ade olaosebikan | a collection of work 2016
DESCRIPTION
A collection of images showcasing work carried out from Undergraduate to Professional life.TRANSCRIPT
![Page 1: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/1.jpg)
Adeolu Olaosebikan | A Collection of Work
P O R T F O L I O
ADE O L A O S E B I K A N
![Page 2: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/2.jpg)
Contents
Analysis 04
Le Lay Architects 28
Technical Detailing 11
Masterplanning 06
John Lewis Planning Department 36
Elevation Drawing 16
Plan Drawing 08
3D Modelling 21
Hand Drawing Ability 26
Undergraduate Work 04
Professional Work 28
Graphic Design 40
![Page 3: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/3.jpg)
![Page 4: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/4.jpg)
Adeolu Olaosebikan | ACollection of Work 4
Adeolu Olaosebikan | A Collection of Work 31
Infographics
Analysis
![Page 5: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/5.jpg)
Adeolu Olaosebikan | ACollection of Work 5Adeolu Olaosebikan | A Collection of Work
Transport is a major part of Polyvalent City. The passing Channel Tunnel Rail Link creates a special opportunity to form a truly polycentric city. Connecting the site to Stratford, Kent as well as mainland Europe.
Graphic 1 contextualises the site with the rest of London and the Thames Estuary. Graphic 2 depicts a graphical investigation into the existing public transport facilities through site. Graphic 3 investigates the subterranean High speed rail
link piercing through the site. Graphic 4 presents a detailed analysis
industries into 5 major zones.
![Page 6: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/6.jpg)
Adeolu Olaosebikan | ACollection of Work 6
Masterplanning
![Page 7: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/7.jpg)
Adeolu Olaosebikan | ACollection of Work 7
1:1250 Masterplan [Drawing Not to Scale] New Dagenham Dock Masterplan.
Dagenham Dock Docklands Light Railway station and Viaduct.Includes new location for the Data Centre servicing the Future Industries Park and office facilities.
Illustrating proximities of various building typologies and landscapes.
![Page 8: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/8.jpg)
Adeolu Olaosebikan | ACollection of Work 8
Plan Drawing
![Page 9: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/9.jpg)
Adeolu Olaosebikan | ACollection of Work 9Adeolu Olaosebikan | A Collection of Work 13
Platform (Fourth) Floor Plan Scale 1:200 1. Fire Exit 2. Platform 1 3. Platform 2 4. Control Room 5. Worker’s balcony 6. Fire Exit 2
Ground Floor Plan Scale 1: 200
2. Store Room 3. Workers Lounge 4. Station Newsagents 5. Retail units 6. Deli/Breakfast Shop 7. Ticketing Circulation space (Public) 8. Circulation Space (Private).
![Page 10: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/10.jpg)
Adeolu Olaosebikan | ACollection of Work 10
![Page 11: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/11.jpg)
Adeolu Olaosebikan | ACollection of Work 11
Technical Detailing
![Page 12: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/12.jpg)
Adeolu Olaosebikan | ACollection of Work 12
Adeolu Olaosebikan | A Collection of Work 18
1. Concrete substrate (foundation/floor) 40mm gravel layer 10mm Damp Proof Membrane 50mm Insulation layer 300mm reinforced concrete
2. Paved Walkway 40mm gravel layer 100 mm reinforced Concrete 2mm Tile Adhesive 18mm 600x600mm Grespania Tiles
3. Lighting
4. Glazing Holder
5. Raised Floor System Concrete Floor 150mm Bracket Pedestal Stringer Panel Core 11mm 600x600mm Tile
6. Spider fin glazing system 10mm Laminated tempered Fin glass Structure silicon sealant 10 mm Tempered front facing glass
7. Spider Attachments Spider Connection Full Weld Silicon Sealant Spider Fitting
8. Glass Fin Splint (to Concrete Beam) 10mm Thick Embedded Parts (with 4 chemical anchor bolts) Welding Connecting bolt Connecting oticplacode
9. Linear Beam Grid Suspended Ceiling system Suspended supports (1400mm intervals) Suspension Channel Plain beam grid Beam support brackets
10. 30 mm cedar interlocking roof ceiling panels
11. I Beam 254 x 254mm I Beam 24mm Nuts and Bolts
12. Reinforced Concrete
13. Horizontal Treated Cedar Slats
14. Wind Protectors 120mm waterproof panel 134mm Insulation panel
15. Vertical Treated Cedar Slats
1:20 Detailed Wall Section [Drawing Not to Scale]
16. 300mm Bespoke Hydraulic Supports 17. 500mm Bespoke Hydraulic Supports
18. Pedestrian Footbridge walkway
19. 45mm Light Gauge Supports
20. Roof and Parapet System Insulated roof panel Gun grade seal at panel joints inline with 8mm butyl Air Seal – 8mm Butyl rubber sealant Factory made membrane lined gutter
1
23
4
5
6
7
10
8
9
11
1213
14
15
16
17
18
19
20
Adeolu Olaosebikan | A Collection of Work 18
1. Concrete substrate (foundation/floor) 40mm gravel layer 10mm Damp Proof Membrane 50mm Insulation layer 300mm reinforced concrete
2. Paved Walkway 40mm gravel layer 100 mm reinforced Concrete 2mm Tile Adhesive 18mm 600x600mm Grespania Tiles
3. Lighting
4. Glazing Holder
5. Raised Floor System Concrete Floor 150mm Bracket Pedestal Stringer Panel Core 11mm 600x600mm Tile
6. Spider fin glazing system 10mm Laminated tempered Fin glass Structure silicon sealant 10 mm Tempered front facing glass
7. Spider Attachments Spider Connection Full Weld Silicon Sealant Spider Fitting
8. Glass Fin Splint (to Concrete Beam) 10mm Thick Embedded Parts (with 4 chemical anchor bolts) Welding Connecting bolt Connecting oticplacode
9. Linear Beam Grid Suspended Ceiling system Suspended supports (1400mm intervals) Suspension Channel Plain beam grid Beam support brackets
10. 30 mm cedar interlocking roof ceiling panels
11. I Beam 254 x 254mm I Beam 24mm Nuts and Bolts
12. Reinforced Concrete
13. Horizontal Treated Cedar Slats
14. Wind Protectors 120mm waterproof panel 134mm Insulation panel
15. Vertical Treated Cedar Slats
1:20 Detailed Wall Section [Drawing Not to Scale]
16. 300mm Bespoke Hydraulic Supports 17. 500mm Bespoke Hydraulic Supports
18. Pedestrian Footbridge walkway
19. 45mm Light Gauge Supports
20. Roof and Parapet System Insulated roof panel Gun grade seal at panel joints inline with 8mm butyl Air Seal – 8mm Butyl rubber sealant Factory made membrane lined gutter
1
23
4
5
6
7
10
8
9
11
1213
14
15
16
17
18
19
20
Section Drawing 1:50 [Drawing Not to Scale]
1:20 Detailed Wall Section [Drawing Not to Scale]
![Page 13: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/13.jpg)
Adeolu Olaosebikan | ACollection of Work 13
Adeolu Olaosebikan | A Collection of Work 18
1. Concrete substrate (foundation/floor) 40mm gravel layer 10mm Damp Proof Membrane 50mm Insulation layer 300mm reinforced concrete
2. Paved Walkway 40mm gravel layer 100 mm reinforced Concrete 2mm Tile Adhesive 18mm 600x600mm Grespania Tiles
3. Lighting
4. Glazing Holder
5. Raised Floor System Concrete Floor 150mm Bracket Pedestal Stringer Panel Core 11mm 600x600mm Tile
6. Spider fin glazing system 10mm Laminated tempered Fin glass Structure silicon sealant 10 mm Tempered front facing glass
7. Spider Attachments Spider Connection Full Weld Silicon Sealant Spider Fitting
8. Glass Fin Splint (to Concrete Beam) 10mm Thick Embedded Parts (with 4 chemical anchor bolts) Welding Connecting bolt Connecting oticplacode
9. Linear Beam Grid Suspended Ceiling system Suspended supports (1400mm intervals) Suspension Channel Plain beam grid Beam support brackets
10. 30 mm cedar interlocking roof ceiling panels
11. I Beam 254 x 254mm I Beam 24mm Nuts and Bolts
12. Reinforced Concrete
13. Horizontal Treated Cedar Slats
14. Wind Protectors 120mm waterproof panel 134mm Insulation panel
15. Vertical Treated Cedar Slats
1:20 Detailed Wall Section [Drawing Not to Scale]
16. 300mm Bespoke Hydraulic Supports 17. 500mm Bespoke Hydraulic Supports
18. Pedestrian Footbridge walkway
19. 45mm Light Gauge Supports
20. Roof and Parapet System Insulated roof panel Gun grade seal at panel joints inline with 8mm butyl Air Seal – 8mm Butyl rubber sealant Factory made membrane lined gutter
1
23
4
5
6
7
10
8
9
11
1213
14
15
16
17
18
19
20
Adeolu Olaosebikan | A Collection of Work 20
Roof Construction
Roof Structure
Control Room
Structural Frame, Glass Support, Curtain Wall
Viaduct
Platform, Tracks, Station Furniture, Ticket Barriers.
Viaduct Structural Piers
Structural Frame Retail Concourse Frame
Cladding Frame
External Cladding Vertical Cedar Slats
Horizontal Cedar Slats
Curtain Wall
Spider Fin Panels, Glass Panels
Station Amenities (Left to Right)
Pedestrian Bridge Concrete Floor, Cladding, Stair.
Exploded Diagram
Exploded 3 dimensional Model
![Page 14: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/14.jpg)
Adeolu Olaosebikan | ACollection of Work 14
1:50 Section Drawing [Drawing Not to Scale] Fig, 1 3D Beam to Column Connection Detail, Fig. 2 North Side 3D External Wall Detail, Fig. 3 3D Railway Track Detail, Fig 4. 3D Spider Fin detail Diagram
![Page 15: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/15.jpg)
Adeolu Olaosebikan | ACollection of Work 15Adeolu Olaosebikan | A Collection of Work 19
Adeolu Olaosebikan | A Collection of Work 19
Lift Shaft 3 dimensional Render
![Page 16: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/16.jpg)
Adeolu Olaosebikan | ACollection of Work 16
Elevation Drawing
![Page 17: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/17.jpg)
Adeolu Olaosebikan | ACollection of Work 17Adeolu Olaosebikan | A Collection of Work 14
Initial East Elevation Sketch
East Elevation 1:200 [Drawing Not to Scale]
1:200 East Elevation [Drawing Not to Scale]
![Page 18: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/18.jpg)
Adeolu Olaosebikan | ACollection of Work 18
15
South Elevation 1:200 [Drawing Not to Scale]
Initial South Elevation Sketch
![Page 19: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/19.jpg)
Adeolu Olaosebikan | ACollection of Work 19
![Page 20: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/20.jpg)
Adeolu Olaosebikan | ACollection of Work 20
![Page 21: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/21.jpg)
Adeolu Olaosebikan | ACollection of Work 21
3-dimensional Modelling
![Page 22: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/22.jpg)
Adeolu Olaosebikan | ACollection of Work 22
Bike Parking and Restaurant Facilities Perspective
Tying in with the Mayor of London ‘cycle to work’ initiative a purpose built 400 bicycle facility is being proposed on
site.
Restaurant
Normal Bicycle Parking
Normal Bicycle Parking
Barclays Cycle Hire Parking
![Page 23: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/23.jpg)
Adeolu Olaosebikan | ACollection of Work 23Adeolu Olaosebikan | A Collection of Work 22
Exchange Building External Render
![Page 24: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/24.jpg)
Adeolu Olaosebikan | ACollection of Work 24
![Page 25: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/25.jpg)
Adeolu Olaosebikan | ACollection of Work 25Adeolu Olaosebikan | A Collection of Work 25
3 Dimensional Cross Section
3 Dimensional Section cutting through heart of the stock exchange building.
![Page 26: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/26.jpg)
Adeolu Olaosebikan | ACollection of Work 26
Hand drawn sketch
![Page 27: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/27.jpg)
Adeolu Olaosebikan | ACollection of Work 27
1:100 Holiday Residency [Drawing Not to Scale]1st Year Undergraduate project
![Page 28: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/28.jpg)
Adeolu Olaosebikan | ACollection of Work 28
Professional Work Le Lay Architects
Architectural Assistant
![Page 29: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/29.jpg)
Adeolu Olaosebikan | ACollection of Work 29
![Page 30: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/30.jpg)
Adeolu Olaosebikan | ACollection of Work 30
Newnham HouseEarly concept models for proposed property.
![Page 31: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/31.jpg)
Adeolu Olaosebikan | ACollection of Work 31
Healthy Homes Competiton EnrtyOffice Research project submitted as competition entry.
Worked on floor plan, visuals and elevation.
![Page 32: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/32.jpg)
Adeolu Olaosebikan | ACollection of Work 32
Columbarium DesignMeasured Survey and Plan Drawing Exercise.
Visited site to carry out measured survey, and drew plans for clients.
![Page 33: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/33.jpg)
Adeolu Olaosebikan | ACollection of Work 33
Basement ExtensionCreated concept drawings and drew plans for client and for pre-application.
![Page 34: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/34.jpg)
Adeolu Olaosebikan | ACollection of Work 34
![Page 35: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/35.jpg)
Adeolu Olaosebikan | ACollection of Work 35
Various Detailed Drawings
![Page 36: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/36.jpg)
Adeolu Olaosebikan | ACollection of Work 36
Professional Work John Lewis
Bathroom Planner
Adeolu Olaosebikan | A Collection of Work 5
Baker Street, Ensuite Bathroom
Conversion of room into Ensuite Bathroom, including double shower enclosure and wall hung units.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
![Page 37: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/37.jpg)
Adeolu Olaosebikan | ACollection of Work 37Adeolu Olaosebikan | A Collection of Work 5
Baker Street, Ensuite Bathroom
Conversion of room into Ensuite Bathroom, including double shower enclosure and wall hung units.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
![Page 38: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/38.jpg)
Adeolu Olaosebikan | ACollection of Work 38
Man
ufac
ture
r:
Rang
e:
Doo
r Col
our:
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
11/11/14
The drawing is for illustrative purposes only.
Lisgar Gardens, Main Bathroom
![Page 39: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/39.jpg)
Adeolu Olaosebikan | ACollection of Work 39
Hampstead, Main Bathroom Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
21/10/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
21/10/14
The drawing is for illustrative purposes only.
, , ,
Manufacturer:
Range:
Door Colour:
Colour shown is not an accurate reproduction of the finish selected.
Customer:
Estimate Ref:
Date:
Planner:
21/10/14
The drawing is for illustrative purposes only.
![Page 40: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/40.jpg)
Adeolu Olaosebikan | ACollection of Work 40
Graphic Design
![Page 41: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/41.jpg)
Adeolu Olaosebikan | ACollection of Work 41
Leaflet/Flyer Client Designs
A small selection of promotional materials for my various clients.
First Floor Plan Scale 1:200
1. Station management
3. Newsagent Stock Room 4. Retail unit 5. Retail unit6. Retail unit7. Bike Parking
contact
075-353-66253
elite natural fitness@elitenaturalfit
chriselitetrainer
Coach
Your Transformation
Ab-Salute Gym LTD, Unit C5, J31 Park, Motherwell Way, Thurrock RM20 3XD
Opening Times
Monday to Fridays: 6 am to 10 pm.
Weekends: 8 am to 5 pm. 6/20/14 Grays - Google Maps
https ://www.google.co.uk/maps/place/Grays/@ 51.4810043,0.2797112,17z/data=! 3m1! 4b1! 4m2! 3m1! 1s0x47d8b0d2354148a1:0x1cb0edb3d10ccb47 1/1
50 m
Explore this area
Grays , Essex R M 20 3XD
www.elitenaturalfitness.co.uk
Promotion
Logo Design Facebook Banner
![Page 42: Ade Olaosebikan | A Collection of Work 2016](https://reader033.vdocuments.us/reader033/viewer/2022052915/579091381a28ab7b27901ebb/html5/thumbnails/42.jpg)
Thank You for reading.