achieving lean workflow by improved layout of the laboratory · efficient workflow key objectives...

26
Type Argent Global Services Lean Training Series Achieving Lean Workflow By Improved Layout of the Laboratory Lab Quality Confab Atlanta, Georgia September 30, 2009 Type Realistic Solutions For Success Argent Global Services Confidential & Proprietary Material 2 Steve Stone, Managing Director Argent is a process-engineering and management consulting firm that has established, improved and re-engineered a variety of business operations since 1988. With 17-years experience, Argent pioneered many engineering services for the health care diagnostics industry. Skill Set & Methodology include: Industrial Engineering Lean Enterprise Six Sigma Management Tools & Software Implementation Support Performance Measurement Argent Global Services

Upload: others

Post on 05-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f Argent Global Services Lean Training Series

Achieving Lean Workflow By Improved Layout of the Laboratory

Lab Quality Confab Atlanta, Georgia September 30, 2009

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

2

Steve Stone, Managing Director

Argent is a process-engineering and management consulting firm that has established, improved and re-engineered a variety of business operations since 1988.

With 17-years experience, Argent pioneered many engineering services for the health care diagnostics industry.

Skill Set & Methodology include:Industrial EngineeringLean EnterpriseSix SigmaManagement Tools & SoftwareImplementation SupportPerformance Measurement

Argent Global Services

Page 2: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

3

What We Will Learn Insight on how a laboratory layout can impact efficient workflow

Key ObjectivesUnderstand how Lean experts view the laboratory and how to see layout opportunities

Discuss how the layout can affect workflow decisions

How an efficient layout is a key part of a continuous flow

Goals & Objectives

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

4

Argent is not an Architectural firm.

We are an Industrial Engineering company.

Focus is people and workflow.

Concerned with efficient flow.

We have worked in laboratories for 17 + years.

(When necessary) Argent layout plans are delivered to Facility Engineers and Architects for final development.

The Qualifier

Page 3: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

5

Intro & Overview

Layout Tools

Layout Objectives

Lean Features

Layout Examples

Conclusions

AgendaAchieving Lean Workflow By Improved

Layout of the Laboratory

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

6

Many people will not be concerned with their layout until they are…

Purchasing/adding new equipmentNew testingMoving Running out of room

There are such great opportunities for efficiency gains, that even sound laboratories should review and update their layouts.

Why Be Concerned?

Page 4: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

7

In a Nutshell…A properly designed layout can have the greatest impact on laboratory efficiency and processes.

Special care should be taken to ensure that theLaboratory layout facilitates the processing of specimens

Enhances communication

Does not hinder the workflow or add excess travel.

Layout

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

8

An improved layout can accomplish…Reduction in travel

Reduced turnaround times

Improved visibility of work and activities

Improved communication

Improved utilization of space

Greater utilization of staff

Continuous flow of specimens

Key Benefits

Page 5: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

9

Layout improvements do not always require a complete redesign.

Small changes can make a difference

Another Qualifier

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

10

How Do We Start?Layout ToolsThere are several tools that will enable management to make educated decisions concerning layout and placement of equipment.

Information Driven Results

Layout Tools

Page 6: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

11

5S: Workplace Standardization & Organization

Used to create organized, clean and functional work areas

5S System

Used to control supplies and materials.

Create efficient workstations

Facilitates standardization.

Reduces unused items.

1. SORT 2. SET IN ORDER

3. SHINE

4. STANDARDIZE

5. SUSTAIN

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

12

OutcomesBest place to start for most projects.

Clean baseline to work with.

Starting with an organized and standardized area will lead to better decision making.

Don’t want to move unused items.

Don’t want to plan for unneeded fixtures.

5S System

Page 7: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

13

Flowchart / VSM

Need to see the processes…Start by mapping the process so that all of the steps required for testing activities are revealed and documented. Focus on all common tests and protocols. Do not overlook ancillary activities such as retrieving supplies, retrieving reagents, maintenance, cleaning and archiving.Use which ever mapping technique you are comfortable with.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

14

Value Stream Map

Web team Mtg DocumentAssignment Research Document

Creation Proofing Web Editing WebDevelopment Staging Webmaster

Posting

AssignmentTracking

Author Tracking

Reasignment ofEdits Edits Tracking

Interactive MktgReview

C/T = 32s C/T = 104s C/T = 3.33h

NVA

NVA

C/T= 1.25h

C/T = 104s NVA

C/T = 16.5m C/T = 13m C/T = 12.75m C/T = 17s C/T = 11s

C/T = 19m

Customer Service(ERC)

Document Control Desk

All documentationto support request

Customer requestemailed to ERC

Customer requesthand-delivered to

ERC

Customer requestfaxed to ERC

Sends list of itemsaccepted for production

Daily Scheduleof "Hot Docs"

Email notification to Document Control& Interactive Mktg. Web Editor

Internet

Customer notifies that no support documentexists for problem , phone or fax

To Interactive Mktg.Review

DCC Report &Review

NVA

Tracking DataTagging

NVA

Q61

Q114

Q79

Q7

Q24

Q11

Q29

Q53

Q27

Q62

147.3 daysPLT

5.65 hoursTCT

35.6d 24.7d 19.1d 2.2d 7.5d 3.4d 9.1d 37.3d 8.4d

7 1 2 1 0 1 1 0

4

10

0

2

00

0.009h 0.03h 3.33h 1.25h 0.28h 0.22h 0.21h 0.32h 0.003h

Page 8: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

15

Need to sketch the current layout.

AutoCAD or drawing software are not required.

Just grab a pad, pencil and a tape measure (maybe a ruler).

Most everything in the lab is square, so it’s not that difficult to sketch.

Hint: use ceiling or floor tiles to measure room dimensions.

Sketch Pad

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

16

Spaghetti DiagramsCreate spaghetti diagrams to capture the true impact of the current layout and travel.

Utilize both the process maps and sketches.

Follow lab personnel and draw a continuous line everywhere they travel to complete a task.

Or, follow a specimen through the entire testing process.

Page 9: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

17

Spaghetti Diagrams

SlideSortArea

Stainer

ManualStaining

Cover-slipper

ManualCover-slippingOven

Embed-ding

To ArchivingTo Pathologist

AdminArea

ArchiveOven

Cutting &Mounting

Routine Histology Staining, Low Volume

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

18

OutcomesEye-catching graphic of what is happening in your lab.

Identify non-value added travel.

The goal is to reduce the number of lines on the diagram.

Relocate items that will reduce repetitive travel.

Spaghetti Diagrams

Page 10: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

19

Direct MeasurementUtilize direct measurement to determine the impact of travel and motion, both of which are typically non-value added.

Use time studies to capture excessive travel and waiting.

The number of feet traveled or number of flow chart steps can also be used.

Use the measurements as a benchmark for potential process improvements and layout changes.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

20

Product MatrixA tool used in manufacturing to set up tools and materials for work cells and product lines. The object is to identify what key items are shared by each product line. In the lab, the product lines are the tests or protocols that are performed. List the tests by frequency or volume and then use the matrix to ensure that key items are placed properly to support testing.

Page 11: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

21

Product MatrixSample Product Matrix

Tests Equipment Test A Test B Test C Test D Workbench A X X

Workbench B X X

LIS Station X X X X

Centrifuge X X X

Vortex X

Pipette Station X X X

Hood X X

Refrigerator 1 X X

Refrigerator 2 X

Freezer X

Instrument A X X

Instrument B X

Instrument C X

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

22

OutcomesDevelop a clear picture of what is needed for testing.

Identifies equipment that is shared and most used.

Facilitate placement of equipment for higher-volume testing.

The ultimate goal to reduce travel distance and congestion.

Product Matrix

Page 12: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

23

Frequency MatrixSimilar to the product matrix, populate the matrix with the actual number of times each item is visited.Utilize the spaghetti diagram to determine the frequency in which each item is used.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

24

Frequency MatrixSample Frequency Matrix

Tests Equipment Test A Test B Test C Test D Workbench A 3 2

Workbench B 2 4

LIS Station 1 1 1 1

Centrifuge 1 1 1

Vortex 2

Pipette Station 1 1 2

Hood 2 1

Refrigerator 1 2 1

Refrigerator 2 2

Freezer 1

Instrument A 1 1

Instrument B 1

Instrument C 1

Page 13: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

25

OutcomesThe higher the number, the greater the opportunity to either streamline the process or provide layout placement to reduce travel.High numbers could mean non-value added elements in the process. Congestion is also an issue; for example, if there is one LIS station that is always in use, an alternate station may be an option.

Frequency Matrix

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

26

Layout features that will help achieve the goal of a Lean laboratory.

Layout Objectives

Page 14: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

27

Layout ObjectivesLaboratory floor plans should always be open and with good visibility.

Reduce barriers to movement as well as any barriers that could interfere with line-of-site.

Workbenches and equipment should be movable or on casters.

The ability to move laboratory components is critical for efficient layout changes or for changes in volumes or testing.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

28

Layout ObjectivesToo many benches and countertops can be inefficient.

Workbenches can create barriers and generally collect clutter. Keep benches to a minimum and keep them clean and organized.

Substitute carts for benches whenever possible; they are smaller and more flexible.

Maintain uni-directional flow and avoid backtracking.

Avoid bottlenecks, dead-ends and inaccessible areas.

Page 15: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

29

Layout ObjectivesDon’t use the entire room for testing if it is not needed.

Create efficient work cells that use less space. Use excess space for administrative purposes, storage or future testing needs.

Cabinets and shelving should be open with no doors. Open cabinets are easier to maintain and organize. Moreover, visibility of supplies and tools will lead to efficiencies.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

30

Layout ObjectivesIncorporate POUS (Point of Use Storage) throughout the laboratory.

Stock a reasonable amount of consumables at the point of use (no more than a few days). The goal is to reduce travel and delays without creating multiple locations with excessive inventory. Primary inventory locations should still be centralized.

Use under-counter refrigerators and freezers to store reagents and supplies. This will reduce travel to the larger centralized units. Maintain these points as POUS.

Page 16: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

31

Layout ObjectivesCreate work cells to improve workflow, visibility, staffing resources and space requirements.

Work Cells are fashioned in a way that allows operators to see and move quickly between stations.

Work Cells reduce travel and motion while providing flexibility to process low to high volumes.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

32

Layout Improvements can facilitate and even rely on Lean features

Lean Features

Work cellsContinuous flow Batch size reductionBalanced Work Kanban SignalsPoint of Use Storage (POUS)Flexible labor

Page 17: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

33

The goal of Lean is Waste Reduction in order to achieve Continuous Flow

Lean

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

34

Lean Tools

Lean Tools for Identifying & Reducing Waste

Pull Systems

Setup Reduction

Teams

Visual Controls

POUSStandardized Work

Quality at the Source

Work Cells Performance MeasurementTPM

Continuous Flow Batch Size Reduction

Lean

Too

ls

LayoutValue Stream Mapping 5S System

Page 18: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

35

Work Cells are created when workstations that process similar or same type work are brought together and arranged in an open-plan configuration.

The configuration is fashioned in a way that allows operators to see and move quickly between stations.

Work Cells reduce travel and motion while providing flexibility to process low to high volumes.

Work Cells

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

36

Histology Work CellMicrotomySpecial StainingQuality Inspection and Case Collation

Work Cells

Page 19: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

37

The process of addressing work as soon as possible in single piece or small batches.Do not allow work to wait in large batches or queues. Why?

Reduces large batches and queuesEliminates double handling of specimens, materials, etcMaintains the quality focus on the “current” itemReduces the amount of In-Process workFacilitates FIFO

Continuous Flow

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

38

Single Piece Flow is a goal of LeanThe real key is..

Optimal Batch SizeSets attainable and realistic batch sizes for the environment. Based upon:

• Arrival patterns• Instrument cycle times• Instrument capacity• Rack and container sizes • Staffing & Schedules

Batch Size Reduction

Page 20: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

39

Batch Size ReductionBatch & Queue ProcessingBatch & Queue Processing

STEP 1 – 1 MIN / TUBE STEP 2 – 1 MIN / TUBE STEP 3 – 1 MIN / TUBE

Process Lead Time = 30+ minutes for all ten tubesFirst test out = 21+ minutes

Continuous Flow Processing (OneContinuous Flow Processing (One--Piece Flow)Piece Flow)

STEP 1 – 1 MIN / TUBESTEP 2 – 1 MIN / TUBE

STEP 3 – 1 MIN / TUBE

PLT = 12 minutes for all ten tubesFirst test out = 3 minutes

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

40

To manage batches and queues, process stations (steps) will need to be balanced

Balanced work requires the process steps to be in pace and harmony

How is this accomplished?Shift the work elements

Utilize multiple work stations

Use your direct measurement to understand time requirements (aka Takt Time)

Balanced Work

Page 21: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

41

KanBan SignalsKanBan Signals are utilized to control batch and queue sizes.

A KanBan can be anythingA full rack

A full tub

Taped-off area on the bench

A card system

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

42

POUS

Storing supplies in an organized fashion at the work location.

Right-levels and visual identification is important.

Point of Use Storage

Page 22: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

43

Take advantage of an efficient layout to flex staff.

Flexible Labor

Select staff can float and move to different areas throughout the day to respond to higher work demand.Use multi-skilled employees to create flexible schedules and shifts that match up with demand.

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

44

A few layout examples to support our lessons.

Layout Examples

Page 23: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

45

Workflow Example

SlideSortArea

Stainer

ManualStaining

Cover-slipper

ManualCover-slippingOven

Embed-ding

To ArchivingTo Pathologist

AdminArea

ArchiveOven

Cutting &Mounting

Routine Histology Staining, Low Volume

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

46

Improved Workflow

Slide Sort Area

Oven

Embed-ding

To ArchivingTo Pathologist

AdminArea

Cutting &Mounting

Stainer

ManualStaining

ArchiveOven

Cover-slipper

ManualCover-slipping

Routine Histology Staining, Low Volume

Page 24: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

47

Improved Workflow

Manual

Staining

Manual

Cover-

slipping

Routine Histology Staining, Medium Volume

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

48

Routine Histology

Work is easier for HistoTechs

Less travel

Better visibility of equipment and workstations

Promotes continuous flow

Example Benefits

Page 25: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

49

Combine the…

With your own experience and common sense

To create a model for an efficient layout that meets your needs

What does all of this mean?

Layout Tools

Layout Objectives

Lean FeaturesInformation from

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

50

Project ExamplesRelocate supplies

Reduce work benches or fixed counters

Relocate a component, instrument or work cell

Create a work cell

Redesign a room (no construction)

Create an open laboratory (construction required)Work closely with your facility staff or a third-party

What Can You Do?

Page 26: Achieving Lean Workflow By Improved Layout of the Laboratory · efficient workflow Key Objectives Understand how Lean experts view the laboratory and how to see layout opportunities

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

51

The greatest attribute of Lean is the idea that you should try new ideas very quickly.

Just Go Do It!

Final Advice

Type

f

Realistic Solutions For SuccessArgent Global ServicesConfidential & Proprietary Material

52

Q&AThank you

Stephen StoneManaging DirectorArgent Global Services12101 N MeridianOklahoma City, OK 73120405-848-1624

Closing