ADDENDUM #1 June 20, 2019 PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg, Virginia IFB# 0059183 Changes and Clarifications to Specifications: General Refer to the Pre-Bid Meeting Attendance Roster listed as Attachment A. Refer to RFI and Responses listed as Attachment B. Clarification: Substantial Completion shall be achieved within 75 consecutive calendar days of Notice to Proceed and final completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion. All references to substantial and final completion shall be changed to match. Drawings Replace the Drawing Cover Sheet, Drawing Sheet A1, and Drawing Sheet A2 with the attached. Specification Section 00 41 00 – Bid Form Replace the Bid Form included in the Specifications with the attached Revised Bid Form. Specification Section 02 41 00 – Demolition Replace Section 02 41 00 included in the Specifications with the attached. Appendix A – Asphalt Shingle Scope of Work Replace Appendix A in the Specifications with the attached Appendix B – Asbestos & Lead Paint Surveys Replace Appendix B in the specifications with the attached ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN THE SAME

Upload: others

Post on 31-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

ADDENDUM #1

June 20, 2019

PROJECT: Virginia Polytechnic Institute and State University

Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project

Leesburg, Virginia

IFB# 0059183

Changes and Clarifications to Specifications:

General

Refer to the Pre-Bid Meeting Attendance Roster listed as Attachment A.

Refer to RFI and Responses listed as Attachment B.

Clarification: Substantial Completion shall be achieved within 75 consecutive calendar days of Notice to

Proceed and final completion shall be achieved within 30 consecutive calendar days after the date of

Substantial Completion. All references to substantial and final completion shall be changed to match.

Drawings

Replace the Drawing Cover Sheet, Drawing Sheet A1, and Drawing Sheet A2 with the attached.

Specification Section 00 41 00 – Bid Form

Replace the Bid Form included in the Specifications with the attached Revised Bid Form.

Specification Section 02 41 00 – Demolition

Replace Section 02 41 00 included in the Specifications with the attached.

Appendix A – Asphalt Shingle Scope of Work

Replace Appendix A in the Specifications with the attached

Appendix B – Asbestos & Lead Paint Surveys

Replace Appendix B in the specifications with the attached

ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN THE SAME

Page 2: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

A signed acknowledgment of this addendum must be attached to the Bid. Signature on this addendum does

not constitute the bidder’s signature on the original bid document. The original bid document shall also be

signed.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ACKNOWLEDGMENT:

________________________ ________________________

Name of Firm Signature

________________________ ________________________

Title Date

END OF ADDENDUM #1

Page 3: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,
DCisek
Text Box
Addendum #1 Attachment A - Pre-Bid Attendance Roster
DCisek
Text Box
Page 4: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,
Page 5: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

G1530-19-364415 EMC Roof Replacement

IFB 0059183

Request for Information and Responses

Following are the Requests for Information received on 6/17/19 for the EMC Roof Replacement Project,

IFB 0059183, as well as the responses:

RFI 1: The “GAF – Weatherwood Shingles” – What is the exact materials requested for the entire

shingle roof replacement (ex. Felt paper, nails, warranties, etc)

Response: Provided in Scope of Work attached.

RFI 2: When will the ‘specifications and drawings prepared by FEA” be provided?

Response: Attached with Addendum 1.

DCisek
Text Box
Attachment B: RFI Responses
Page 6: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

BUILDING 910

2015 EDITION

VIRGINIA UNIFORM STATEWIDE BUILDING CODE,

EQUINE MEDICAL CENTER

AND STATE UNIVERSITY

VIRGINIA POLYTECHNIC INSTITUTE

COMMONWEALTH OF VIRGINIA

June 2019

SHEET NO.

INDEX OF DRAWINGS

DRAWING TITLE

CONSTRUCTION PLAN

IFB # 0059183

ROOF REPLACEMENT

A1

BUILDING CODE DATA

APPLICABLE CODES:

APPLICABLE CODE GOVERNING RENOVATION WORK: 2015 VIRGINIA EXISTING BUILDING CODE

PRESCRIPTIVE COMPLIANCE METHOD:

· GENERAL: EXISTING MATERIALS WILL REMAIN IN USE AND NEW AND REPLACEMENT

MATERIALS PERMITTED BY THE APPLICABLE CODE WILL BE USED.

· REPAIRS: BUILDING AND STRUCTURES, AND PARTS THEREOF, SHALL BE REPAIRED IN

COMPLIANCE WITH SECTION 501.2 OF THE VEBC. WORK ON NON DAMAGED COMPONENTS

THAT IS NECESSARY FOR THE REQUIRED REPAIR OF DAMAGED COMPONENTS SHALL BE

CONSIDERED PART OF THE REPAIR AND SHALL NOT BE SUBJECT TO THE REQUIREMENTS

OF ALTERATIONS.

GOVERNING BUILDING CODE:

ORIGINAL CONSTRUCTION - THE UNIFORM STATEWIDE BUILDING CODE, 1978

USE GROUP CLASSIFICATION B (BUSINESS), THE USE GROUP CLASSIFICATION DOES NOT

CHANGE FROM EXISTING CONDITIONS.

ALLOWABLE HEIGHT AND AREAS: NO INCREASE IN EXISTING FOOTPRINT.

FIRE RESISTANCE RATING FOR BUILDING ELEMENTS: NOT CHANGED

TYPE OF CONSTRUCTION : 4B, 3C, 2C

AUTOMATIC SPRINKLER SYSTEM: BUILDING IS EQUIPPED PARTIALLY WITH AN AUTOMATIC

SPRINKLER SYSTEM

FIRE ALARM AND DETECTION SYSTEMS: BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.

CONSTRUCTION DETAILS A2

LEESBURG, VIRGINIA

1

AutoCAD SHX Text
SITE LOCATION MAP
AutoCAD SHX Text
ASBESTOS & LEAD PAINT NOTE AN ASBESTOS SURVEY REPORT WAS ISSUED ON JUNE 13, 2019 BY HDH TECHNICAL, INC. ASBESTOS-CONTAINING MATERIALS WERE FOUND IN THE MASTIC ON THE SMALL EPDM ROOF AND THE BLACK FLEXIBLE SEALANT AT THE LOUVERS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE, AND UNIVERSITY REQUIREMENTS FOR REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS (ACM). IF A SUSPECT ASBESTOS MATERIAL IS ENCOUNTERED IN THE COURSE OF THE WORK THAT IS NOT DISCUSSED AS PART OF THE REPORT, THE WORK MUST BE STOPPED IMMEDIATELY AND VIRGINIA TECH SHOULD BE CONTACTED IMMEDIATELY AT (540) 231-0708. A LEAD PAINT INSPECTION WAS PERFORMED AND REPORT ISSUED BY HDH TECHNICAL INC. ON JUNE 13, 2019. LEAD-BASED PAINT WAS IDENTIFIED ON THE THREE SEMI-CIRCLE METAL DORMERS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH THE REQUIREMENTS OF THE OSHA LEAD STANDARD, 29 CFR 1926.62 AND SHALL EXERCISE DUE DILIGENCE TO AVOID THE CREATION OF LEAD DUST. IF SUSPECT LEAD PAINT MATERIALS ARE ENCOUNTERED IN THE COURSE OF THE WORK THAT IS NOT DISCUSSED AS PART OF THE REPORT, THE WORK MUST BE STOPPED IMMEDIATELY AND VIRGINIA TECH SHOULD BE CONTACTED IMMEDIATELY AT (540) 231-0708.
Page 7: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

13'6"

10"

10"

3'8"

A

3

2

3

2

2

2

2

2

2

2

2

2

A

B

83'6"58'6"

39'8"

4'5"

A

B

C

1

1

ADDITIVE BID ITEM #2: INSTALL GUTTERS AND DOWNSPOUTS

1

06/17/19

MLT

1

DLW

ADDENDUM #1

AutoCAD SHX Text
PREPARE DECK SURFACE IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND ROOF SYSTEM MANUFACTURER'S REQUIREMENTS PRIOR TO INSTALLATION OF NEW ROOFING MATERIALS. REPAIR EXISTING DECK AS REQUIRED BY THE PROJECT SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS. ALL NEW ROOFING MATERIALS SHALL BE FREE OF ASBESTIFORM MINERALS. PROVIDE ALL REQUIRED MECHANICAL AND ELECTRICAL MODIFICATIONS FOR EXISTING HVAC UNIT SUPPLY CONDUITS. LIFT EXISTING ROOFTOP UNITS, REMOVE AND REPLACE EXISTING SLEEPER DUNNAGE AS REQUIRED. DISCONNECT, EXTEND, AND RECONNECT IN-KIND, ALL WIRING CONDUIT. REMOVE AND REPLACE EXISTING DRAIN ASSEMBLIES WITH NEW ASSEMBLIES TO MATCH EXISTING SIZE AND CONFIGURATION. CONSTRUCT SUMPS IN THE INSULATION AT DRAIN LOCATIONS. INSTALL A FULLY-ADHERED, SINGLE-PLY 60-MIL EPDM MEMBRANE OVER VAPOR RETARDER, BASE INSULATION LAYERS, TAPERED INSULATION, AND COVERBOARD. BASE INSULATION LAYER SHALL BE POLYISOCYANURATE MECHANICALLY ATTACHED OVER SPECIFIED VAPOR RETARDER. FLAT FILL INSULATION, POLYISOCYANURATE, SHALL BE INSTALLED OVER BASE LAYER. SUBSEQUENT LAYERS OF INSULATION AND COVERBOARD SHALL BE SET IN POLYURETHANE ADHESIVE. TAPERED INSULATION SHALL BE POLYISOCYANURATE, TAPERED AT 1/4-INCH PER FOOT. BEGIN INSTALLATION OF TAPERED INSULATION AT DRAIN LINES. CRICKETS AND SADDLES SHALL BE CONSTRUCTED WITH POLYISOCYANURATE, TAPERED AT 1/2 INCH PER FOOT. PROHIBIT TRAFFIC OVER COMPLETED ROOF SECTIONS. PROHIBIT STORAGE OF EQUIPMENT AND MATERIALS ON AND MINIMIZE TRAFFIC OVER COMPLETED ROOF SECTIONS. PROTECTION OF EXISTING AND NEW ROOF SURFACES THROUGHOUT THE CONTRACT SHALL BE THE CONTRACTOR'S RESPONSIBILITY. INSTALL THROUGH-WALL OVERFLOW SCUPPERS AT LOCATIONS SHOWN ON THE CONSTRUCTION PLAN. EACH SCUPPER SHALL BE A MINIMUM OF 8 INCHES WIDE AND 4 INCHES TALL. BOTTOM OF SCUPPER SHALL BE NO MORE THAN 2 INCHES ABOVE FINISHED MEMBRANE HEIGHT. RAISE SCUPPERS TO ACCOMMODATE NEW ROOF THICKNESS. AFTER THE INSTALLATION OF THE EPDM MEMBRANE, THE ENGINEER, OWNER, MANUFACTURER REPRESENTATIVE AND CONTRACTOR SHALL OBSERVE THE ROOF SURFACE IN AN ATTEMPT TO IDENTIFY ANY AREAS THAT POND WATER. ANY AREAS THAT POND WATER SHALL BE ADDRESSED BY THE INSTALLATION OF ADDITIONAL INSULATION, OR OTHER METHODS RECOMMENED BY THE ENGINEER. THE FINISHED ROOF SURFACE SHALL PROVIDE POSITIVE SLOPE AND NOT POND WATER.
AutoCAD SHX Text
EXISTING ROOF CONSTRUCTION SCHEDULE
AutoCAD SHX Text
MEMBRANE
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
AREA
AutoCAD SHX Text
7.
AutoCAD SHX Text
6.
AutoCAD SHX Text
5.
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
DECK TYPE
AutoCAD SHX Text
THE EXISTING ROOF CONSTRUCTION INFORMATION PROVIDED IS BASED ON A 2019 STUDY PERFORMED BY FACILITY ENGINEERING ASSOCIATES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING FIELD CONDITI0NS PRIOR TO SUBMISSION OF BID. REMOVE ALL EXISTING ROOF MEMBRANE AND INSULATION MATERIALS DOWN TO THE SURFACE OF THE WOOD ROOF DECK. EXAMINE ROOF DECK SURFACE AND DETERMINE IF IT IS IN SUITABLE CONDITION FOR ROOF INSULATION AND MEMBRANE WORK. REPAIR ROOF DECK WHERE DETERIORATED OR DAMAGED. PROTECT EXISTING EQUIPMENT SUCH AS: MECHANICAL UNITS, AND OTHER ROOFTOP EQUIPMENT DURING RE-ROOFING OPERATIONS. VERIFY ROOF-MOUNTED CURBS, PIPES, AND ACCESSORIES ARE PROPERLY INSTALLED AND SECURED. NOTIFY ENGINEER IMMEDIATELY IF ANY ROOFTOP ITEMS ARE NOT PROPERLY SECURED. BEFORE PROCEEDING WITH WORK, SECURE ITEMS AT THE DIRECTION OF THE ENGINEER. AN ASBESTOS SURVEY WAS PERFORMED AND NO ASBESTOS-CONTAINING MATERIALS WERE FOUND.
AutoCAD SHX Text
%%UDEMOLITION NOTES
AutoCAD SHX Text
%%UCONSTRUCTION NOTES
AutoCAD SHX Text
4.
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
5.
AutoCAD SHX Text
4.
AutoCAD SHX Text
2.
AutoCAD SHX Text
1.
AutoCAD SHX Text
HVAC UNIT
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
DEFINITION
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
INSULATION TYPE
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
RIDGE LINE
AutoCAD SHX Text
VALLEY LINE
AutoCAD SHX Text
ROOF SECTION DESIGNATION
AutoCAD SHX Text
THROUGH WALL SCUPPER
AutoCAD SHX Text
1,486
AutoCAD SHX Text
EPDM
AutoCAD SHX Text
POLYISOCYANURATE/GLASS-FACED GYPSUM
AutoCAD SHX Text
PLYWOOD
AutoCAD SHX Text
1,127
AutoCAD SHX Text
EPDM
AutoCAD SHX Text
POLYISOCYANURATE/GLASS-FACED GYPSUM
AutoCAD SHX Text
PLYWOOD
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/2" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
1/4" per ft.
AutoCAD SHX Text
INSULATION TAPER LINE
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
N
AutoCAD SHX Text
3.
AutoCAD SHX Text
3.
AutoCAD SHX Text
%%uFASTENER SCHEDULE
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
HORIZONTAL WOOD
AutoCAD SHX Text
NAILER
AutoCAD SHX Text
HORIZONTAL WOOD
AutoCAD SHX Text
NAILER
AutoCAD SHX Text
HORIZONTAL WOOD
AutoCAD SHX Text
NAILER
AutoCAD SHX Text
CONC. BLOCK OR
AutoCAD SHX Text
MASONRY WALL
AutoCAD SHX Text
16 D GALV. NAILS
AutoCAD SHX Text
DIRECT
AutoCAD SHX Text
DIRECT
AutoCAD SHX Text
ELEMENT
AutoCAD SHX Text
SUBSTRATE
AutoCAD SHX Text
FASTENER
AutoCAD SHX Text
SPACING
AutoCAD SHX Text
2 ROWS/24" O.C. EACH ROW, MIN.
AutoCAD SHX Text
RESISTANCE OF 100# (NOTE 1)
AutoCAD SHX Text
1 1/4" PENET., MIN. PULLOUT
AutoCAD SHX Text
NUMBER AND
AutoCAD SHX Text
1. FASTENER FREQUENCY SHALL BE DOUBLED WITHIN 10 FEET OF CORNERS. 2. ALL FASTENERS IN PRESSURE-TREATED WOOD SHALL HAVE FACTORY-APPLIED COATING WHICH PROTECTS AGAINST CORROSION.
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
12' O.C. STAGGERED (NOTE 1) MIN. 200# PULLOUT RESISTANCE EA
AutoCAD SHX Text
1/4-INCH CARBON
AutoCAD SHX Text
STEEL SCREWS
AutoCAD SHX Text
COUNTERFLASHING
AutoCAD SHX Text
METAL
AutoCAD SHX Text
MASONRY
AutoCAD SHX Text
DIRECT
AutoCAD SHX Text
12" O.C. (NOTE 1)
AutoCAD SHX Text
NAIL IN EXPANSION ANCHOR
AutoCAD SHX Text
HOOK STRIP
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
#8
AutoCAD SHX Text
WOOD SCREWS
AutoCAD SHX Text
DIRECT
AutoCAD SHX Text
12" O.C. (NOTE 1)
AutoCAD SHX Text
FASTENER
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
DIRECT
AutoCAD SHX Text
AS REQUIRED BY MANUFACTURER
AutoCAD SHX Text
MANUFACTURER RECOMMENDED SCREW
AutoCAD SHX Text
%%UKEY PLAN
AutoCAD SHX Text
N
AutoCAD SHX Text
C
AutoCAD SHX Text
300
AutoCAD SHX Text
EPDM
AutoCAD SHX Text
NONE
AutoCAD SHX Text
PLYWOOD
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
C A D D F I L E
AutoCAD SHX Text
of
AutoCAD SHX Text
FACILITY ENGINEERING ASSOCIATES, P.C.
AutoCAD SHX Text
FAIRFAX, VIRGINIA 22030
AutoCAD SHX Text
11001 LEE HIGHWAY, SUITE D
AutoCAD SHX Text
PROFESSIONAL SEAL
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
P.C. UPON DISCOVERY OF ANY DISCREPANCIES.
AutoCAD SHX Text
SHALL NOTIFY THE OWNER AND FACILITY ENGINEERING ASSOCIATES,
AutoCAD SHX Text
OR THE FABRICATION OF ANY NEW MATERIALS. THE CONTRACTOR
AutoCAD SHX Text
BY THE CONTRACTOR PRIOR TO START OF ANY NEW CONSTRUCTION
AutoCAD SHX Text
DIMENSIONS. THE INFORMATION ON THIS PLAN SHALL BE VERIFIED
AutoCAD SHX Text
WRITTEN DIMENSIONS, WHERE PROVIDED, GOVERN OVER SCALED
AutoCAD SHX Text
A P P
AutoCAD SHX Text
S U B
AutoCAD SHX Text
B Y
AutoCAD SHX Text
D A T E
AutoCAD SHX Text
R E V
AutoCAD SHX Text
D E S C R I P T I O N
AutoCAD SHX Text
D E S I G N E D
AutoCAD SHX Text
D R A W N
AutoCAD SHX Text
C H E C K E D
AutoCAD SHX Text
A P P R O V E D
AutoCAD SHX Text
D A T E
AutoCAD SHX Text
S C A L E
AutoCAD SHX Text
P R O J E C T N O.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
CONSTRUCTION PLAN
AutoCAD SHX Text
VIRGINIA POLYTECHNIC INSTITUTE
AutoCAD SHX Text
AND STATE UNIVERSITY
AutoCAD SHX Text
ROOF REPLACEMENT
AutoCAD SHX Text
MARION duPONT SCOTT EQUINE MEDICAL CENTER
AutoCAD SHX Text
LEESBURG, VIRGINIA
AutoCAD SHX Text
DLW
AutoCAD SHX Text
MLT
AutoCAD SHX Text
DLW
AutoCAD SHX Text
MPK
AutoCAD SHX Text
06/03/19
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
R01.2018.009411
AutoCAD SHX Text
A1
AutoCAD SHX Text
A2
Page 8: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

4ROOF DRAIN

(TYPICAL)

2

06/17/19

MLT

1

DLW

ADDENDUM #1

AutoCAD SHX Text
SEALANT
AutoCAD SHX Text
SCUPPER INSERT
AutoCAD SHX Text
EXISTING PARAPET
AutoCAD SHX Text
THROUGH-WALL SCUPPER AND PARAPET COPING
AutoCAD SHX Text
BOTTOM OF SCUPPER SHALL BE MAXIMUM 2 INCHES ABOVE MEMBRANE SURFACE AT PARAPET
AutoCAD SHX Text
1
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
EPDM FLASHING
AutoCAD SHX Text
ANCHOR STRIP OR PLATES, FASTEN IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS
AutoCAD SHX Text
EPDM ROOF MEMBRANE
AutoCAD SHX Text
COVERBOARD
AutoCAD SHX Text
2
AutoCAD SHX Text
EXPANDING SHANK FASTENERS OR WOOD SCREWS
AutoCAD SHX Text
TERMINATION BAR FASTENED WITH APPROPRIATE FASTENERS
AutoCAD SHX Text
INSTALL COMPATIBLE SEALANT BEHIND MEMBRANE
AutoCAD SHX Text
SHEET METAL COUNTERFLASHING
AutoCAD SHX Text
FLASHING MEMBRANE
AutoCAD SHX Text
SURFACE MOUNTED COUNTER FLASHING
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING WOOD SOFFIT AND TRIM ABOVE
AutoCAD SHX Text
EXISTING MASONRY WALL
AutoCAD SHX Text
PRESSURE-TREATED WOOD NAILER AS REQUIRED TO ACHIEVE 8" FLASHING HEIGHT
AutoCAD SHX Text
SHEET METAL PARAPET CAP
AutoCAD SHX Text
FASTENERS APPROX. 12" O.C.
AutoCAD SHX Text
1" MINIMUM BELOW BLOCKING
AutoCAD SHX Text
CONTINUOUS CLEAT
AutoCAD SHX Text
CONTINUOUS SHIM
AutoCAD SHX Text
HIGH CARBON CONCRETE SCREWS WITH PROTECTIVE COATING
AutoCAD SHX Text
EXISTING WOOD DECK
AutoCAD SHX Text
INSTALL APPROPRIATE SEALANT AND TOOL TO FACILITATE WATER RUN-OFF
AutoCAD SHX Text
EXPANDING SHANK FASTENERS
AutoCAD SHX Text
TERMINATION BAR FASTENED WITH APPROPRIATE FASTENERS
AutoCAD SHX Text
INSTALL COMPATIBLE SEALANT BEHIND MEMBRANE
AutoCAD SHX Text
SHEET METAL COUNTERFLASHING
AutoCAD SHX Text
FLASHING MEMBRANE
AutoCAD SHX Text
ANCHOR STRIP OR PLATES, FASTEN IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS
AutoCAD SHX Text
SURFACE MOUNTED COUNTER FLASHING
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
GASKETED FASTENERS APPROX. 12" O.C.
AutoCAD SHX Text
TAPERED INSULATION
AutoCAD SHX Text
FILL INSULATION
AutoCAD SHX Text
BASE INSULATION
AutoCAD SHX Text
ANCHOR STRIP OR PLATES, FASTEN IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS
AutoCAD SHX Text
EPDM ROOF MEMBRANE
AutoCAD SHX Text
COVERBOARD
AutoCAD SHX Text
EXISTING WOOD DECK
AutoCAD SHX Text
TAPERED INSULATION
AutoCAD SHX Text
FILL INSULATION
AutoCAD SHX Text
BASE INSULATION
AutoCAD SHX Text
EPDM ROOF MEMBRANE
AutoCAD SHX Text
COVERBOARD
AutoCAD SHX Text
EXISTING WOOD DECK
AutoCAD SHX Text
TAPERED INSULATION
AutoCAD SHX Text
FILL INSULATION
AutoCAD SHX Text
BASE INSULATION
AutoCAD SHX Text
VAPOR RETARDER
AutoCAD SHX Text
VAPOR RETARDER
AutoCAD SHX Text
VAPOR RETARDER
AutoCAD SHX Text
EXISTING BRICK MASONRY OR WOOD SUBSTRATE, USE APPROPRIATE FASTENER
AutoCAD SHX Text
6. ALL SEAMS SHALL BE OVERLAPPED A MINIMUM OF 6 INCHES
AutoCAD SHX Text
FASTENERS IN PREDRILLED HOLES, (MASONRY AND CONCRETE SUBSTRATE),
AutoCAD SHX Text
STEEL WASHERS, (WOOD SUBSTRATE), 8 INCHES ON CENTERS.
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
#10 STAINLESS STEEL METAL SCREWS WITH 1-INCH DIAMETER STAINLESS
AutoCAD SHX Text
5. ALL MATERIALS SHALL BE NEW, UNLESS DESIGNATED AS "EXISTING".
AutoCAD SHX Text
FASTENED WITH 3/16-INCH STAINLESS STEEL NAIL-IN EXPANSION
AutoCAD SHX Text
4. THE TOP EDGE OF ALL BASE FLASHINGS SHALL BE POSITIVELY
AutoCAD SHX Text
SCUPPER INSERTS
AutoCAD SHX Text
METAL TYPE
AutoCAD SHX Text
CONDITION
AutoCAD SHX Text
PERIMETER COUNTER FLASHING
AutoCAD SHX Text
FLASHING REQUIREMENTS.
AutoCAD SHX Text
THE FOLLOWING IS A SUMMARY OF THE METAL
AutoCAD SHX Text
MANUFACTURER'S REQUIREMENTS, THE PROJECT SPECIFICATIONS, AND
AutoCAD SHX Text
SECTIONS NOT TO EXCEED 10-FEET IN LENGTH.
AutoCAD SHX Text
3. ALL EDGE METAL IS TO BE FABRICATED IN
AutoCAD SHX Text
NAILERS TO INCREASE EDGE HEIGHTS AS REQUIRED.
AutoCAD SHX Text
TREATED WOOD. PROVIDE PROPER SIZE AND QUANTITY OF WOOD
AutoCAD SHX Text
2. ALL NAILERS, BLOCKING AND CANTS SHALL BE NEW PRESSURE
AutoCAD SHX Text
FACTORY MUTUAL SYSTEMS BULLETIN 1-49.
AutoCAD SHX Text
1. ALL FASTENERS REQUIRED SHALL BE PROVIDED AND PLACED IN
AutoCAD SHX Text
ACCORDANCE WITH THESE DETAILS, THE FASTENER SCHEDULE,
AutoCAD SHX Text
%%uDETAIL NOTES
AutoCAD SHX Text
24-GAUGE PRE-FINISHED
AutoCAD SHX Text
CAP FLASHING
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
INSULATION FASTENERS
AutoCAD SHX Text
INSULATION FASTENERS
AutoCAD SHX Text
INSULATION FASTENERS
AutoCAD SHX Text
24-GAUGE PRE-FINISHED
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
BOWL FLANGE AND ROOF MEMBRANE
AutoCAD SHX Text
INSTALL SEALANT BETWEEN DRAIN
AutoCAD SHX Text
DRAIN BOWL
AutoCAD SHX Text
CLAMPING RING
AutoCAD SHX Text
DECK CLAMP
AutoCAD SHX Text
TAPERED
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
POLYISOCYANURATE
AutoCAD SHX Text
ROOF DECK
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EPDM MEMBRANE
AutoCAD SHX Text
GLASS-FACED GYPSUM COVERBOARD
AutoCAD SHX Text
ROUND CUT IN EPDM MEMBRANE; EXTEND 1-INCH PAST CLAMPING RING HOLE IN MEMBRANE SHOULD BE LARGER THAN DRAIN PIPE DIAMETER
AutoCAD SHX Text
VAPOR RETARDER NOT SHOWN FOR CLARITY
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
EXISTING BRICK MASONRY OR WOOD SUBSTRATE, USE APPROPRIATE FASTENER
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
C A D D F I L E
AutoCAD SHX Text
of
AutoCAD SHX Text
FACILITY ENGINEERING ASSOCIATES, P.C.
AutoCAD SHX Text
FAIRFAX, VIRGINIA 22030
AutoCAD SHX Text
11001 LEE HIGHWAY, SUITE D
AutoCAD SHX Text
PROFESSIONAL SEAL
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
P.C. UPON DISCOVERY OF ANY DISCREPANCIES.
AutoCAD SHX Text
SHALL NOTIFY THE OWNER AND FACILITY ENGINEERING ASSOCIATES,
AutoCAD SHX Text
OR THE FABRICATION OF ANY NEW MATERIALS. THE CONTRACTOR
AutoCAD SHX Text
BY THE CONTRACTOR PRIOR TO START OF ANY NEW CONSTRUCTION
AutoCAD SHX Text
DIMENSIONS. THE INFORMATION ON THIS PLAN SHALL BE VERIFIED
AutoCAD SHX Text
WRITTEN DIMENSIONS, WHERE PROVIDED, GOVERN OVER SCALED
AutoCAD SHX Text
A P P
AutoCAD SHX Text
S U B
AutoCAD SHX Text
B Y
AutoCAD SHX Text
D A T E
AutoCAD SHX Text
R E V
AutoCAD SHX Text
D E S C R I P T I O N
AutoCAD SHX Text
D E S I G N E D
AutoCAD SHX Text
D R A W N
AutoCAD SHX Text
C H E C K E D
AutoCAD SHX Text
A P P R O V E D
AutoCAD SHX Text
D A T E
AutoCAD SHX Text
S C A L E
AutoCAD SHX Text
P R O J E C T N O.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
CONSTRUCTION DETAILS
AutoCAD SHX Text
VIRGINIA POLYTECHNIC INSTITUTE
AutoCAD SHX Text
AND STATE UNIVERSITY
AutoCAD SHX Text
ROOF REPLACEMENT
AutoCAD SHX Text
MARION duPONT SCOTT EQUINE MEDICAL CENTER
AutoCAD SHX Text
LEESBURG, VIRGINIA
AutoCAD SHX Text
DLW
AutoCAD SHX Text
MLT
AutoCAD SHX Text
DLW
AutoCAD SHX Text
MPK
AutoCAD SHX Text
06/03/2019
AutoCAD SHX Text
NTS
AutoCAD SHX Text
R01.2018.009411
AutoCAD SHX Text
A2
AutoCAD SHX Text
A2
Page 9: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 Roof Replacement 00 41 00.1 Revised Bid Form June 2019

SECTION 00 41 00

BID FORM

DATE: ______________

PROJECT: Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Leesburg, Virginia IFB # 0059183

To: Commonwealth of Virginia Virginia Polytechnic Institute & State University Procurement Department Blacksburg, Virginia 24061 In compliance with your Invitation for Bids, the undersigned bidder proposes to furnish all labor, materials, and equipment and perform all work necessary for construction of this project, in accordance with the contract documents and Addenda as noted on the next page, as prepared by Facility Engineering Associates, P.C., 12701 Fair Lakes Circle, Suite 101, Fairfax, Virginia, 22033 for the consideration of the following: BASE BID

Fixed price for replacement of the existing low-slope roof systems and steep-pitch roof systems, including 960 square feet of wood deck replacement and 250 board feet of wood replacement, according to the drawings, specifications, and scope of work prepared for Virginia Tech, now on file in the office of the Owner: TOTAL BASE BID AMOUNT is:

_________________________________________________dollars ($ ______________ ) state amount in words and figures Provide unit cost for wood roof deck replacement. The unit cost provided will be used for any add/deduct to the Bid quantity. _______________________________________________ per square foot ($_________/SF) state unit cost in words and figures Provide unit cost for wood replacement. The unit cost provided will be used for any add/deduct to the Bid quantity. _______________________________________________ per board foot ($_________/BF) state unit cost in words and figures

Page 10: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 Roof Replacement 00 41 00.2 Revised Bid Form June 2019

ADDITIVE BID #1:

Fixed fee price for replacement of all existing gutters, according to the drawings, specifications, and scope of work prepared for Virginia Tech, now on file in the office of the Owner: ______________________________________________ ($ _______________ ) state amount in words and figures

ADDITIVE BID #2:

Fixed fee price for installation of new gutters and downspouts where non-existant, according to the drawings, specifications, and scope of work prepared for Virginia Tech, now on file in the office of the Owner: ______________________________________________ ($ _______________ )

Contract award will be based on the Total Base Bid and Additive Bids as the Owner in its discretion decides to award. Bidders shall rely on the National Weather Service Sterling, Virginia public historical climatological records. The undersigned understands that time is of the essence. Substantial Completion shall be acheived within 75 consecutive calendar days of Notice to Proceed and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion determined by the A/E.

Acknowledgment is made of receipt of the following Addenda: ______________________________ ___________________________________________________________________________________.

If notice of acceptance of this bid is given to the undersigned within 30 days after the date of opening of the bids, or any time thereafter before this bid is withdrawn, the undersigned will execute and deliver a contract in the prescribed form (Commonwealth of Virginia Contract Between Owner and Contractor, Form CO-9) within 10 days after the contract has been presented to him for signature. The required payment and performance bonds, on the forms prescribed, shall be delivered to the Owner along with the signed Contract. Immigration Reform and Control Act of 1986: The undersigned certifies that it does not and will not during the performance of the Contract for this project violate the provisions of the Federal Immigration Reform and Control Act of 1986, which prohibits employment of illegal aliens. DISQUALIFICATIONS OF CONTRACTORS: By signing this bid or proposal, the undersigned certifies that this Bidder or any officer, director, partner, or owner is not currently barred from bidding on contracts by any Agency of the Commonwealth of Virginia, or any public body or agency of another state, or any agency of the federal government, nor is this Bidder a subsidiary or affiliate of any

Page 11: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 Roof Replacement 00 41 00.3 Revised Bid Form June 2019

firm/corporation that is currently barred from bidding on contracts by any of the same. We have attached an explanation of any previous disbarment(s) and copies of notice(s) of reinstatement(s). Either the undersigned or one of the following individuals, if any, is authorized to modify this bid prior to the deadline for receipt of bids by writing the modification and signing his name on the face of the bid, on the envelope in which it is enclosed, or on a separate document, or on a document which is telefaxed to the Owner or by sending the Owner a telegraphic message: ______________________________________________________ ______________________________________________________ ______________________________________________________

I certify that the firm name given below is the true and complete name of the bidder and that the bidder is legally qualified and licensed by the Commonwealth of Virginia, Department of Commerce, State Board for Contractors, to perform all Work included in the scope of the Contract.

Virginia License No. _____________ Contractor Class ________________ Specialty _______________________ Valid Until ______________________ FEIN/SSN:_____________________

Bidder _________________________ (Name of Firm)

By _____________________________ (Signature)

_______________________________ (Typed Name)

Title ___________________________

If Partnership (List Partner’s Names) _______________________________ _______________________________ _______________________________ _______________________________

If Corporation, affix Corporate Seal & list State of Incorporation State: ___________________________ (Affix Seal)

Business Address: ____________________________________ ________________________________________________________________________ ____________________________________Telephone # _________________________

Page 12: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 Roof Replacement 00 41 00.4 Revised Bid Form June 2019

Virginia State Corporation Commission ID No.: _______________; or If Contractor is a foreign business entity not required to be authorized to transact business in the Commonwealth under Titles 13.1 or 50 of the Code of Virginia, or as otherwise required by law, please provide an explanation as to why such entity is not required to be so authorized: _____________________________________________________________________________________________________________________________________________________________________________________________. Contractor’s Proposed Small Business Participation:% (required)

END OF BID FORM

Page 13: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 Facility Engineering Associates, P.C. Roof Replacement FEA Project No.: R01.2018.009411

June 2019 02 41 00.1 Demolition

SECTION 02 41 00 DEMOLITION

PART 1 GENERAL 1.01 DESCRIPTION A. Work includes the removal and disposal of all existing roof components as indicated on the

Drawings and in the Scope of Work. The Owner has the right to retain or salvage all or any part for their use.

PART 2 PRODUCTS: NOT USED.

PART 3 EXECUTION

3.01 DEMOLITION A. Remove existing roof assembly components as denoted. Demolish designated areas

completely and remove from the site, except for materials indicated to remain or to be installed, or salvageable.

B. Removed material shall go directly from the roof to an approved container. Material shall not be placed on ground or other areas of building.

C. Locate demolition equipment on the structure and remove materials so as not to impose excessive loads to supporting walls, decking, framing, ceilings, or any other part of the building.

D. Remove all debris, rubbish, and other demolition materials operations from the site. E. To the maximum extent, the Contractor shall recycle materials resulting from demolition. F. Transport waste materials removed during demolition and dispose of off-site. Do not store

waste material without concealing in suitable waste containers. G. Contractor shall pay all costs associated with recycling and waste disposal. H. All persons involved in the disturbance of the following lead-containing painted surfaces

shall be adequately trained. Any lead-based paint disturbance shall be performed in accordance with EPA, OSHA, and DPOR requirements. The following surfaces were identified to contain lead-based paint: 1. Three Semi-circle dormers with brown paint.

I. The following non-friable asbestos containing materials shall be removed prior to work. Removal shall be performed by licensed, contract personnel using approved methods. 1. Flexible sealant located at louvers to the extent removal required. 2. Mastic adhered to EPDM at the small low-slope roof area.

3.02 EXISTING ROOF COMPOSITION A. Contractor shall inspect and verify all existing roof conditions, roof deck type, and roof

compositions prior to submitting a bid. Existing roof composition given is for informational purposes only. Any investigative openings or test cuts made shall be repaired in accordance with industry standards so as to not cause a leak.

3.03 OCCUPANCY A. Owner will occupy the building immediately beneath and adjacent to areas of demolition.

Conduct selective demolition in a manner that will minimize need for disruption of Owner’s normal operations.

END OF SECTION 02 41 00

Page 14: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,
DCisek
Text Box
DCisek
Text Box
APPENDIX A - ASPHALT SHINGLE SCOPE OF WORK
Page 15: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 June 2019

APPENDIX A Virginia Tech

Virginia-Maryland Regional College of Veterinary Medicine Marion duPont Scott Equine Medical Center

Building 910 Roof Replacement Leesburg, Virginia

Scope of Work

Perform all work, including preparation, testing, installation, and clean-up in accordance with the manufacturer’s instructions and guidelines, industry standards set forth by The National Roofing Contractors Association (NRCA), APA, all applicable Codes and regulations, and this Scope of Work. Substantial completion shall be achieved with 75 consecutive calendar days of the issuance of the Notice to Proceed. This work shall include all shingle roofs and the small (less than 3 squares) low-slope roof at Building 910.

General

1. Owner will obtain the building permit. Contractor shall obtain and pay for all other required permits.

2. Roof access shall be via the building exterior only. The Contractor shall not access the roofs through the building interior.

3. Contractor shall provide their own temporary toilet. The building restrooms shall not be utilized by Contractor personnel. Keep restroom in clean condition.

4. The loading dock cannot be closed during the work. Temporary use of loading dock may be coordinated with Owner.

5. Coordinate with Owner for the placement of a dumpster and ground storage areas. Locations shall be chosen that do not conflict with facility uses.

6. Contractor shall coordinate with roofing manufacturer to obtain manufacturer-approved, warrantable details at locations of low flashing heights. Warranty exclusions for locations of low flashing heights will not be permitted.

7. All fasteners shall be selected and utilized to prevent galvanic corrosion. 8. Follow manufacturer and NRCA details. Edge securement shall be in accordance with

manufacturer requirements and comply with ANSI/SPRI ES-1. 9. Provide manufacturer-approved assembly letters for each system. Provide documentation

that systems meet the code-required wind uplift resistance. 10. Upon contract award, immediately register project with GAF for the Golden Pledge warranty.

Asphalt Shingle Roof Replacement

1. Remove existing shingles, felts, flashings, and roofing components down to the surface of the existing plywood roof decks. Dispose of all debris off-site.

2. Distribute stored materials so that roof deck and structure is not overloaded.

Page 16: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 June 2019

3. Inspect the existing plywood deck. Notify Owner and Engineer immediately of any areas of deteriorated, damaged, or otherwise compromised plywood deck. Replace plywood deck with new ½-inch APA-rated exterior grade plywood sheathing for roof applications. Plywood shall have 32/16 span rating and Exposure 1 durability. Use panel spacers to provide 1/8-inch space at panel ends and edges. Install plywood on level nailing surface; install blocking to straighten if required. Plywood shall be fastened with 8d (0.131 inch x 2-1/2 inch) common hot dipped galvanized or stainless steel nails at a maximum spacing of 6 inches on-center at supported panel ends and edges. At intermediate supports, fasten with nails 12 maximum inches on-center.

4. Check roof deck for acceptability for roof system installation. 5. For roof areas with slopes of 4:12 or greater, install shingle underlayment consisting of one

layer of 30 pound felt that meets requirements of ASTM D226 and ASTM D4869 with ANSI/UL 790 Class A roofing fire rating. Underlayment shall be manufactured by GAF. Basis of design: GAF Shingle Mate. For roof areas with slopes of 3:12, install shingle underlayment consisting of two layers of the specified 30 pound felt. Install underlayment over the entire roof area in accordance with the manufacturer instructions. Use different underlayment if required by manufacturer to obtain specified warranty.

6. For roof areas with slope of 2:12, install underlayment consisting of self-adhering, polymer-modified bitumen sheets complying with ASTM D1970. Underlayment shall be manufactured by GAF. Basis of design: GAF Weather Watch. Install underlayment over the entire roof area in accordance with the manufacturer instructions. Use different underlayment if required by manufacturer to obtain specified warranty.

7. Underlayment shall be covered daily and shall not be left exposed overnight. Remove and replace at no additional cost any underlayment that becomes wet, wrinkled, or otherwise damaged.

8. All felts shall be cap nailed. 9. Install ice and water shield at all hips and rake edges, eaves, ridges, valleys, dormers, and

penetrations. At eaves, the ice and water shield shall extend from the eave up the slope to a minimum of 36 inches beyond the exterior wall line. Ice and water shield shall be installed in accordance with manufacturer instructions. A minimum 36-inch wide ice and water shield shall be installed at the locations noted. At rakes, ice and water shield shall be installed over underlayment and edge metal. Basis of design: GAF Weather Watch. Install different ice and water shield if required by manufacturer to obtain warranty.

10. Install W-shaped valley metal at all valleys. Valley metal shall be 24 inches wide and installed in sections not to exceed 10-feet in length. The valley metal shall be installed shingle-style with no exposed fasteners and centered over the underlying ice and water shield.

11. Re-attach all loose gutter spikes taking care to not damage the gutters or downspouts. Clean the gutters. At ten existing gutter seam locations with reported leaks, thoroughly clean and dry gutters in vicinity of seams and apply butyl-rubber caulk. Caulk shall be UV-resistant, flexible, and water-resistant. Install caulk in accordance with manufacturer guidelines to create a watertight seal. Perform water tests on seams after caulk adequately cures.

Page 17: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 June 2019

12. Install complete asphalt shingle system, including starter strips, in accordance with the manufacturer instructions. Basis of design: GAF Timberline Natural Shadow, color Weathered Wood. Attach shingles with roofing nails; staples shall not be used. Roofing nails shall be round-headed, sharp pointed, 11-gauge (0.15-inch) galvanized steel that comply with ASTM F1667. Nails shall extend a minimum of 1/8-inch through the underside of plywood. Do not over-drive nails. Six (6) nails shall be installed per shingle.

13. Drip edge metal shall be installed in accordance with manufacturer and NRCA details. All sheet metal shall be pre-finished 24-gauge galvanized steel. Pre-finish shall consist of Kynar 500, or approved equivalent, and be manufactured or approved by GAF. Owner to select color.

14. Replace all pre-fabricated pipe boots. Lifetime Pipe Collars by GAF shall be utilized. 15. Field wrap two rooftop pipe penetrations as required by GAF. 16. Install backer and counter-flashings at all other penetrations. 17. Work with Owner’s Facilities staff for the temporary disconnect of rooftop Samsung split-

system heat pump to allow shingle installation. Re-attach heat pump support with small lag bolts or other fasteners approved by Engineer.

18. Replace all step flashings. Cut reglet into masonry for step flashing installation. Step flashings shall have vertical legs a minimum of 4 inches tall and extend a minimum 4 inches onto the roof surface.

19. Install rain collars where not present. 20. Replace all damaged wood with APA rated, Southern Yellow Pine lumber to match existing.

Price shall include 250 board feet and unit cost (per board foot) for quantities adjustment. 21. Trim fascia boards that have deteriorated because they were installed too close to the

shingles. Provide gap between wood and shingles. 22. Replace all flexible sealants. 23. Arrange for roof system manufacturer inspections at startup, throughout project, and at

completion. Make corrections as directed by manufacturer representative. 24. Provide 3-year contractor and 20-year manufacturer system materials and workmanship

warranty. Manufacturer warranty shall be based on 115 mph wind speed. 25. Additive Bid #1: replace all existing gutters and downspouts with material, size, and

configurations to match existing. Sheet metal color to be selected by Owner. 26. Additive Bid #2: install new gutters at locations identified. New gutters shall match existing

material, size, and configuration. Install seven downspouts in conjunction with the new gutters.

Low-slope Roof Replacement

1. Provide manufacturer’s assembly letter prior to starting work. 2. Remove existing membrane, flashings, and insulation down to the surface of the roof deck.

Dispose of all debris off-site. The mastic between the two existing layers of EPDM has ACM. Refer to Appendix B. Remove and dispose of all ACM in accordance with all Federal, State, local, and University requirements.

Page 18: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 June 2019

3. Inspect the roof deck. Notify the Engineer immediately if any deteriorated roof deck is encountered and replace damaged deck as directed.

4. Install ½-inch glass-faced gypsum board over roof deck. Board shall comply with ASTM C1177. Fastener spacing shall be as required to meet project wind uplift requirements. Note that base gypsum board can be omitted if vapor retarder can be installed directly to plywood. Consult manufacturer and Engineer.

5. Install fully-adhered, self-healing vapor retarder over the entire surface of the base gypsum roof board or plywood. The vapor retarder shall have a Class A fire rating. Vapor retarder shall be manufactured by GAF or Soprema.

6. Install 1-1/2-inch polyisocyanurate insulation board over the vapor retarder. Polyisocyanurate insulation shall be in accordance with ASTM C 1289, Type II, Class 1, Grade 3 (25 psi compressive strength). Insulation shall be installed in full spray application of polyurethane adhesive.

7. Install ½-inch glass-faced gypsum cover board over insulation. Board shall comply with ASTM C1177. Cover board shall be installed in full spray application of polyurethane adhesive.

8. Install 2-ply SBS modified bitumen membrane over the coverboard using heat welded application. Base sheet shall comply with ASTM D6164, Type 1, Grade S. Cap sheet shall comply with ASTM D6164, Type 1, Grade G.

9. Install new sheet metal head flashing to cover top of flashing at head of roof. Submit shop drawing for Engineer review and approval.

10. Install 2-ply SBS modified bitumen flashings and all associated accessories to provide a complete system. Compatible liquid-applied flashings shall be used to the extent possible as applicable.

11. Follow manufacturer and NRCA details. Edge securement shall be in accordance with manufacturer requirements and comply with ANSI/SPRI ES-1.

12. Arrange for roof system manufacturer inspections at startup, throughout project, and at completion. Make corrections as directed by manufacturer representative.

13. Provide 3-year contractor and 20-year roof manufacturer system materials and workmanship warranty. Manufacturer warranty shall be based on 115 mph wind speed.

Page 19: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

EMC Building 910 Roof Replacement

APPENDIX B - ASBESTOS & LEAD PAINT SURVEYS

Page 20: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

SanAir ID#: 19028346

Project #: FEA

Project Name: Equine Med Center

Report Date: 6/13/2019

Analysis Report prepared forHDH Technical, Inc.

Page 1 of 8

Page 21: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

Dear Robin Liebal,

We at SanAir would like to thank you for the work you recently submitted. The 21 sample(s) were received on Thursday, June 13, 2019 via FedEx. The final report(s) is enclosed for the following sample(s): RM-1.1, RM-1.2, LC-2.1, LC-2.2, VB-3.1, VB-3.2, RC-4.1, RC-4.2, RC-5.1, RC-5.2, RS-6.1, RS-6.2, RS-6.3, RS-6.4, FP-7.1, FP-7.2, FP-7.3, FP-7.4, FC-8.1, FC-8.2, RS-9.2, RS-9.2.

These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely,

Sandra SobrinoAsbestos & Materials Laboratory ManagerSanAir Technologies Laboratory

Final Report Includes:- Cover Letter- Analysis Pages- Disclaimers and Additional Information

Sample conditions:- 22 samples in Good condition.

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | [email protected]

FEAProject Number:P.O. Number:

Project Name: Equine Med Center

6/12/2019Collected Date:

6/13/2019 10:10:00 AMReceived Date:

6/13/2019 12:49:35 PM

19028346SanAir ID Number

FINAL REPORT

HDH Technical, Inc.Name:Address: P.O. Box 6158

Christiansburg, VA 24073

540-381-7999Phone:

Page 2 of 8

Page 22: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

Analyst: Pisula, Nicholas | Fleming, Christopher

Asbestos Bulk PLM EPA 600/R-93/116Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

RM-1.1 / 19028346-001Roof Membrane-High Flat, Membrane

BlackNon-Fibrous

Homogeneous

100% Other None Detected

RM-1.1 / 19028346-001Roof Membrane-High Flat, Mastic

BlackNon-Fibrous

Homogeneous

98% Other 2% Chrysotile

RM-1.2 / 19028346-002Roof Membrane-High Flat, Membrane

BlackNon-Fibrous

Homogeneous

100% Other None Detected

RM-1.2 / 19028346-002Roof Membrane-High Flat, Mastic

Not Analyzed

LC-2.1 / 19028346-003Louver Caulk-High Roof

BlackNon-Fibrous

Homogeneous

97% Other 3% Chrysotile

LC-2.2 / 19028346-004Louver Caulk-High Roof

Not Analyzed

VB-3.1 / 19028346-005Vapor Barrier-Low Roof

WhiteNon-Fibrous

Homogeneous

100% Other None Detected

VB-3.2 / 19028346-006Vapor Barrier-Low Roof

WhiteNon-Fibrous

Homogeneous

100% Other None Detected

RC-4.1 / 19028346-007Roof Cement

BlackNon-Fibrous

Homogeneous

100% Other None Detected

RC-4.2 / 19028346-008Roof Cement

BlackNon-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 6/13/2019 Date: 6/13/2019

Approved Signatory:

FEAProject Number:P.O. Number:

Project Name: Equine Med Center

6/12/2019Collected Date:

6/13/2019 10:10:00 AMReceived Date:

6/13/2019 12:49:35 PM

19028346SanAir ID Number

FINAL REPORT

HDH Technical, Inc.Name:Address: P.O. Box 6158

Christiansburg, VA 24073

540-381-7999Phone:

Page 3 of 8

Page 23: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

Analyst: Pisula, Nicholas | Fleming, Christopher

Asbestos Bulk PLM EPA 600/R-93/116Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

RC-5.1 / 19028346-009Roof Cement

GreyNon-Fibrous

Homogeneous

100% Other None Detected

RC-5.2 / 19028346-010Roof Cement

GreyNon-Fibrous

Homogeneous

100% Other None Detected

RS-6.1 / 19028346-011Roof Shingle

GrayNon-Fibrous

Heterogeneous

100% Other None Detected

RS-6.2 / 19028346-012Roof Shingle

GrayNon-Fibrous

Heterogeneous

100% Other None Detected

RS-6.3 / 19028346-013Roof Shingle

GrayNon-Fibrous

Heterogeneous

100% Other None Detected

RS-6.4 / 19028346-014Roof Shingle

GrayNon-Fibrous

Heterogeneous

100% Other None Detected

FP-7.1 / 19028346-015Felt Paper-Under RS-6

BlackFibrous

Homogeneous

60% Cellulose 40% Other None Detected

FP-7.2 / 19028346-016Felt Paper-Under RS-6

BlackFibrous

Homogeneous

60% Cellulose 40% Other None Detected

FP-7.3 / 19028346-017Felt Paper-Under RS-6

BlackFibrous

Homogeneous

60% Cellulose 40% Other None Detected

FP-7.4 / 19028346-018Felt Paper-Under RS-6

BlackFibrous

Homogeneous

60% Cellulose 40% Other None Detected

Analyst:

Analysis Date: 6/13/2019 Date: 6/13/2019

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | [email protected]

FEAProject Number:P.O. Number:

Project Name: Equine Med Center

6/12/2019Collected Date:

6/13/2019 10:10:00 AMReceived Date:

6/13/2019 12:49:35 PM

19028346SanAir ID Number

FINAL REPORT

HDH Technical, Inc.Name:Address: P.O. Box 6158

Christiansburg, VA 24073

540-381-7999Phone:

Page 4 of 8

Page 24: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

Analyst: Pisula, Nicholas | Fleming, Christopher

Asbestos Bulk PLM EPA 600/R-93/116Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

FC-8.1 / 19028346-019Step Flashing Caulk

GrayNon-Fibrous

Homogeneous

100% Other None Detected

FC-8.2 / 19028346-020Step Flashing Caulk

GrayNon-Fibrous

Homogeneous

100% Other None Detected

RS-9.2 / 19028346-021Roof Shingle-Porch

BlackNon-Fibrous

Homogeneous

100% Other None Detected

RS-9.2 / 19028346-022Roof Shingle-Porch

BlackNon-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 6/13/2019 Date: 6/13/2019

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | [email protected]

FEAProject Number:P.O. Number:

Project Name: Equine Med Center

6/12/2019Collected Date:

6/13/2019 10:10:00 AMReceived Date:

6/13/2019 12:49:35 PM

19028346SanAir ID Number

FINAL REPORT

HDH Technical, Inc.Name:Address: P.O. Box 6158

Christiansburg, VA 24073

540-381-7999Phone:

Page 5 of 8

Page 25: ADDENDUM #1 June 20, 2019 · PROJECT: Virginia Polytechnic Institute and State University Marion duPont Scott Equine Medical Center Building 910 Roof Replacement Project Leesburg,

Disclaimer

The final report cannot be reproduced, except in full, without written authorization from SanAir. Fibers smaller than 5 microns cannot be seen with this method due to scope limitations. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample and information provided by the client. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Samples are held for a period of 60 days. For NY state samples, method EPA 600/M4-82-020 is performed. Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing. Asbestos Certifications NVLAP lab code 200870 City of Philadelphia: ALL-460 PA Department of Environmental Protection Number: 68-05397 California License Number: 2915 Colorado License Number: AL-23143 Connecticut License Number: PH-0105 Massachusetts License Number: AA000222 Maine License Number: LB-0075 New York ELAP lab ID: 11983 Rhode Island License Number: AAL-126 Texas Department of State Health Services License Number: 300440 Commonwealth of Virginia 3333000323 Washington State License Number: C989 West Virginia License Number: LT000566 Vermont License: AL166318

Revision Date: 11/30/2017

Page 6 of 8