

Eneko SanzIndustrial Engineer13 Years in Wind Industry Innoblade Development18 Wind Technology Patents

> 15 years experience wind industry

> 35 patents

BACKGROUND

GENERALMANAGEREneko Sanz

MBJ PROGRAMMANAGER

Javier Callén

GENERAL SERVICESJose MaríaApesteguía

SENIORENGINEER

Cristina García

TECHNOLOGYHely

Ricardo Savio

BUSINESSDEVELOPMENT

Iñaki Alti

SENIORENGINEER

Javier Monreal

SENIORDESIGNER

Julián Vicente

SET PROGRAMMANAGER

Ion Arocena

SENIORDESIGNER

David Aranaz

ENGINEERING TEAM

STRESSMANAGERAndré Noel

DESIGNMANAGER

José Alberto Rojo

MATERIALSMANAGER

Emilio Rodríguez

SENIORENGINEER

Luis A. Mayor

SENIORDESIGNER

Oihan Elorriaga

SENIORENGINEER

Arantxa Esparza

SENIORENGINEER

Ana Fernández

SENIORENGINEER

Javier Iriarte

nabralift®nabrajoint®

• 30% menos concreto

• 50% menos aço

• 50% menos parafusos

Três fundações independentes

16 m

16 m

16 m

15 ton 12.4 ton

nabrajoint®

nabrajoint®

22

2NABRAJOINT®

Project Overview

23

2NABRAJOINT®

Project Overview

24

2NABRAJOINT®

Project Overview

25

2NABRAJOINT®

Project Overview

26

2NABRAJOINT®

Project Overview

Hub height: 80 m

nabralift®

nabralift®

nabralift®

nabralift®

nabrajoint®

nabralandmark®

58

Good Poor

Modular Blade Joints Alternatives

Bonded T-BoltDouble

FittingBath Fitting

Strength

Mass & Cost

Assembly on

Site

Maintenance

Reliability

Source: MAKE

NABRAJOINT®

Competitors Analysis2

59

Good Poor

XXL Tower Alternatives

NABRALIFT®

Competitors Analysis3

Source: MAKE

Tubular

Steel

Segmented

Steel

Precast

Concrete or

Hybrid

Lattice

Tower Cost

Logistics

Assembly &

Erection

Modal

Coupling

Specialized

large crane

60

61

Soluções NABRAWIND x estado da arte 2018

REDUÇÃO FINAL NO LCOE – LEVELIZED COST OF ENERGY:

6%

nas condições européias de custo de aço, concreto, fabricação e logística

nabralift®nabrajoint®