Non-Toll Revenue & Sectional Completion
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
CNG / Patrol Station adjacent to superhighway which having tenancy agreement with NHA are one of the Non-Toll-Revenue.
Upon taking-over of site, the tenancy agreement of CNG / Patrol Station owner will transfer to Concessionaire and the rental will be collected by the Concessionaire through out the 28 years concession period.
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
Existing Restraurent adjacent to superhighway which having tenancy agreement with NHA are one of the Non-Toll-Revenue.
Upon taking-over of site, the tenancy agreement of Existing Restraurent owner will transfer to Concessionaire and the rental will be collected by the Concessionaire through out the 28 years concession period.
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
De-acceleration Lane
Acceleration Lane
Service Lane
Fencing
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
The monthly rental of existing buried utilites (cables & etc…) within the NHA ROW are being collected by NHA.
Such Rental will later be collected by Concessionaire upon taking over of site .
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
Advertising along the Motorway will enable concessionaire to generate NTR.
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
KARACHI
HYDERABAD
Application of Quarry Land (1,500 acres) hasbeen submitted to Mines & Mineral Dept of Sindh for Base CampSetup & Quarry Plant Setup.
Strategy in the planning to assign full-swing construction team in between Nooribad & Hyderabad to archieve 50% continuous stretch
1) Nooribad – Hyderabad : semi urban & rural area, less disturbance in term of land acquisition & traffic diversion.
2) To finish the mentioned rutting road destress area to gain favor and confidence from motorist.
M9 – MOTORWAY KEY ENGINEERING FEATURES