Add-ons paper sack machines
Add-ons Tuber - Page 2 - 11Add-ons Bottomer - Page 12 – 22Add-ons Rotaliner - Page 23
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
setup for 4 plies: 8 magnet rings, 8 sensorsupdated software/control
integrated into machine control; orseparate handling & display for older machines
More Uptime! Add-on „Easy Stop“
up to 2 minutes saving per roll changeimproved time & staff managementautomated speed down-ramping
installation time – approx. 4 days
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135Standard Standard
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Drive for speed synchronization the rollsPneumatic pressing of the accelerator rollStopping brake for exact prepositioningPivoting roller for splice pressingPneumatic separating stationAccess safety sensorsFunction “easy stop” required0,5m space per stand needed
More Uptime! Add-on „Non Stop“
extra production timesemi-automatic roll change while tuber is
running
installation time – approx. 1 week
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135
Non Stop
Faster ramp down Faster ramp up
Time saved
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
optical sensor for scanning of the print markoperator panel with membrane keyboard and LCDAC servo motordrive control in the switch cabinetring clamping couplings
Print Control System = use of Pre-printed Material
use of pre-printed material is possiblefaster changeoverprerequisite for retrofitting of slave drive printers
installation time – approx. 1 week
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135standard standard standard standardstandard
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
1. newer machines: integrated system, rolls, attachments2. older machines: perforation tower
optionalI.additional rolls, e.g. microperforation (5mm x 5mm)II.skipped perforationIII.turret system
Quicker Filling Process through Venthole Perforation
quicker fillinganti slipalternative to the use of highly porous paper
installation time – approx. 1 week
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
1. 4Q-Drive2. Ionisation-Unit3. Dispersion Glue Pump
PE-Film Processing-Set
controlled web tension of PE-Filmcapability of thin-film processinghigher productivity – easier processing
installation time – approx. 2 - 4 days
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135
1
2
3
EXTRUSION | PRINTING | CONVERTING
location
advantages
Quick Change - Central Clamping Unit
upgrade to quick change tooling, rapid mounting insteadof several screws (cross pasting and stepped end)shorter setup timesavings: About 3 minutes per ply per setup
installation time – approx. 1 day
deliveries
new platen carrier shaft and assembly
possibly new cross-pasting plates necessary
impressions
AM 2130 2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135standard standard standard standardstandard
EXTRUSION | PRINTING | CONVERTING
location
advantages
Produce Clean Sacks - Web Cleaning Unit
clean inner plynew markets (food, hygiene)
installation time – approx. 2 days
deliveriesvacuum station for 1700 mm web widthone anti-static bar each before and after the vacuum stationtwo brushes arranged between the anti-static barsdust removal unit incl. dust collection containerattachment parts
impressions
AM 2130 2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
1. rubber covered snatchers2. belt conversion kit3. new Tear Off Unit
High-Performance Tear-Off
less marks on tubes – improved sack qualityhandling of modern papers (high porous/sensitive surfaces)improved packet forming (belt system)faster changeover (belt system)
installation time
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135standard standard standard standard standard standard
1 2
1. approx. 2 days2. approx. 1 week3. approx. 1 week
3
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
adjustable cross perforation unitknife barssensor-guided adjustment during operation
Use the Advantages of Flush-Cut & Tracking per PCS
less web breaks – less downtimesless waste & faster changeoverless costs for toolingprint related quality improvements through PCS
installation time – approx. 4 days
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135
EXTRUSION | PRINTING | CONVERTING
deliveries
advantages
separate drives for shingling conveyortransfer and packeting conveyorsintegrated control cabinet
Ready for Automation - Packet Forming Station
better packets ready for automationimproved quality for feeding of bottomer
increased production speedless waste
installation time – approx. 2 days up to 1 week
AM 2130
impressions
2140 2145 2150 2155 2160 2170 2180 AM 8105 8115 8125 8135standard standard standard standard standard
location
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Bottom Patch Unit
improved sack filling processadditional space for marketing issuesadditional features available e.g.
Easy Openingsealed valves
installation time – approx. 2 weeks
impressions
unwind stands including web guidingpaste applicators & monitoringexpansion clamp paster carriersautomatic lift-off of paster carriers when a sack is missingmounting assembly
carrying handlepatch wrap around
AD 2360 2366 2368 2377 2378 2379 2390 AD 8300 8310 8320 8330
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Easy Opening incl. Carrying Handle Unit
additional feature for customerUnique Selling Point for Do-It-Yourself markets
installation time – approx. 1 day per Unit
impressions
AD 8300
driven knife shaft with segmental knivesunwind stands PE-string
8310 8320 8330AD 2360 2366 2368 2377 2378 2379 2390
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Print Control System for Bottom Patch Unit
automatic registering of bottom patch printfaster changeover, by use of pre-printed rollsless waste during run-up
impressions
AD 8300
sensor for print mark scanningservo motor and differential driveDrive control, frequency inverter and software packageInput and display of operating information
installation time – approx. 3 days per Unit
8310 8320 8330AD 2360 2366 2368 2377 2378 2379 2390standard standardstandard
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Bottom Patch Printers
flexibility in production, no pre-printadditional space for marketing issuessafety information
installation time – approx. 3 days per UnitAD 2360
impressions
2366 2368 2377 2378 2379 AD 8300
printing unitsanilox transfer rolleralignment of the print to the cutautomatic plate cylinder lift-off at machine stop
8310 8320 8330
Flexo Miniflex
2390
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Wash-Up System for Bottom Patch Printer Miniflex
semi-automatic cleaning of the color decksfaster changeoverwash up time: 3 minutes
installation time – approx. 1 day
impressions
AD 8300 8310 8320
fresh and waste water tankconnecting lines, valves, waste water tank between tanks
and doctor chamberssoftware for wash-up program
8330standard standard
AD 2360 2366 2368 2377 2378 2379 2390
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
diagonal creasing station with elastic counter elements
improved geometryimproved sack quality
no damage to paperwaste reduction
faster changeover
installation time – approx. 2 days
impressions
AD 8300
creasing elementselastic counter elements
8310 8320 8330AD 2360 2366 2368 2377 2378 2379 2390standard standard standard standardstandard
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Improved Seam Pasting for Preformed Tubular Valves
uniform glue applicationinterruption of glue bead on the cut edgehigh speeds even with difficult to handle
materials and products
installation time – approx. 2 days
impressions
AD 8300 8310 8320 8330
stand alone application unit
AD 2360 2366 2368 2377 2378 2379 2390
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
New Valve Design: Mirror-inverted Tubular Valves
easier opening when filling sacksimproved sack integritydifferent product designs available
installation time – approx. 2 days
impressions
AD 8300 8310 8320 8330
mirror-inverted closing
AD 2360 2366 2368 2377 2378 2379 2390
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
PE-Film Perforating Tools: avoid blocking!
prerequisite for sealed valvesno blocking of preformed tubular valves
installation time – approx. 1 day
impressions
AD 8300
special knive arrangementgrooved rollerprerequisite: drive for thumb notch cutter
8310 8320 8330AD 2360 2366 2368 2377 2378 2379 2390
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
Bottom Width Checking Unit
scan of the bottom width for dimensionalquality checkdetecting of bottom patch wrap-around
installation time – approx. 2 days
AD 8300
pair of opto-electronic sensors on both sides
8310 8320 8330AD 2360 2366 2368 2377 2378 2379 2390
impressions
EXTRUSION | PRINTING | CONVERTING
location
deliveries
advantages
State of the art pressing: 2 Drum delivery & accumulator
improved integrity and sift proofness with less glueintense, continuous adjustable pressingmore sacks per pallet, increased storage capacityprerequisite for automation/palletizing
installation time – approx. 1 week
impressions
AD 8300
belt sections with two deviating drumsmotorized transverse adjustment of the drive sidepneumatically adjustable pressing rollerselectronic counter, adjustable up to 25 sacks / packetshingle interrupter, switch cabinet and AC drive
8310 8320 8330standard standard standard standardstandard
AD 2360 2366 2368 2377 2378 2379 2390standard
EXTRUSION | PRINTING | CONVERTING
Rotaliner Add-Ons
available upgrades
• Servo drive for cross-perforation• Driven auxilliary draw• Servo drive for vacuum belts at the Z-fold• Sealing bar monitoring
advantages
REDUCED MAINTENANCE & IMPROVED ROTALINER PERFORMANCE• reduced maintenance, synchronization settings, reduced wear & tear, reduced waste,
avoidance of contamination from the chain driveHIGHER & MORE CONSISTANT QUALITY OF FINAL PRODUCT• through monitoring of the sealing bars• more precise positions of the seals, perforations and Z-fold
reduced waste