NATIONAL TRANSMISSION ANDNATIONAL TRANSMISSION AND
DESPATCH COMPANYDESPATCH COMPANY
PRESENTATION ONBUSINESS WORK PLAN
-
October 04, 2010
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 3/31
of prosperous Pakistan by managingsmooth and economical Transmissionand Despatch System with professional
excellence and zeal.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 4/31
National Transmission and Despatch
Company Ltd. aims to be the best electricityTransmission Company maintaining highly
efficient standards, uncompromising on
Transmission System reliability and safety andcommitted to become the best service
provider to the power producers, distribution
companies and bulk power consumers
connected to its Network.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 5/31
NTDC was granted Transmission License No.TL/01//2002
on 31st December 2002 by NEPRA to engage in the
exclusive transmission business for a term of thirty (30)
years, pursuant to Section 17 of the Regulation of
Generation, Transmission and Distribution of Electric
Power Act, 1997. Under the regime set out in the License,
the Company is entrusted to act as:-
• System Operator (SO)
• Transmission Network Operator (TNO)
Central Power Purchasing Agency (CPPA)entral Power Purchasing Agency (CPPA)
• Contract Registrar and Power ExchangeAdministrator (CRPEA)dministrator (CRPEA)
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 6/31
NTDC was incorporated on 6th November, 1998, .
It was organized to take over all the properties, rightsand assets, obligations and liabilities of 220 kV and
owned by WAPDA. Presently, NTDC operates and
maintains the following Network System:
• 27 Nos. 220 kV Grid Stations, 7,359 km of 220 kV lines• 12 Nos. 500 kV Grid Stations, 5,077 km of 500 kV lines39 Nos 12 436 Km
9 Nos. 12,436 Km
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 7/31
Addition of Transmission lines &
transformation capacity of NTDC system foreconomical, reliable & efficient operation of
delivery to the Distribution Companies
DISCOs and bulk ower consumers at theirload centres.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 8/31
The Grid System Operation (GSO) is a functional tier of TNO,
maintaining 39 Grid Stations of 500 kV and 220 kV level and
12,436 Km long transmission lines linking various power
t ti t l d t th h f ll i f 4 (GSO)tations to load centers through following four 4 (GSO)
regions:
Lahore• Lahore ,• Islamabad,
• Multan and• Hyderabadyderabad
The GSO system is used for transportation of electricity from
generation units to DISCOs and Bulk Power Consumers (BPCs).( )
This system spreading all over the country is being
maintained properly and efficiently. The GSO regions are
availing technical services from Technical Services Group
(TSG) and System Protection (SP) based in Lahore.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 9/31
NTDC 500kV & 220kV SYSTEM (NORTHERN)500kV
GATTI
R O U S C H
M
500kVPESHAWAR
500kVTARBELA
500kV
GHAZI BROTHA
3478 MW
500kV
LAHORE
L T A N
S A HI WA L
500kV
REWAT
500kV
GAKHAR
1450 MW
3X450MVA 3X600MVA
220kVNISHATABAD
S A M UR O
2X450MVA3X450MVA3X450MVA
220kV
BUND ROAD
3X600MVA
220kV
K.S.K
220kV
MANGLA
220kV
GAKHAR
220kV
SIALKOT220kV
ISPR
220kVBURHAN 220kV
MARDAN
220kVRAVI
NDRI
D
220kV NKLP
4X160MVA
3X160MVA 3X160MVA 3X160MVA
1 0 0 0 MW
220kV
JWR FBD
S A HI WA L
.
1X100 MVA3X160MVA 4X160MVA
3X160MVA
3X160MVA
220kV
DAUD KHEL
220kV
CHASHMA
300 MW
3X160MVA
2X160MVA 220kV
SARFRAZNAGAR S A HI
2X160MVA
3X160MVA
220kV
BANNU
2X160MVA
2X160MVA
1X315 MVA
3X160MVA 3X160MVA
A L
2X160MVA2X160MVA
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 10/31
NTDC 500kV & 220kV SYSTEM (SOUTHERN)500kV
HUB
500kV
JAMSHORO
500kVROUSCH
500kV
MULTAN500kV
M. GARH
500kVGUDDU
500kV
DADU GA T
T I
1200 MW500kV NKI
2X600MVA
500kV
SAHIWAL
GA T T I
L A H OR
395 MW
2X450MVA 1X450MVA 3X450MVA
1155 MW
220kV
AES LALPIR
220kVM. GARH
TPS Ph-II
1X600MVA 2X450MVA 2X600MVA
220kV
VEHARI
220kV
M. GARH
TPS Ph-I
700 MW
2X160MVA
220kV
2X160MVA
220kV
UCH
350 MW
340 MW
3X160MVA
220kV
GA T T I
TO KESC 220kV
BAHAWALPURKDA-33 550 MW
220kVQUETTA
220kV
HALA RD HYD
A RF RA Z NA GA R
220kV
KOT ADDU
350 MW
220kV
SAMUNDRI
ROAD FBD
790 MW
220kV
SHIKARPUR
2X160MVA
1X285 MVA
1X160 MVA 220kV
NGPS
I S HA T A B A D
2X160MVA
2X160MVA
3X160MVA2X160MVA
1X160MVA
3X63.5 MVA 3X160MVA
TO VEHARI
3X160MVA
1386 MW
60 MW
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 11/31
•Strict follow up of maintenance schedule as per system operatingprocedures.
•Use of updated protection & SCADA System with suitable back-up.
• Measures to control the reactive power deficit with theinstallation of Flexible AC Transmission System (FACTS) devices
. . .
•Adherence of N-1 contingency criteria while allowing shut downs
especially on 500 kV Auto Transformers and Transmission Lines.•Increase in frequency of cleaning/ washing of grid stations
equipment and disc insulators of transmission lines in thepolluted areas.
•Providing of additional cooling arrangements to increase theloading capacity of power transformers.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 12/31
•Regular replacement of defective/broken disc insulators,towers and repairing of broken strands of conductor.
areas to pin points the defects for timely rectification.•Maximum shutdown arrangements in low load flow season
for preventive maintenance of the system.
•Provision of sufficient stock of material/spares for
re lacement.•Detail Checking of protection system settings for proper
operation.
• -
areas for developing liaison against miscreants.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 13/31
The Code of Corporate Governance as stipulated by SECP, and so far as itapplies to NTDC, is being complied with.
NTDC normally conduct Meetings of BOD as per Company Ordinance• NTDC, normally conduct Meetings of BOD as per Company Ordinance.
• Significant issues placed for decision by the BOD include:
•Annual PSDP, and Operational budgets;•Annual Financial Statement of NTDC and Mana ement letters issued b
the commercial auditors;•All cases relating to acceptance of Tender for execution of Works,
Purchase of store material beyond the financial powers of CEO NTDC.
debts,•Write-off of losses beyond the competency of the CEO;•Status and implications of any law suit or proceedings of material
na ure, e y or aga ns e company;
• The CFO and the Company Secretary attend BOD meetings
NTDC has established audit committee as required in the code ofTDC has established audit committee as required in the code of
corporate governance.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 14/31
• STRENGTH
NTDC is a major player in the National Power System and sole
licensee of transmission of electricity from power producers to
Distribution Companies.
• WEAKNESSES
x s ng n ras ruc ure an facilities are na equa e o ca er o e
requirement of evacuation of power from future hydel and coal
resources in the country.
• OPPORTUNITIES
Company is open to take long term finances from local as well as from
.
• THREATS
The fluctuation in demand MW due to seasonal chan es and ower
shortages may reduce its recovery of revenue requirements.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 15/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 16/31
• To keep the financial Discipline intact.
•
by introducing various budgetary control measures.
• To ensure the timely availability of funds forprogressive completion of the NTDCs Transmission
enhancement.
the new mechanism introduced by Energy Divisionof Planning Commission of (GoP) for PSDP fundreleases.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 17/31
• Operational Maintenance Cost of the systemy
• Debt Servicing for NTDC System expansion
• Return on Equity plough back to enhance the
NTDC System
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 18/31
The results projected by NTDC have the following
characteristics:
Th t t t b hi d b d li ti•The targets to be achieved are based on realistic
assumptions for future projections.
The inflationary impact has been taken into accounthe inflationary impact has been taken into account
while preparing these projections.
•Future growth of 5 in peak demand is also included inuture growth of 5 in peak demand is also included in
action plan of the company.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 19/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 20/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 21/31
NEPRA has started disallowing T&T losses beyond 2.5% from Jan-
.
component in Line with the last tarif f determination
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 22/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 23/31
. .
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 24/31
Mln.Rs.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 25/31
Mln.Rs.
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 26/31
(Mln.Rs.)
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 27/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 28/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 29/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 30/31
7/26/2019 About Ntdc
http://slidepdf.com/reader/full/about-ntdc 31/31