Achievement and Progress Report on

Various Component of Works Implemented

under

Agriculture Department, Serchhip District

During 2009 – 2010

District Agriculture Office

Serchhip District : Serchhip

1. WEATHER CONDITION Name of District : Serchhip

Sl. No. Month

2008 2009 Remarks

(+/-)

(Rainfall in

mm)

2009 2010 Remarks

(+/-)

(Rainfall in

mm)

(Rainfall in

mm)

(Rainfall in

mm)

(Rainfall in

mm)

(Rainfall in

mm)

1 January 54 Nil 54 Nil Nil Nil2 February 7 Nil 7 Nil Nil Nil3 March 34 22.02 -11.98 22.02 77.2 55.184 April 16 66.04 50.04 66.04 100.6 34.565 May 193 146.08 -46.92 146.08 366.1 220.026 June 237 258 21 258 445 1877 July 339 161.8 -177.2 161.8 337.4 175.68 August 451 420.4 -30.6 420.4 344 -76.49 September 418 120.4 -297.6 120.4 443 322.6

10 October 129 26.6 -102.4 26.6 Nil -26.611 November 43 34.2 -8.8 34.2 Nil -34.212 December NIL Nil Nil Nil Nil Nil

TOTAL :- 1921.4 1255.54 -665.86 1255.54 2113.3 857.76

Sl.

No.Name of Crops

2009-2010 2010-2011 (Estimate)

Area in Ha.Production in

MTArea in Ha.

Production in

MT

1 PADDY

1) Jhum 4352 3453.4 4152 8673

2) WRC (a) Kharif 1535 1136.4 1635 3677

TOTAL OF WRC 5887 4589.8

GRAND TOTAL OF PADDY 11774 9179.6 5787 123502 MAIZE (a) Kharif 1445 1122.9 1600 5300

(b) Rabi

Total of (a+b)

1) Sweet Corn

2) Baby Corn

Total of Maize

3 WHEAT

4 TOPIOCA (Kharif)

2. CROP SITUATIONName of District : Serchhip

5PULSES

Area in Ha.Production in

MTArea in Ha.

Production

in MT

1) Rice Bean Kharif 81 67 110 98

2) ARHAR (a) Kharif 66 50 90 81

3) FIELD PEA (a) Rabi 49 38 75 67

4) COW PEA (a) Kharif 133 108 165 147

(b) Rabi

TOTAL OF (a + b) 329 263 440 393

5) French Bean (Pulses ) Rabi 47 289 80 55

TOTAL OF KHARIF 280 225 365 326

TOTAL OF RABI 96 327 155 1226 OILSEED

1) Soyabean (Kharif) 210 352 240 480

2) Sesamum (Kharif) 30 8.9 65 26

3) Rape & Mustrad (Rabi) 23 14.5 50 34

TOTAL OF KHARIF 240 360.9 305 506

TOTAL OF RABI 23 14.5 50 347 COTTON

8 TOBACO

9 SUGARCANE ( A Kurtai-in) 305 3889 370 481010 POTATO 5 70 20 150

Name of District : Serchhip

3. PHYSICAL AND FINANCIAL PROGRESS REPORT OF NWDPRA

DURING 2009-2010, SERCHHIP DISTRICT

A. ADMINISTRATION

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

District Hqr. Level

1) Honoraium of Project Functioneries

@ Rs.3500/- per month

5 2.100 5 2.100 NIL

2) Other Expenses LS 1.782 LS 1.381 0.40

3) Transportation Charge LS 0.270 LS 0.270 NIL

PIA Level

1) Honorarium of 5 WDT @ Rs.5000/-

per month

5 3.000 5 3.000 NIL

2) Honorarium of 1 WDT @ Rs.6000/-

per month

1 0.720 1 0.720 NIL

Watershed Committee level

1) Honorarium of Watershed Secretray

19 nos @Rs.1000/- per month

19 2.280 19 2.280 NIL

2) Honorarium for 19 nos of Project

Volunteer @ Rs.600/ per month

19 1.368 19 1.368 NIL

3) Other Expenses @ Rs.10000/- per

Watershed for 19 nos.

19 1.900 19 1.900 NIL

₨ In lakhsMANAGEMENT COMPONENT :

B. MONITORING :

PHYSICAL AND FINANCIAL PROGRESS REPORT OF NWDPRA

DURING 2009-2010, SERCHHIP DISTRICT

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

District Hqr. Level

1) Field Inspection and Monitoring LS 0.300 LS 0.300 NIL

2) Conveyance/ operational expenses

of WDT

LS 0.140 LS 0.140 NIL

PIA Level

1) Field Inspection and Monitoring LS 0.800 LS 0.800 NIL

2) Conveyance and other expenses for

WDT and Project volunteer

LS 0.200 LS 0.200

₨ In lakhsMANAGEMENT COMPONENT :

C. TRAINING :

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

District Hqr. Level 1) Training of PIA, WDT &

Watershed Chairman &

Secretary for three (3) times

3 0.600 2 0.400 0.20

2) Publicity and Advertisement LS 0.250 LS 0.250 NIL3) Awareness Campaign for 19

nos @ Rs.3422/-19 0.650 19 0.650 NIL

PIA Level

1) Training of Use Group, SHG @

Rs.12000/- for

19 watershed

19 2.280 NIL NIL 2.28

PHYSICAL AND FINANCIAL PROGRESS REPORT OF NWDPRA

DURING 2009-2010, SERCHHIP DISTRICT

₨ In lakhsMANAGEMENT COMPONENT :

WORKS COMPONENTS

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

Crop Production 47.50 Ha. 5.700 47.50 Ha. 5.700 NIL

WRC Development 238.125 Ha. 28.575 238.125 Ha. 28.575 NIL

Terrace Development 113.367 Ha. 13.604 113.367 Ha. 13.604 NIL

Horticulture Development 264.825 Ha. 31.779 264.825 Ha. 31.779 NIL

WHS 53 Nos. 13.250 53 Nos. 13.250 NIL

Farm Pond 5 Nos. 1.200 5 Nos. 1.200 NIL

Forestry 2.200 Ha. 0.264 2.200 Ha. 0.264 NIL

Kutcha Irrigation 2.975 Ha. 0.357 2.975 Ha. 0.357 NIL

Production System & Micro

Enterprise

a) Crop Production 31.925 Ha. 3.831 31.925 Ha. 3.831 NIL

b) Micro Irrigation LS 10.599 LS 10.599 NIL

c) Small Vermiculture Unit 63 Nos. 9.450 63 Nos. 9.450 NIL

Livelihood Activities 38 nos 15.070 38 nos 15.070 NIL

TOTAL :- 133.679 133.679 NIL

PHYSICAL AND FINANCIAL PROGRESS REPORT OF NWDPRA

DURING 2009-2010, SERCHHIP DISTRICT

₨ In lakhs

T.Liansanga,Darnam NWDPRA,2.00Ha

Lalfakzuala,Khawbel,NWDPRA Rs45000/ Lallawmsanga,ChhingchhipNWDPR Rs23425

WRC

PC Ruata,Khawbel,Upper Tuikual Rs45000

Lalramsanga,Middle Tuikual,Thentlang NWDPRA

K.Lalramtiana,DarnamNWDPRA,Bungtlang 8

bighas

Remsiama,Tuisen NWDPRA,Rs10364,Chhingchhip

Terrace

SUGARCANE

Huazika,Thenzawl,Oil Palm Rs 15000/

Lalherliana,Darnam,Oil palm,Oil Palm,Keitum ,2009-2010

Oil Palm

LAKHUIHTHEI

R.Vanlalvuana,Tuichang NWDPRA,Khawlailung

Varhva lui NWDPRA,N.Vanlaiphai

HORTI

BALHLA

HMUNPHIAH

WHS

R.Rozama,NWDPRA Tuisen,chhingchhip,Rs10366

K.Kapthuama,Baktawng TuiphuNWDPRA,Farm PondJR LalhmangaihaTuikum NWDPRA,Rs 14250

DAM

Zalreng NWDPRA,Chhiahtlang

Tuikual 2NWDPRA,Lungchhuan

Tuikawng

VERMICULTURE

Self Help Group,Thenzawl ,Rs 7000,

Self Help Group,Tuikum NWDPRA

2009-2010

Self Help Grp 2,Baktawng Tuiphu NWDPRA Lalrotluangi,Thentlang NWDPRA SHG-4

SHG

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

Dist Hq level:

1)Other charges LS 0.51 LS 0.38 0.13

PIA level:

Honorarium of 5WDT @

Rs.4300.00 5 2.58 5 2.58 NIL

c) Watershed Committee

Level

1) O.E LS 0.80 LS 0.80 NIL

4. PHYSICAL AND FINANCIAL PROGRESS REPORT OF WDPSCA

DURING 2009-2010, SERCHHIP DISTRICT

A. ADMINISTRATIION : ₨ In lakhs

MANAGEMENT COMPONENT :

B. MONITORING AND EVALUATION:

PHYSICAL AND FINANCIAL PROGRESS REPORT OF WDPSCA

DURING 2009-2010, SERCHHIP DISTRICT

ItemsTarget Achievement Balanc

e (₨)Phy Fin Phy Fin

Dist Hq level:

1) Field inspection and monitoring

of 8watershed@5000 per

watershed LS 0.40 LS 0.27 0.132) Conveyance and other

operational

expenditure for WDT & Projec

volunteers LS 0.10 LS 0.10 NIL

PIA level:1) Field inspection and monitoring

of works for 8 watershed

@Rs.10000 8 0.80 8 0.80 NIL

MANAGEMENT COMPONENT :

C. TRAINING :

PHYSICAL AND FINANCIAL PROGRESS REPORT OF WDPSCA

DURING 2009-2010, SERCHHIP DISTRICT

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

a) Dist Hq level:1)Training of Watershed Chairman

Secy, WDT etc for Rs 10000 each

2

0.20

2

0.10 0.10

b) PIA level:

1) Training of UG @ Rs.4375.0 8 0.35 8 NIL 0.35

2) Training of SHG @Rs.9375.00 8 0.75 8 NIL 0.75

₨ In lakhs

MANAGEMENT COMPONENT :

WORKS :

PHYSICAL AND FINANCIAL PROGRESS REPORT OF WDPSCA

DURING 2009-2010, SERCHHIP DISTRICT

ItemsTarget Achievement Balance

(₨)Phy Fin Phy Fin

1)Watershed Dev Works

a) WRC Dev. 53.62 Ha. 5.36 53.62 Ha. 5.36 NIL

b) Terrace 36.15 Ha. 3.62 36.15 Ha. 3.62 NIL

c) WHS 36 Nos 9.00 36 Nos 9.00 NIL

d) Tuikawng 34.1 Ha. 3.41 34.1 Ha. 3.41 NIL

e) Horti 188.63 Ha. 18.86 188.63 Ha. 18.86 NIL

TOTAL :- 40.25 40.25 NIL

COMMUNITY ORGANISATION

1) Corpus Fund @ Rs.48625.00 8 nos 3.89 8 nos 3.89 NIL

REHABILITATION

1)Rehabilitation Component 16 nos. 10.33 16 nos. 10.33 NIL

₨ In lakhs

HTLalmawia.WDPSCA Upper Mat

Chuhveli WRC,Upper Mat,Chhingchhip

Upper Lungva,Mualcheng

5. PHYSICAL AND FINANCIAL ACHIEVEMENT FOR ATMA,

SERCHHIP DISTRICT FOR 2010-2011

Sl.

No.Items Unit cost

FinancialTotalSerchhip

block

Lungdar

blockKVK District

B-2 TRAINING OF FARMERS

a)Inter state

Agriculture -ICAR Shilong 0.50 0.5 - - - 0.5

b)Within state

Horticulture 0.27 0.27 0.27 - - 0.54

c)Within district

i)Agri. (SRI) 0.16 - 0.16 - - 0.16

ii)Hort. (MIFCO) - 0.16 - - - 0.16

iii)Vety. (Thenzawl) - 0.16 - - - 0.16

iv)Soil. (KVK) - - 0.16 - - 0.16

v) Seri. (Thenzawl) - 0.16 - - - 0.16

₨ In lakhs

Sl. No. Items Unit cost

FinancialTotalSerchhip

block

Lungdar

blockKVK District

B-3 ORGANIZING DEMONSTRATION

a)Agriculture

i)Oil Palm 0.04 0.08 - - - 0.08

ii)SRI - 0.32 0.24 - - 0.56

b)Horticulture

i)Aloe vera - 0.24 - - - 0.24

ii)Orange - - 0.12 - - 0.12

c)Farmer to farmer

i)Agriculture 0.02 0.065 0.03 - - 0.095

ii)Horticulture - 0.045 0.015 - - 0.06

PHYSICAL AND FINANCIAL ACHIEVEMENT FOR ATMA,

SERCHHIP DISTRICT FOR 2010-2011

₨ In lakhs

Sl.

No.Items

Unit

cost

Financial

TotalSerchhi

p block

Lungd

ar

block

KVK District

B-4 EXPOSURE VISIT

a)Inter state - - - - -

b)Within state

i) Agri.- Florist Association 0.75 - - - 0.75 0.75

c)Within district

i) Agriculture 0.25 - 0.25 - - 0.25

ii) Vety Dept. - 0.25 - - - 0.25

B-5 MOBILIZATION OF FARMERS

GROUP

a)Capacity building

i)Agriculture 0.05 0.05 - - - 0.05

ii)Vety. 0.05 0.05 - - - 0.05

b)Seed money /revolving fund

i)Agriculture 0.10 0.20 - - - 0.20

ii)Vety. - 0.10 - - - 0.10

PHYSICAL AND FINANCIAL ACHIEVEMENT FOR ATMA,

SERCHHIP DISTRICT FOR 2010-2011₨ In lakhs

Sl.

No.Items

Unit

cost

Financial

TotalSerchhi

p block

Lungd

ar

block

KVK District

II FARM INFORMATION

B-9 INFORMATION DISSEMINATION THROUGH

PRINTED LEAFLETS, LOCAL ADVERTISEMENT

a)Agriculture 0.40 0.08 0.10 - - 0.18

b)Horticulture - 0.08 0.10 - - 0.18

c)Vety. - 0.08 0.10 - - 0.18

d)Soil - 0.08 0.10 - - 0.18

e)Seri. - 0.08 - - - 0.08

B-

11

FARMER SCIENTISTS INTERACTION

AT DISTRICT LEVEL

a)Agriculture 0.20 - - - 0.6 0.6

B-

12

ORGANIZATION OF FIELD DAYS

a)Agriculture 0.15 0.15 0.15 - - 0.3

b)Horticulture 0.15 - - - 0.15

c)Vety. 0.15 - - 0.15

d)Soil 0.15 - - - 0.15

e)Seri. 0.15 - - - 0.15

PHYSICAL AND FINANCIAL ACHIEVEMENT FOR ATMA,

SERCHHIP DISTRICT FOR 2010-2011₨ In lakhs

PHYSICAL AND FINANCIAL ACHIEVEMENT FOR ATMA,

SERCHHIP DISTRICT FOR 2010-2011

Sl. No. ItemsUnit

cost

Financial

TotalSerchhip

block

Lungdar

blockKVK District

B-13 ASSESMENT,REQUMNT.,VALIDATION OF

FRUIT LIKE TECHNOLOGY AT KVK- - 1 - 1

B-14 ESTABLISHMENT OF ATMA LIKE

INSTITUTION

i)TA/DA and other operational

expenditure

a)District - - - 0.2 0.2

b)Agriculture 0.07 0.05 - - 0.12

c)Horticulture 0.07 0.05 - - 0.12

d)Vety. 0.07 0.05 - - 0.12

e)Soil 0.07 0.05 - - 0.12

f)Seri. 0.07 - - - 0.07

g)Hiring charge of vehicle, - - - 0.75 0.75

ii)Operational expenses exclusively

for block

a)Agriculture 0.06 0.05 - - 0.11

b)Horticulture 0.06 0.05 - - 0.11

c)Vety. 0.06 0.05 - - 0.11

d)Soil 0.06 0.05 - - 0.11

e)Seri. 0.06 - - - 0.06

₨ In lakhs

Sl.

No.Items Unit cost

FinancialTotalSerchhip

block

Lungdar

blockKVK District

B-15ESTABLISHMENT OF BLOCK LEVEL

FARMER ADVISOYR CENTERS

(FIAS)- PROVODING IT APPLICATION 0.4 - - 0.4 0.8B-16FARMER FIELD SCHOOL

a)Vety. 0.51 0.51 - - - 0.51

b)KVK - - 1.02 - 1.02

D INNOVATIVE ACTIVITIES

D-1 DIST. LEVEL ACTIVITIES

a)Dist. Level Training Institute 2.5 - - - 2.5

D-2 OTHER INNOVATIVE ACTIVITIES

1.00 - - 1 - 1

G. TOTAL 7.71 2.35 3.02 2.70 15.78

PHYSICAL AND FINANCIAL ACHIEVEMENT FOR ATMA,

SERCHHIP DISTRICT FOR 2010-2011

₨ In lakhs

6. PHYSICAL AND FINANCIAL ACHIEVEMENT UNDER MMA,

SCHEMES WITHIN SERCHHIP DISTRICT FOR THE YEAR

2009-2010

Sl.

No.Sanction Head/Particulars of Works

Target AchievementRemarks

Phy. Fin. Phy. Fin.

1 Multiplication of planting materials

(Cane Setts) of improved variety of sugarcane - 130 Ha. @

Rs. 2000/- per Ha. 130 2.60 130 2.60

TOTAL :- 130 2.60 130 2.602 For Conducting Demonstration on packages & practices of

RICE - 72 Ha. @ Rs.2500/- per Ha. 72 1.80 72 1.80Demonstrattion of SRI

- 108 acres @Rs.3000/- per acre 108 3.24 108 3.24For conducting Demonstration on packages & practices of

RICE - 56 Acres @ Rs.2500/- per Acre. 56 1.40 56 1.40

TOTAL :- 236 6.44 236 6.443 Promotion of Small Vermiculture Units

- 13 units @ Rs.15000/- per unit 13 1.95 13 1.95

TOTAL :- 13 1.95 13 1.954 Incentive purchase of locally produced vermicompost of 50

Qtls. @ Rs.12/- per Kg. 50 0.60 50 0.60Already

purcahedTOTAL :- 50 0.60 50 0.60

₨ In lakhs

Sl.

No.Sanction Head/Particulars of Works

Target AchievementRemarks

Phy. Fin. Phy. Fin.

5 Khawlailung to Tuichang Link Road/PAC 1 Km 4.00 1 Km 4.00

Serchhip to Tuikum Link Road/PAC 0.5 Km 2.00 0.5 Km 2.00

Chhiahtlang to Zalreng Link Road/PAC 1 Km 5.00 1 Km 5.00

TOTAL :- 11.00 11.006 Execution of Land Development Works at :

6.72 6.72

Works

under

progress

Tuitam 4 Ha 4 Ha

Matvate 4 Ha 4 Ha

Tuirini,

@ Rs. 56000/- per Ha. 4 Ha 4 Ha

TOTAL :- 6.72 6.727 Cunducting Farmers Field School at 6 (six)

villages @Rs.17000/- per FFS 6 1.02 6 1.02

TOTAL :- 1.02 1.028 For conducting extension training and Mass

Media campaign under IPRD - CSS 2 1 2 0.70

TOTAL :- 1.00 0.70

PHYSICAL AND FINANCIAL ACHIEVEMENT UNDER MMA, SCHEMES

WITHIN SERCHHIP DISTRICT FOR THE YEAR 2009-2010

₨ In lakhs

7. PROGRESS REPORT OF ISOPOM UPTO 2ND QUARTER

Sl. No. Sanction Head/Particulars of WorksTarget Achievement

RemarksPhy. Fin. Phy. Fin.

1 Expansion of Area

Maintenance of existing area

a) 2010-2011 - 1st Year NIL NIL NIL NIL

b) 2009-2010 – 1st Year 396 18.2 396 18.2

c) 2008-2009- 2nd Year 40 1.32 40 1.32

d) 2007-2008 – 3rd Year 2 Drip Irrigation 6 NIL

Training cum Awareness campaign for 5 nos. of

Villages 5 1.58 5 1.584 Oilpalm Visit to Kolasib 1 0.55 1 0.555 Visit to Mamit

LS 0.6 NIL NIL6 Exposure Visit

a) Farmers 6 NIL NIL

b) Extension Staff 1 NIL NIL 6 Demonstration of Oilpalm for covering 3.00 Ha. 3 0.25 3 0.25

7 Demonstration 2 Ha. 0.33

8 Purchase of Diesel Pumpset in subsidy - 30 nos. @

Rs.10000/- per no. 30 3 30 Nil9

Construction of half moon Terrace 12.25 Ha 2.5235 NIL NIL 10

Drilling and Installation of submergible pump 1 NIL 11 Potential Area Connectivity NIL NIL NIL NIL 12 Purchase of Agriflims NIL NIL NIL NIL

₨ In lakhs

PROGRESS REPORT OF ISOPOM UPTO 2ND QUARTER

Sl. No. Sanction Head/Particulars of WorksTarget Achievement

Phy. Fin. Phy. Fin.

13 Developemnt of Vermicompost NIL NIL NIL NIL 14 25mm HDPE Pipe 350 roll 350 roll 15 32mmHDPE pipe NIL NIL NIL NIL 16 P.P Chemicals17 Knapsacks Sprayer 31 nos 31 nos 18 Transportation of seedling from nursery

to farmers field 46503 39.34 46503 39.3419 Water Harvesting Structure 8 nos 2 NIL NIL 20 Construction of Dug-out Pond for 48

nos. @ Rs.7300/- per unit. 48 3.5 48 3.521 Community Water Harvesting Structure

- 4 nos. @ Rs.25000/- per units4 1 4 1

22 District Oilpalm Zonal Committee FundLS 0.25 LS 0.15

₨ In lakhs

REPORT ON MOBILE SOIL TESTING

Palce : Chhingchhip

Date : 20th - 25th September, 2010

Total no. of Soil Sample Collected : 45 nos.

Total no. of Soil Sample Tested : 16 nos.

Distribution of Soil Health Card : 25-9-2010

Sl.

No.Name Location

Received

DatepH Temp ˚C

Conduc-

tivityN P K

1 Hauzingi Tuisen Zau 21.9.10 4.21(A) 26.7˚C 0.40(N) 0.003(L) 12.99(M) The air valve of

compre-ssor is

loose. Due to this

leakage of air K is

not tested.

2 R.Lalthangliana Upper Mat 21.9.10 4.92(A) 27.6˚C 0.40(N) 0.009(M) 2.24(L)

3 K.Lalrinliana Mat area 21.9.10 4.63(A) 27.8˚C 0.37(N) 0.011(H) 38.25(H)

4 Hmingthanzauva Mat area 21.9.10 4.43(A) 27.3˚C 0.24(N) 0.015(H) 67.05(H)

5 C.Lalsangpuia Mat area 21.9.10 5.03(A) 24.9˚C 0.56(N) 0.011(H) 17.47(M)

6 Lalengzauva Sakei Lui 21.9.10 4.46(A) 27.2˚C 0.11(N) 0.02(H) 4.50(L)

7 Lalthanchhunga Tuikum 22.9.10 4.45(A) 27.4˚C 0.54(N) 0.003(L) 2.28(L)

8 B.Lalthanngura Tuikum 22.9.10 4.66(A) 25.8˚C 0.44(N) 0.014(H) 8.96(L)

9 H.Lalramliana Sakei Lui 22.9.10 4.58(A) 25.6˚C 0.40(N) 0.021(H) 20.16(M)

10 Liankeuva Tuisen Zau 22.9.10 4.42(A) 28.3˚C 0.21(N) 0.01(H) 8.96(L)

11 Liankeuva Tuisen Zau 22.9.10 4.18(A) 28.2˚C 0.53(N) 0.004(L) 12.26(H)

12 Challianzinga Tuisen Zau 22.9.10 6.08(N) 25.9˚C 0.58(N) 0.009(H) 71.23(H)

13Abraham

HmingthanzauvaUpper Mat 23.9.10 4.60(A) 28.4˚C 0.37(N) 0.008(H) 20.28(M)

14 K.Lalfakawmi Upper Mat 23.9.10 5.18(A) 28.0˚C 0.40(N) 0.007(M) 32.58(H)

15 R.Thanthuama Tuisen Zau 23.9.10 4.62(A) 28.5˚C 0.21(N) 0.009(H) 12.37(M)

16 Vanlalsawma Upper Mat 23.9.10 5.05(A) 28.1˚C 24.0(N) 0.013(H) 18.26(M)

(A) = Acidic, (N) = Normal, (L) = Low, (H) = High,

(M) = Medium

KUM 2010 CHHUNGA DAO's OFFICE, SERCHHIP STORE RECORD

Sl. No.

Received Date ParticularsQnty.

ReceivedQnty. Issue

Stock Balance

Remarks

1 27-9-10 32 mm 7500 M 7500 M NIL For Sale2 15-6-10 75 mm 550 Nos. 545 Nos. 5 For Sale3 3/6/2010 Rotary Weeds 220 Nos. 72 Nos. 148 Free issue for SRI4 4/6/2010 Sprayer 250 Nos. 60 Nos. 190 For Sale5 15-3-10 Chloriphyiphos 15 Lits 11.4 Lits 3.6 For Sale6 15-3-10 2,4 - D 30 Kgs 30 Kgs NIL . - do -7 15-3-10 Corbofuran 30 Kgs 24 Kgs 6 . - do -8 15-3-10 Dichlovos 10 Lits 10 Lits NIL . - do -9 15-3-10 Carbendazim 10 Lits 2.4 Lits 7.6 . - do -

10 15-3-10 Carbaryl 10 Lits 3.2 Lits 6.8 . - do -11 15-3-10 Glyphosate 15 Lits 15 Lits NIL . - do -12 15-3-10 Phosphomidon 10 Lits 10 Lits NIL . - do -13 15-3-10 Mancozeb 15 Lits 0.5 Lits 14.5 . - do -14 15-3-10 Metaloxyl 5 Kgs 5 . - do -15 15-3-10 Roban Cake 20 Kgs 20 Kgs NIL . - do -16 15-3-10 Butachlore 30 Lits 30 Lits NIL . - do -

KUM 2010 CHHUNGA DAO's OFFICE, SERCHHIP STORE RECORD

Sl. No.

Received Date Particulars Qnty. Received Qnty. IssueStock

BalanceRemarks

17 19-3-10 Captan 23 Pkts 23 Pkts NIL Free issue

18 1-410 Mustrad 10 Qtls 0.67 Qtls 9.33 Free Issue under MMA

19 16-3-10 Rice Bean 4 Qtls 4 Qtls NIL . - do -20 1/4/2010 Rice Bean 2 Qtls 2 Qtls NIL . - do -21 3/6/2010 Ground Nut 400 Kgs 51 Kgs NIL . - do -22 16-3-10 Cow Pea 9.5 Qtls 9.5 Qtls NIL . - do -23 15-3-10 Maize(Local) 5 Qtls 5 Qtls NIL . - do -

24 15-3-10 Brocoli 30 Packs 30 Packs NIL . - do -25 19-3-10 Maize (Project 28.7 Qtls 28.7 Qtls NIL . - do -26 15-3-10 Chilli 35 Kgs 35 Kgs NIL . - do -27 15-3-10 Soyabean 20.4 Qtls 20.4 Qtls NIL . - do -28 23-6-10 Pumkin 70 Kgs 70 Kgs NIL . - do -

29 3/6/2010 Lady Figer 15 Packs 15 Packs NIL . - do -30 23-10 Rayma 3 Qtls 3 Qtls NIL . - do -31 13-7-10 Paddy, KRH-II 6 Qtls Qtls NIL . - do -32 7/6/2010 Paddy, IR-64 205 Qtls 153.6 Qtls NIL . - do -33 29-1-10 Slaked Lime 2340 Qtls 1771 Qtls 569 Free issue

AGRI, COMPLEX

DUGOUT POND UNDER OILPALMDUGOUT POND UNDER OILPALM

R.LALBIAKSANGA SRI DEMONS,

CHAMDUR

SRI DEMONSTRATION, ZAWLPUI

UNDER DAO, SERCHHIP SRI 28 DAYS, ZAWLPUI SERCHHIP

SRI HMANGA BUHCHI KUI

PAWH DAN TUR

NLUP :

1. Loneitu in WRC tin 1 hmun lek hi NLUP ah thlang

ta sela ₨1,50,000.00 kha pek tho tur em ni ang?

Nge an ram neih dan a zirin kan pe tlem mai

dawn em ni ang. Tin, siam ngai mang tawh lo

ten thlang ta tho se engtia tih tur nge ni ang.

2. Sugarcane ah hian tlem a zawng chin sa lio nei

ta sela(Tin 1 hm,un vel) hei hi kan rin sank nghal

dawn em ni ang.

3. Estimate ah hian Leilet thar siamna turin siam a

ni a. Mahse an leilet kha siam zawh tawh siam

ngai tawh manglo nise, estimate a awm lo –

entirnan : Tuichhunchhuah siam te hi a tih ve

theih em.