advisory panel meetingadvisory panel meeting #2 - handout andhandout and presentation ... ·...
TRANSCRIPT
On behalf of Metrolinx, in coordination with the City of Mississauga
Port Credit GO Station Area Master Plan StudyPort Credit GO Station Area Master Plan Study
Advisory Panel Meeting #2 - Handout andAdvisory Panel Meeting #2 Handout and Presentation Materials
May 26, 2015
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Agenda
1. Review / Adoption of Minutes from First Advisory Panel Meeting
2. Presentation of Preliminary Draft Concept Plans: » Mobility Hub Objectives » Draft Built Form Parametres
3. Break-Out Design Session 4. Discussion of Next Steps for Built Form Analysis:
» 3-D Massing Model and Shadow Impact Analysis » Land Use Analysis » Traffic Impact Analysis » Multi-disciplinary Evaluation of Draft Concepts » Preparation of Draft Illustrative Guiding Principles » Summary of Findings
5. Presentation of Traffic Analysis Completed To-Date6. Other?
Source: Excerpt from Official Plan Amendment No.19 to the Mississauga Official Plan (i.e. Section 13.1.12 of the Port Credit Local Area Plan) and City of Mississauga Aerial Mapping
DRAFT1
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Preliminary Draft Built Form Concepts for Discussion
at 2nd Advisory Panel Meeting (Design Workshop)
The Preliminary Draft Concepts are intended to help start the conversation with the Advisory Panel about potential built form and urban design.
IBI Group has prepared Preliminary Draft Built Form Concepts for the Port Credit GO Station Area Master Plan lands:
CONCEPT A SHOWS A MAIN NORTHERN PEDESTRIAN CONNECTION and a 5-storey GO Transit parking structure and mixed-use development on Block 1 with:
• A1 assuming full property assembly on Blocks 2 and 4 and redevelopment.
• A2 assuming no or limited property assembly on Blocks 2 and 4 and some redevelopment.
CONCEPT B SHOWS NORTHERN AND MID-BLOCK PEDESTRIAN CONNECTIONS and a 6-storey GO Transit parking garage and mixed-use development on Block 1 with:
• B1 assuming full property assembly on Blocks 2 and 4 and redevelopment.
• B2 assuming no or limited property assembly on Blocks 2 and 4 and some redevelopment.
Block 3 is currently designated as ‘Utility’ and an amendment to the Official Plan would be required to permit other uses on the site (e.g. mixed use or high-density residential). The property owners, Bell Canada, have not expressed interest in relocating or redeveloping the site. As such, redevelopment scenarios are not being tested for Block 3.
With the feedback received from the Advisory Panel, IBI Group will then:
•Undertake additional design and analysis (e.g. articulation of building expression, guidelines for streetscape design and provision of open space, land use mix and shadow and traffic impact analysis); and
•Evaluate the draft concepts against a set of principles, objectives and criteria for the Port Credit GO Station Master Plan lands.
DRAFT2
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Draft Built Form Parametres Assumed
for Preliminary Draft Concepts
• Maximum height of up to 8 storeys along Hurontario Street frontage (eastern portion of Blocks 1 and 2): » To reflect right-of-way (ROW) width of Hurontario Street » With transitioning of heights (angular planes and setbacks)
• Maximum height of up to 22 storeys on remaining lands (west portions of Blocks 1 and 2 and Block 4): » Greatest heights closest to the Station » Variation in building heights » Dependant on parcel size
• Minimum heights – to be determined.
• Minimum distance separation between tall buildings of 30 metres.
• Maximum residential tower floor plate of 800 sq. m. for buildings over 16 storeys.
• No development within the 15 m LRT setback (opportunities exist to reduce the setback through integration of the LRT infrastructure (e.g. ramp, stairs, noise barrier, etc).
• The majority of the 800 GO parking spaces (400 net new spaces) will be provided for above-grade (structure anticipated to be 5 to 6 storeys).
Source: Figure B44 of the City of Mississauga Built Form Guidelines, modified by IBI Group.
Minimize shade impacts and provide access to sky views
and sunlight
DRAFT3
Purpose of Preliminary Draft Concepts• The Preliminary Draft Concepts prepared by IBI Group are intended to help start
th ti ith th Ad i P l b t t ti l b ilt f d bthe conversation with the Advisory Panel about potential built form and urban design.
• They are a work in progress (the massing of the buildings and grades of the y p g ( g g gproperties, including Hurontario Street, have been subsequently refined).
• The Master Plan Study is not intended to produce an actual architectural design for the GO parking garage or the other buildings. The preliminary draft 3-D massing p g g g g p y gmodel is intended just to shows potential building height and floor plates.
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Concept A1 Main Northern Pedestrian Connection on
Block 1 - Assumes Property Assembly on Blocks 2 & 4
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) - Preliminary Draft for discussion purposes only (May 26, 2015)
A1-Main Northern Pedestrian Connection (Block 1) – Assumes Property Assembly on Blocks 2 & 4
Potential Future Pedestrian Tunnel
Future Additional Track
15mLRT
Setback&
Walkway
FUTURELRT
STOP
10 Storeys
Block 3
ExistingGO StationBus Loop/ Bus Bays
Passenger Pick UpDrop O� Area (PPUDO)
POSSIBLE RELOCATEDGO STATION
HU
RON
TARI
O S
T
PARK ST E
HIGH ST E
QUEEN STREET
AN
N S
T
HEL
ENE
ST N
ELIZ
ABE
TH S
T N
35m
35m
30m
25mDistance Separation
Dis
tanc
e Se
para
tion
DistanceSeparation
35m
Dis
tanc
e Se
para
tion
30m
DistanceSeparation
Bloc
k 4
Block 2
Block 1
4-8 Storeys
4 Storeys
27 Storeys
12 Storeys
13 Storeys2 Storeys
3 Storeys 2.5 Storeys
6 Storeys
3 Storeys
Existing PedestrianTunnel
5 Storeys
6 Storeys
22 Storeys(Including Podium)
22 Storeys(Including Garage)
4-8
Stor
eys
2 Storey Open Air Pedestrian Walkway(3 levels of parking on top)
3 St
orey
s
20 Storeys(Including Podium)
Potential Development/Built FormBlock 1 GFA(sq m)Floor Plate(sq m) Floors
Block 2
Block 4
Subtotal:
Subtotal:
Subtotal:
TOTAL:
Tower 14,400800
750
7501,500
8004,2002,000
18
17
104-8
17
4-8
12,750
7,500
15,000
7,500
90,850
17,250
13,600
11,000
58,600
Tower
TowerLow-rise
Tower
Podium/Mid-riseGO Parking Structure 5
(+ 2 Flrs Below) 19,600
1,500 3Podium/ Mid-rise
Potential Pedestrian Circulation
4,500
Potential Improved Public Realm
Draft for D
iscussion Purposes Only
** *
*
115m
DRAFT4
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Concept A2 Main Northern Pedestrian Connection on
Block 1 - Assumes No or Limited Property Assembly on Blocks 2 & 4
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) - Preliminary Draft for discussion purposes only (May 26, 2015)
A2-Main Northern Pedestrian Connection (Block 1) – Assumes No or Limited Property Assembly on Blocks 2 & 4
Potential Future Pedestrian Tunnel
Future Additional Track
15mLRT
Setback&
Walkway
FUTURELRT
STOP
Block 3
ExistingGO StationBus Loop/ Bus Bays
Passenger Pick UpDrop O� Area (PPUDO)
POSSIBLE RELOCATEDGO STATION
HU
RON
TARI
O S
T
PARK ST E
HIGH ST E
QUEEN STREET
AN
N S
T
HEL
ENE
ST N
ELIZ
ABE
TH S
T N
35m
35m
Dis
tanc
e Se
para
tion
30m
DistanceSeparation
Bloc
k 4
Block 2
Block 1
6-8 Storeys
2-4
Stor
eys
4 Storeys
27 Storeys
12 Storeys
13 Storeys2 Storeys
3 Storeys 2.5 Storeys
6 Storeys
3 Storeys
Existing PedestrianTunnel
5 Storeys
6 Storeys
2-4
Stor
eys
2-4
Stor
eys
2-4
Stor
eys
22 Storeys(Including Garage)
22 Storeys(Including Podium)
2 Storey Open Air Pedestrian Walkway(3 levels of parking on top)
4-8
Stor
eys
4 St
orey
s
*
*
35mDistance
Separation
*
*Potential Development/Built FormBlock 1 GFA(sq m)Floor Plate(sq m) Floors
Block 2
Block 4
Subtotal:
Subtotal:
Subtotal:
TOTAL:
Tower 13,600800
300
600
1,750
600
750
4,200
2,250
17
2-4
2-4
184-8
6-8
900
1,800
3,600
1,800
76,725
12,250
14,050
13,500 12,375
59,075
Low-rise
Tower
Mid-rise
Podium/Mid-riseGO Parking Structure 5
(+ 2 Flrs Below) 19,600
300 2-4 900 Low-riseLow-rise
Low-rise2-4
Potential Pedestrian Circulation
Listed Heritage Building
Potential Improved Public Realm
115m
Draft for D
iscussion Purposes Only
DRAFT5
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Concept B1 Northern and Mid-Block Pedestrian
Connections on Block 1 - Assumes Property Assembly on Blocks 2 & 4
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) - Preliminary Draft for discussion purposes only (May 26, 2015)
B1-Northern and Mid-Block Pedestrian Connections (Block 1) – Assumes Property Assembly on Blocks 2 & 4
Potential Future Pedestrian Tunnel
Future Additional Track
15mLRT
Setback&
Walkway FUTURELRT
STOP
10 Storeys
Block 3
22 Storeys(Including Garage)
ExistingGO StationBus Loop/ Bus Bays
Passenger Pick UpDrop O� Area (PPUDO)
POSSIBLE RELOCATEDGO STATION
HU
RON
TARI
O S
T
PARK ST E
HIGH ST E
QUEEN STREET
AN
N S
T
HEL
ENE
ST N
ELIZ
ABE
TH S
T N
35m
35m
30m
25mDistance Separation
Dis
tanc
e Se
para
tion
DistanceSeparation
30m
35m
Dis
tanc
e Se
para
tion
DistanceSeparation
Bloc
k 4
Block 2
22 Storeys(Including Podium)
Block 1
4-8 Storeys
4-8
Stor
eys
4 Storeys
27 Storeys
12 Storeys
13 Storeys2 Storeys
3 Storeys 2.5 Storeys
6 Storeys
3 Storeys
Existing PedestrianTunnel
6 Storeys
6 Storeys
3 St
orey
s
20 Storeys(Including Podium)
*
115m
**
*
Potential Development/Built FormBlock 1 GFA(sq m)Floor Plate(sq m) Floors
Block 2
Block 4
Subtotal:
Subtotal:
Subtotal:
TOTAL:
Tower 14,400800
750
7501,500
8003,500
2,55018
17
104-8
16
4-8
12,750
7,500
15,000
7,500
94,475
17,250
12,800
14,025
62,225
Tower
TowerMid/Low-rise
Tower
Podium/Mid-riseGO Parking Structure 6
(+ 2 Flrs Below) 21,000
1,500 3 4,500 Podium/Mid-rise
Potential Pedestrian Circulation
Potential Improved Public Realm *
Draft for D
iscussion Purposes Only
DRAFT6
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Concept B2 Northern and Mid-Block Pedestrian
Connections on Block 1 - Assumes No or Limited Property Assembly on Blocks 2 & 4
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) - Preliminary Draft for discussion purposes only (May 26, 2015)
B2-Northern and Mid-Block Pedestrian Connections (Block 1) – Assumes No or Limited Property Assembly on Blocks 2 & 4
6-8 Storeys
2-4
Stor
eys
2-4
Stor
eys
2-4
Stor
eys
2-4
Stor
eys
Potential Future Pedestrian Tunnel
Future Additional Track
15mLRT
Setback&
Walkway FUTURELRT
STOP
Block 3
ExistingGO StationBus Loop/ Bus Bays
Passenger Pick UpDrop O� Area (PPUDO)
POSSIBLE RELOCATEDGO STATION
HU
RON
TARI
O S
T
PARK ST E
HIGH ST E
QUEEN STREET
AN
N S
T
HEL
ENE
ST N
ELIZ
ABE
TH S
T N
35m
30m
Dis
tanc
e Se
para
tion
Bloc
k 4
Block 2
Block 1
4-8 Storeys
4 Storeys
27 Storeys
12 Storeys
13 Storeys2 Storeys
3 Storeys 2.5 Storeys
6 Storeys
3 Storeys
Existing PedestrianTunnel
6 Storeys
6 Storeys
35mDistance
Separation
22 Storeys(Including Garage)
22 Storeys(Including Podium)
45mDistance
Separation
Potential Development/Built FormBlock 1 GFA(sq m)Floor Plate(sq m) Floors
Block 2
Block 4
Subtotal:
Subtotal:
Subtotal:
TOTAL:
Tower 13,500750
300
600
1,750
600
8003,5002,550
18
2-4
2-4
16
4-8
6-8
900
1,800
3,600
1,800
78,975
12,250
14,050
12,800
14,025
61,325
Low-rise
Tower
Mid-rise
Podium/Mid-riseGO Parking Structure 6
(+ 2 Flrs Below) 21,000
300 2-4 900 Low-riseLow-rise
Low-rise2-4
Potential Pedestrian Circulation
Listed Heritage Building
Potential Improved Public Realm
Draft for D
iscussion Purposes Only
***
*
*
115m
DRAFT7
Preliminary Draft 3-D Model – Concept A1
Plan View
Existing buildings shown in blue. Potential new development shown in white.
1
Preliminary Draft 3-D Model – Concept A1
Western View Eastern View
2
Existing buildings shown in blue. Potential new development shown in white.
Preliminary Draft 3-D Model – Concept A1
Northern View Southern View
3
Existing buildings shown in blue. Potential new development shown in white.
Preliminary Draft 3-D Model – Concept A2
Northern View Southern View
4
Existing buildings shown in blue. Potential new development shown in white.
Sev
PORT CREDIT GO STATION AREA MASTER PLAN STUDY (SITE 12) MAY 26, 2015Mobility Hub Planning Principles
Seamless Mobility
Successful Implementation
Seamless integration of modes at the rapid transit station
Flexible planning to accommodate growth and change
A well-designed transit station for a high quality user experience
Strategic parking managementSafe and efficient movement of people with high levels of pedestrian priority
Effective partnerships and incentives for increased public and private investment
Placemaking
A vibrant, mixed-use environment with higher land use intensity
A minimized ecological footprintAn attractive public realm
Taxi
Bus
Rail
Draft for Discussion Purposes Only
1
5
8
2
6
9
3
7
4