Addendum No. 2 Page 1 of 4
17070 Skaneateles CSD - Capital Project 2021 - Phase II - Additions and Alterations
ADDENDUM No. 2 October 15, 2019
17070 - Skaneateles CSD Phase 2
Additions and Alterations
High School / Middle School SED No.: 42-16-01-06-0-001-027 State Street Elementary School SED No.: 42-06-01-06-0-002-016 Transportation Facility SED No.: 42-16-01-06-5-013-003 Waterman Elementary School SED No.: 42-16-01-06-0-007-019 Press Box SED No.: 42-16-01-06-7-017-001
TO: ALL BIDDERS AND DOCUMENT HOLDERS
ISSUED BY: Ashley McGraw Architects, D.P.C. 125 E. Jefferson Street, 15th Floor
Syracuse, New York 13202 Phone: (315) 425-1814
All bidders submitting proposals for the above project shall take note of the following Clarifications, Changes, Additions, and Deletions to the drawings and specifications that become part of the contract. Receipt of this Addendum shall be acknowledged on the Form of Proposal. This Addendum consists of four (4) pages of 8 ½” x 11” text, five (5) attached 30” x 42” drawings, four (4) 11” x 17” drawings, one (1) 8.5” x 11” drawing and two (2) pages of 8 ½” x 11” specification replacement text.
CLARIFICATION
1-C-1 SPECIFICATION SECTION 00 0300 – ADVERTISEMENT FOR BIDS
1. Bids must be received at the DISTRICT OFFICE as identified in Specification Section 00 0300 Advertisement for Bids, page 1 of 2.
1-C-2 SPECIFICATION SECTION 00 4000 - INSURANCE REQUIREMENTS
1. Insurance requirements as stated in Specification Section 00 4000 are accurate for the 2021 Capital Project Phase 2.
Addendum No. 2 Page 2 of 4
17070 Skaneateles CSD - Capital Project 2021 - Phase II - Additions and Alterations
1-C-3 HSMS S106 – HIGH SCHOOL GRANDSTAND
1. This Work is by Contract No. 1 General Construction Work (GC).
1-C-4 HSMS S107 – MIDDLE SCHOOL BLEACHER
1. This Work is by Contract No. 1 General Construction Work (GC).
1-C-5 HSMS S200 – UNDERPINNING PLAN, ELEVATION, AND DETAILS
1. Information for “Earth Anchors” can be found in Specification Section 31 4000 – Excavation Support and Protection.
1-C-6 HSMS A426 – ENLARGED FLOOR PLANS – COMMONS
1. COILING COUNTER DOOR IS CALLED OUT AS “FIRE RATED COILING DOOR” ON
DETAIL A6 HSMS A 426.
1-C-7 HSMS A601 – DOOR SCHEDULE
1. OVERHEAD DOOR TYPES “OHC” IS SPECIFIED AS DOOR PANEL 1 FOR DOOR
C109-2 AT THE FIRST FLOOR CONCOURSE IN THE DOOR AND FRAME SCHEDULE.
SPEC 08 3313 COILING COUNTER DOORS SHOULD BE REFERENCED FOR THIS
DOOR.
1-C-8 TF A101 – FLOOR PLAN, ROOF PLAN, & DOOR DETAILS
1. OVERHEAD DOOR IS CALLED OUT TO BE REMOVED AND REPLACED IN DETAIL A5
PLAN – FIRST FLOOR AND INDICATED IN THE DOOR SCHEDULE AS DOOR 401-1.
SPEC 08 3613 SECTIONAL DOORS SHOUD BE REFERENCED FOR THIS DOOR.
1-C-9 PB S100, PB A00, PB A01, PB A02, PB A03 – PRESS BOX
1. WORK DETAILED ON DRAWINGS LISTED ABOVE PERTAINING TO THE PRESS BOX
IS BY CONTRACT NO. 1 GENERAL CONSTRUCTION WORK (GC), UNLESS
SPECIFICALLY NOTED OTHERWISE.
DRAWINGS
1-D-1 Below is a list of all attached full sheets re-issued, added and Addendum drawings:
FULL SIZE REVISED SHEETS
1. HSMS S100 – OVERALL KEY PLAN 2. HSMS S200 – UNDERPINNING PLAN, ELEVATION, AND DETAILS 3. HSMS S302 – DETAILS 4. HSMS S500 – STEEL DETAILS
FULL SIZE ADDED DRAWINGS
1. HSMS E601 – RISERS
ADDENDUM DRAWINGS
1. HSMS AD2-H101 2. HSMS AD2-A001 3. HSMS AD2-A002 4. HSMS AD2-A003 5. HSMS AD2-A004
1-D-2 DRAWING HSMS H101 – FLOOR PLANS
1. REMOVE Note AA-5 from this drawing. See HSMS AD2-H101.
Addendum No. 2 Page 3 of 4
17070 Skaneateles CSD - Capital Project 2021 - Phase II - Additions and Alterations
1-D-3 DRAWING S100 – OVERALL KEY PLAN
1. REMOVE reference to soccer scoreboard.
1-D-4 DRAWING S200 – UNDERPINNING PLAN, ELEVATION, AND DETAILS
1. 3/S200, ADD three (3) new earth anchors for constructability.
2. 5/S200, sequence was revised for clarity.
1-D-5 DRAWING S302 – DETAILS
1. REMOVE soccer field scoreboard foundations and ADD football field scoreboard plan.
2. Details were RE-NUMBERED to 9/S302 AND 10/S302.
1-D-6 DRAWING S500 – STEEL DETAILS
1. ADD stiffener plate to the truss web connection detail - 9/S500
1-D-7 DRAWING HSMS A121 – GENERAL CEILING NOTES, SCHEDULE, LEGENDS AND
DETAILS
1. REVISE detail G5 to have a recessed light fixture per JD AD2-A001.
2. REVISE detail G5 to read “PNT-9” per JD AD2-A001.
3. REVISE electrical mark for fixture W1 to read W1 in lighting fixture schedule.
1-D-8 DRAWING HSMS A128 – REFLECTED CEILING PLAN – GROUND & FIRST FLOOR –
AREA I
1. REVISE ceiling type D over water fountains to be 8’-6” AFF.
1-D-9 DRAWING HSMS A428 – ENLARGED FLOOR PLANS – MS FACS
1. ADD callout C5/A510 per JD AD2-A003.
2. ADD reference elevation H6/A457 per JD AD2-A003.
3. ADD reference elevation H8/A457 per JD AD2-A003.
4. ADD reference elevation H9/A457 per JD AD2-A003.
1-D-10 DRAWING HSMS A430 – ENLARGED FLOOR PLAN – MS GYMNASIUM
1. REVISE MEP chase wall type from G6C to M6 at North and South walls. Retain sloped
GWB “cap” on both chases identified in plan and maintain all associated clearances.
1-D-11 DRAWING HSMS A432 ENLARGED FLOOR PLAN – MS LOCKER ROOMS
1. ADD elevation marks to view D1 per JD AD2-A004.
2. ADD views A4, A5 and B5 per JD AD2-A004.
1-D-12 DRAWING HSMS A510 – INTERIOR DETAILS
1. ADD detail A5 per JD AD2-A002.
2. ADD detail C5 per JD AD2-A002.
1-D-13 DRAWING HSMS A604 – FINISH MATERIAL LEGEND & GENERAL NOTES
1. ADD color to PLAM-6 to read “S4022G Sunray.”
1-D-14 DRAWING HSMS TS403 – AUDITORIUM ELECTROACOUSTIC SYSTEM SINGLE LINE
DIAGRAM
1. ADD TEXT “HSMS” BEFORE SHEET NUMBER “TS 403.”
1-D-15 DRAWING E001 SYMBOL LIST – ALL BUILDINGS
1. ADD the phrase "PROVIDE TWO (2) DATA OUTLETS FOR EACH LOCATION” to
Wireless Access Point symbol description.
Addendum No. 2 Page 4 of 4
17070 Skaneateles CSD - Capital Project 2021 - Phase II - Additions and Alterations
2. REVISE "one (1)" to read "two (2)” in the Data Outlet subscript "W" symbol description
(filled-in triangle).
3. ADD the phrase "PROVIDE TWO (2) DATA OUTLETS FOR EACH LOCATION” in the
Camera symbol description.
1-D-16 DRAWING HSMS ED103 – FIRST FLOOR DEMOLITION PLAN – AREA B
1. ADD replacement and relocation of fixture on north of Stair ST109 wall with label of
"(ER)".
1-D-17 DRAWING HSMS E101 GROUND AND FIRST FLOOR PLAN – AREA A AND D – POWER
AND SYSTEMS
1. REMOVE existing speaker (E) from room H102 (near H102F).
2. REVISE drawing note 2 to be drawing note 4 in room H102F.
1-D-18 DRAWING HSMS E200 GROUND FLOOR PLAN – AREA I – LIGHTING
1. REVISE location of switch to strike side of door in rooms M012 and M013.
1-D-19 DRAWING HSMS E202 FIRST FLOOR PLAN – AREA B – LIGHTING
1. ADD Type W1 on north wall over landing in Stair ST109.
2. ADD J-box and branch circuiting from existing location to new location to relocate from
over the stair treads in Stair ST109.
1-D-20 DRAWING E205 FIRST FLOOR PLAN – AREA E – LIGHTING
1. REMOVE detail 2.
1-D-21 DRAWING E207 FIRST FLOOR PLAN – AREA G – LIGHTING
1. REVISE Type LT track to stop at vertical edge of range.
2. REVISE labeling of "LT", circuit "24" and switch leg "c" so that they are legible.
3. REVISE "LK" light fixture to "WW1" in Corridor C116.
1-D-22 DRAWING E209 FIRST FLOOR PLAN – AREA I – LIGHTING
1. REVISE Type LW fixture to be Type FC1 in Custodian M113.
1-D-23 DRAWING E502 SCHEDULES
1. ADD Type W1 fixture similar to Type WW1, except wall mounted style with 1/2-inch wall
spacers to the Luminaire Schedule.
SPECIFICATIONS
1-S-1 SPECIFICATION SECTION 00 0300 – ADVERTISEMENT FOR BIDS
1. ADD “All bidders to send PRE-BID RFI’s to Greg Warner – [email protected] and copy Krista Hannacker – [email protected] and Aaron Jackson - [email protected] (Turner Construction)”
2. ADD “PRE-BID RFI’s can be submitted until 3pm on October 21st 2019.”
1-S-2 SPECIFICATION SECTION 12 6613
1. REPLACE pages 7 and 8 with the attached sheets.
END OF ADDENDUM No. 2
CEILING SYSTEM. REFER TO REFLECTED CEILING PLANS
1 1/
2"
METAL STUD DIAGONAL BRACE @ 48" OC MAX SECURED TO
STRUCTURE ABOVE
3 5/8" METAL STUD FRAMING SECURED TO STRUCTURE ABOVE
5/8" GYP BD. PAINT EXPOSED FACES PNT-6.
5/8" GYP BD. PAINT EXPOSED FACES PNT-9.
LIGHTING; SEE E DWGS
1' -
6"
6 5/8"
4"
4" EXTRUDED ALUMINUM PERIMETER TRIM ALL SIDES.
2
2
AM JOB NO.
DATE:
SHEET NO:
PR
OJE
CT
:
- ASHLEY MCGRAW ARCHITECTS©
17070
10/14/19
SK
AN
EA
TE
LE
S C
SD
CA
PIT
AL
PR
OJE
CT
202
1
AL
TE
RA
TIO
NS
AN
D A
DD
ITIO
NS
PR
OJE
CT
AT
TH
E
HSMSAD2-A001
SE
D:
42-1
6-01
-06-
0-00
1-02
7 (H
IGH
SC
HO
OL
/MID
DL
E S
CH
OO
L)
HIG
H S
CH
OO
L / M
IDD
LE
SC
HO
OL
AN
D P
RE
SS
BO
X
45 E
AS
T E
LIZ
AB
ET
H S
TR
EE
T, S
KA
NE
AT
EL
ES
NY
131
52
2019
1 1/2" = 1'-0"G5
CEILING DETAIL - FACS DEMOREFER TO G5/A121
A5
A510
1 1/2" COUNTERTOP OVERHANG
3/4" PLYWOOD CABINET BOX
DRAWER SLIDE
1/2" PARTICLEBOARD DRAWER
BOX W/ DOVETAIL CORNERS
SCOTT HARD ROLL TOWELS
01040 8.0" X 800'
SOLID WOOD DOWEL AND BRACKET
DRAWER HARDWARE
3/4" DRAWER BOX FRONT
1 1
/4"
4 3
/8"
1 1
/4"
ø
5"
1' -
0"
1/2
"
3/8
"1"
2' -
10"
1/2" SSM-2 BUIT UP TO 1"
W/ 1/8" EASED EDGE
9"
1"
7"
1/2" SSM-3 WALL CLADDING
G6
1/2" SSM-2 BUILT UP TO 1"
W/ 1/8" EASED EDGE AND
1 1/2" OVERHANG
3/4" PLYWOOD CABINET BOX
DRAWER SLIDE
1/2" PARTICLEBOARD
DRAWER BOX W/
DOVETAIL CORNERS
3/4" REMOVABLE SHELF
SOLID WOOD DOWEL
AND BRACKET
SCOTT HARD ROLL
TOWELS 01040 8.0" X 800'
1/2" CUT OPENING W/
FINISHED EDGES AND
TOOTHED BLADE
RB-2
AM JOB NO.
DATE:
SHEET NO:
PR
OJE
CT
:
- ASHLEY MCGRAW ARCHITECTS©
17070
10/14/19
SK
AN
EA
TE
LE
S C
SD
CA
PIT
AL
PR
OJE
CT
202
1
AL
TE
RA
TIO
NS
AN
D A
DD
ITIO
NS
PR
OJE
CT
AT
TH
E
HSMSAD2-A002
SE
D:
42-1
6-01
-06-
0-00
1-02
7 (H
IGH
SC
HO
OL
/MID
DL
E S
CH
OO
L)
HIG
H S
CH
OO
L / M
IDD
LE
SC
HO
OL
AN
D P
RE
SS
BO
X
45 E
AS
T E
LIZ
AB
ET
H S
TR
EE
T, S
KA
NE
AT
EL
ES
NY
131
52
2019
1 1/2" = 1'-0"C5
PAPER TOWEL CABINET - PLAN DETAIL
1 1/2" = 1'-0"A5
PAPER TOWEL CABINET - SECTION
ADD TO A5/A510 ADD TO C5/A510
DA
RK
RO
OM
M136A
ST
OR
AG
E
M136B
KIL
N R
OO
M
M136C
W/D
-1
RE
F-1
RE
F-1
DW
-1
MW
-1
MW
-1
MW
-1
OP
EN
FO
R
TR
AS
H
OP
EN
FO
R
TR
AS
H
OP
EN
FO
R
TR
AS
H
DW
-1
AD
AG
6
F2
G6
G6
4' - 6" 3' - 6" 3' - 3 5/8" 3' - 2 1/4"3' - 6"5' - 10 1/2"
TY
P.
7' -
9"
TY
P.
3' -
10 1
/2"
3' - 0"
A457
H6
H8
A457
H9
HD
-1
HD
-1
RN
G-1
HD
-1
M135-2
RN
G-1
RN
G-1
DW
-1
15' -
3 1
/2"
3' - 1 1/2"3' - 6"
B8
A510
FE
G6C
A457
H1
G6.6
0
G6C
G6C
G6C
G6C
G6C
G6C
A457
H9
A457
H9
2
2
A510
C5
2
A457
H6
H8
2
A457
H8
2
AM
JO
B N
O.
DA
TE
:
PR
OJE
CT
:
SH
EE
T N
O:
©-
AS
HL
EY
MC
GR
AW
AR
CH
ITE
CT
S
1707
0
10/1
4/19
HS
MS
AD
2-A
003
SK
AN
EA
TE
LE
S C
SD
CA
PIT
AL
PR
OJE
CT
202
1
HIG
H S
CH
OO
L /
MID
DL
E S
CH
OO
L A
ND
PR
ES
S B
OX
45 E
AS
T E
LIZ
AB
ET
H S
TR
EE
T, S
KA
NE
AT
EL
ES
NY
131
52
2019
SK
AN
EA
TE
LE
S C
SD
PH
AS
E 2
- A
DD
ITIO
NS
AN
D A
LT
ER
AT
ION
S
SE
D:
42-1
6-01
-06-
0-00
1-02
7 (H
IGH
SC
HO
OL
/MID
DL
E S
CH
OO
L)
1/4
" =
1'-0"
E6
MS
FA
CS
CLA
SS
RO
OM
M135 -
PLA
N
RE
FE
R T
O E
6/A
428
H7
A121
GF-1PNT-2GF-1PNT-5
GF-3 GF-3
M004-2
PNT-2
GF-3 GF-3
GF-1 PNT-5GF-1
H7
A121
M016A-1
M014A-1
PNT-5
AM JOB NO.
DATE:
SHEET NO:
PR
OJE
CT
:
- ASHLEY MCGRAW ARCHITECTS©
17070
10/14/19
SK
AN
EA
TE
LE
S C
SD
CA
PIT
AL
PR
OJE
CT
202
1
AL
TE
RA
TIO
NS
AN
D A
DD
ITIO
NS
PR
OJE
CT
AT
TH
E
HSMSAD2-A004
SE
D:
42-1
6-01
-06-
0-00
1-02
7 (H
IGH
SC
HO
OL
/MID
DL
E S
CH
OO
L)
HIG
H S
CH
OO
L / M
IDD
LE
SC
HO
OL
AN
D P
RE
SS
BO
X
45 E
AS
T E
LIZ
AB
ET
H S
TR
EE
T, S
KA
NE
AT
EL
ES
NY
131
52
2019
1/4" = 1'-0"B5
MS CORRIDOR M002 - EAST
1/4" = 1'-0"A4
MS VESTIBULE M004 - EAST
1/4" = 1'-0"A5
MS CORRIDOR M003 - EAST
ADD TO B5/A432
ADD TO A4/A432 ADD TO A5/A432
OFFICEH102E
OFFICEH102F OFFICE
H105A PASSAGEHV102
TESTING ROOMH105
1/8" = 1'-0"B1 ASBESTOS ABATEMENT - FIRST FLOOR - AREA A
ASBESTOS ABATEMENT NOTES
AA-1 WINDOW / LOUVRE GASKET - REMOVE AND PROPERLY DISPOSE OF ASBESTOS-CONTAINING BLACK GASKET
MATERIAL FROM WINDOW/LOUVRE LOCATIONS. THESE REMOVALS WILL INCLUDE THE REMOVAL AND
DISPOSAL OF METAL WINDOW SASHES, GLASS PANES, METAL FRAMES, SPANDREL IN-FILL PANELS,
SEALANTS, FLASHINGS AND ALL RELATED MATERIALS FROM WINDOW OPENINGS. ASBESTOS-CONTAINING
PLASTER IS PRESENT WHERE THE INTERIOR FACE OF THE METAL WINDOW FRAMES ABUT PLASTER
WALL/CEILING SYSTEMS. IT IS NOT INTENT OF THIS ABATEMENT DESIGN TO REMOVE INTERIOR PLASTER AS
PART OF THE ABATEMENT PROCESS, HOWEVER REMOVE ALL LOOSE AND DAMAGED PLASTER
ENCAPSULATE EDGES AND LEAVE IN A SECURE AND INTACT CONDITION SUITABLE FOR PATCHING, THIS
WORK WILL REQUIRE THE ESTABLISHMENT OF NEGATIVE PRESSURE ENCLOSURES TO PROPERLY PERFORM
WINDOW REMOVALS AS REQUIRED.
AA-2 NOT USED.
AA-3 NOT USED.
AA-4 NOT USED.
AA-5 NOT USED.
AM JOB NO.
DATE:
PROJECT:
© - ASHLEY MCGRAW ARCHITECTS
SHEET NO:
17070
10/14/19
2019
HS/MSAD2-H101
SKANEATELES CSD CAPITAL PROJECT 2021
HIGH SCHOOL / MIDDLE SCHOOL AND PRESS BOX45 EAST ELIZABETH STREET, SKANEATELES NY 13152
SKANEATELES CSD PHASE 2 - ADDITIONS AND ALTERATIONS
SED: 42-16-01-06-0-001-027 (HIGH SCHOOL/MIDDLE SCHOOL)
2
2
120 East Washington Street, Suite 414Syracuse, NY 13202
(315) 214-5526