a419 - london road€¦ · pjb cb mas p03 29/06/18 natural river bank added to proposed river...
TRANSCRIPT
BRIMSCOMBE
VARIOUS WAREHOUSE ENTERPRISES
RIVER FROME
RIVER FROME
(BRIMSCOMBE PORT INDUSTRIAL ESTATE)
METAL BUILDING
UNIT 6
MILL
DENSE VEGETATIONLIMITED ACCESSRIVER FROME
DENSE VEGETATIONLIMITED ACCESS
BRIM
SCO
MBE
HIL
L
PORT LANE
A419 - LONDON ROAD
NOAH
S ARK
STROUD HAND CAR WASH
BRIMSCOM
BE HILL
CANAL
RIVE
R FR
OM
ERIVER FROME
DENSE VEGETATIONLIMITED ACCESS
BUSSTOP
D
r
a
i
n
MP
99.75
C
l
e
e
v
e
W
h
i
t
e
H
o
u
s
e
1
t
o
5
H
o
u
s
e
PW
Laurels
C
l
e
e
v
e
Brentwood
Lugano
Port
Terrace
1
The
C
o
t
t
Wharf
East
Cottage
6
9
.
9
m
FB
Bourne Mills
7
0
7
5
Bourne
House
7
6
T
h
e
C
l
e
e
v
e
s
E
l S
ub S
ta
5
P
OPenrith
House
5
S
p
o
u
t
S
p
o
u
t
The
Laburnums
Conway
C
o
t
t
a
g
e
S
p
r
i
n
g
f
i
e
l
d
House
V
i
l
l
a
O
s
b
o
r
n
e
H
o
u
s
e
4
5
6
S
p
r
i
n
g
f
i
e
l
d
R
o
c
k
C
o
t
t
a
g
e
W
h
a
r
f
s
i
d
e
V
i
e
w
The Firs
1
EXISTING RIVER CHANNEL
TO BE MODIFIED TO TIE
INTO NEW CHANNEL.
PROPOSED WAITING
MOORING FOR NARROW
SECTION BENEATH BRIDGE.
EXISTING LISTED STONE
WALL TO BE RETAINED.
REINSTATED CANAL
TO TIE INTO EXISTING
CANAL AT BRIDGE.
BOURNE BRIDGE
AND LOCK
BRIMSCOMBE MILL
(LISTED)
5m WIDE ENVIRONMENT
AGENCY ACCESS STRIP.
BL 55.05
BL 55.15
WL 56.60
WL 56.60
WL 57.10
57.70
57.70
57.70
57.70
57.70
BL 55.60
BL 55.60
PROPOSED
MOORINGS.
PROPOSED NEW
CANAL BASIN.
PROPOSED
WINDING HOLE.
PROPOSED REINSTATED CANAL. MIN.
WIDTH: 7m OVER-WIDENED ON BENDS TO
ACCOMMODATE VESSEL MOVEMENTS.
2m WIDE TOWPATH PROVIDED.
PROPOSED LOCK
WAITING MOORING.
WL 57.10
WL 57.10
WL 57.10
BL 55.60
BL 55.60
57.70
57.70
57.70
57.70
57.70
58.20
57.70
58.20
57.70
BL 55.60
58.20
57.70
58.20
PROPOSED BAT HOUSE.
DIMENSIONS SUBJECT
TO CONFIRMATION.
57.70
PROPOSED PEDESTRIAN
SWING BRIDGE. DETAILS
SUBJECT TO CONFIRMATION.
EXISTING RIVER CHANNEL TO REMAIN
UNCHANGED WITH THE EXCEPTION
OF WESTERN BANK WHERE BUILDING
IS TO BE DEMOLISHED.
SALT WAREHOUSE
(LISTED)
PROPOSED NEW
RIVER CHANNEL
REPLACING
CULVERT.
POSSIBLE CANAL FEEDER
LOCATION. SIZE SUBJECT
TO CONFIRMATION.
BL 54.94
55.60
PROPOSED WEIR AT LIMIT
OF NEW CANAL TO
PERMIT SPILL INTO RIVER.
CREST LEVEL: 57.10mAOD
PROPOSED NEW RIVER CHANNEL
TO TIE BACK INTO EXISTING
RIVER FROME CHANNEL.
CHANNEL MAY REQUIRE
RE-GRADING TO SUIT LEVEL OF
UPSTREAM PROPOSED CHANNEL.
PROPOSED SPILLWAY TO
DIRECT OVERFLOWING
WATER INTO RIVER.
EXISTING CHANNEL BANK
TO BE LOWERED TO
ACCOMMODATE SPILLWAY.
EXISTING HIGHWAY
ACCESS TO BE RETAINED.
57.66
57.70
PROPOSED FOUL WATER
SEWER DIVERSION.
PROPOSED SEWER
EASEMENT. WIDTH: 10m
EXISTING FOUL WATER
SEWER TO BE ABANDONED.
EXISTING FOUL WATER
SEWER TO BE ABANDONED.
PROPOSED FOUL WATER
SEWER DIVERSION.
450Ø
4
5
0
Ø450Ø
4
5
0
Ø
4
5
0
Ø
4
5
0
Ø
4
5
0
Ø
4
5
0
Ø
4
5
0
Ø
FD01
FD02
FD03
FD04
FD05
FD10
FD11
FD12
FD13
FD14
FD15
IL
5
3
.7
2
IL
5
3
.7
2
I
L
5
4
.
5
6
IL
5
4
.1
5
IL
5
3
.8
7
I
L
5
3
.
8
7
I
L
5
3
.
8
5
IL
5
3
.8
5
I
L
5
5
.
9
7
I
L
5
5
.
9
7
I
L
5
6
.
0
2
IL 56.23
IL 56.23
IL 5
6.0
2
IL 5
6.1
0
IL
5
6
.1
0
IL
5
6
.1
3
IL 56.13
IL 54.56
IL
5
3
.9
1
I
L
5
4
.
1
5
IL
5
3
.9
1
PROPOSED FOUL WATER
SEWER DIVERSION.
PROPOSED 10m WIDE
SEWER EASEMENT.
8
2
5
Ø
8
2
5
Ø
1
5
0
0
x
9
0
0
EXISTING MILL RACE TO BE
RETAINED. LINE SUBJECT
TO CONFIRMATION.
UPSTREAM END OF EXISTING MILL
RACE SHOWN INDICATIVELY. LOCATION
SUBJECT TO CONFIRMATION.
S
N
1
.
0
0
0
1
2
0
0
Ø
S
N
1
.
0
0
1
1
2
0
0
Ø
S
N
1
.
0
0
2
1
2
0
0
Ø
S
N
1
.
0
0
3
1
2
0
0
Ø
S
N
1
.
0
0
4
1
2
0
0
Ø
S
N
1
.
0
0
5
1
2
0
0
Ø
S
N
1
.
0
0
6
1
2
0
0
Ø
S
N
1.007 1200Ø
S
N
1
.0
0
9
1
2
0
0
Ø
S
N
1
.0
1
0
5
2
5
Ø
S
2
.
0
0
0
2
2
5
Ø
SN1
SN2
SN3
SN4
SN5
SN6
SN7
SN8
SN9
SN10
SN12
S
N
1
.0
0
8
1
2
0
0
Ø
SN11
F
N
1
.
0
0
0
1
5
0
Ø
F
N
1
.
0
0
1
1
5
0
Ø
F
N
1
.
0
0
2
1
5
0
Ø
F
N
1
.
0
0
3
1
5
0
Ø
F
N
1
.
0
0
4
1
5
0
Ø
F
N
1
.
0
0
5
1
5
0
Ø
F
N
2
.
0
0
3
1
5
0
Ø
F
N
2
.0
0
2
1
5
0
Ø
F
N
2
.0
0
1
1
5
0
Ø
F
N
2
.0
0
0
1
5
0
Ø
F
N
1
.
0
0
6
1
5
0
Ø
F
N
1
.
0
0
7
1
5
0
Ø
FN1
FN2
FN3
FN4
FN5
FN6
FN11
FN10
FN9
FN8
FN7
FN12
PROPOSED FOUL WATER SEWERS
TO DISCHARGE INTO DIVERTED
FOUL WATER SEWER.
PROPOSED FLOW CONTROL.
HYDROBRAKE OR EQUIVALENT.
MAXIMUM DISCHARGE RATE:
140L/S @ 1.2M HEAD.
SN13
(HW)
PROPOSED SEWER
CROSSING UNDER RIVER.
ROCK TO BE PLACED OVER
TO ACHIEVE MIN. 0.6M COVER.
DENSE VEGETATIONLIMITED ACCESS
ORCHARD LANE
A419 - LONDON ROAD
BRIMSCOM
BE HILL
DENSE VEGETATION
LIMITED ACCESS
DENSE VEGETATIONLIMITED ACCESS
DENSE VEGETATIONLIMITED ACCESS
BUSSTOP
SP
1
W
e
s
t
o
n
V
i
l
l
a
T
h
e
C
l
e
e
v
e
s
2
W
o
r
k
s
O
r
c
h
a
r
d
s
E
n
d
TCB
Meml
War
W
o
r
k
s
5
GOUGH'S ORCHARD
BRIDGE AND LOCK
BL 54.94
PROPOSED NEW RIVER CHANNEL
TO TIE BACK INTO EXISTING
RIVER FROME CHANNEL.
CHANNEL MAY REQUIRE
RE-GRADING TO SUIT LEVEL OF
UPSTREAM PROPOSED CHANNEL.
EXISTING CHANNEL BANK
TO BE LOWERED TO
ACCOMMODATE SPILLWAY.
EXISTING HIGHWAY
ACCESS TO BE RETAINED.
EXISTING SPOIL HEAP TO BE REMOVED.
MATERIAL TO BE ANALYSED TO DETERMINE
SUITABILITY FOR RE-USE AS FILL MATERIAL.
EXISTING ACCESS TO BE MAINTAINED
FOLLOWING COMPLETION OF PHASE 1.
EXISTING ACCESS TO BE
MAINTAINED FOLLOWING
COMPLETION OF PHASE 1.
PROPOSED FOUL WATER
SEWER DIVERSION.
EXISTING MILL RACE TO BE
RETAINED. LINE SUBJECT
TO CONFIRMATION.
S
N
1
.0
1
0
5
2
5
Ø
SN13
(HW)
TEMPORARY OUTFALL
HEADWALL INTO EXISTING
RIVER FROME CHANNEL.
P01 21/12/17 FIRST ISSUE PJB CB MAS
P02 05/06/18
ABUTMENTS FOR SWING BRIDGE OVER CANAL
ADDED.
PJB CB MAS
P03 29/06/18
NATURAL RIVER BANK ADDED TO PROPOSED
RIVER CHANNEL. FOUL WATER DIVERSION
REVISED. ROCK RAMP ADDED DOWNSTREAM OF
EXISTING WEIR.
PJB CB MAS
P04 05/04/19
DRAINAGE LAYOUT UPDATED. BRIMSCOMBE HILL
HIGHWAY WORKS REMOVED. NOTES AND LEVELS
UPDATED.
PJB CB MAS
P05 09/04/19
REMOVAL OF EXISTING SPOIL HEAP WEST OF
BRIMSCOMBE HILL SHOWN.
PJB CB MAS
N
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Date Date Date
Drawn Checked Authorised
Millim
etre
s
10
01
00
Client
Copyright C Atkins Limited (2017)
www.atkinsglobal.com
Original Size
Suitability
Tel:
Fax:
Drawing Number Revision
+44 (0)1214 835000
+44 (0)1214 835252
The Axis
10 Holliday Street
Birmingham
B1 1TF
Rev. Date
Description By
Chk'd
App'd
Filen
am
e: P
:\G
BE
MC
\W
GE
\P
ro
je
cts\C
itie
s\5
15
96
15
B
rim
sco
mb
e P
ort\7
W
IP
\7
1 C
\7
11
C
AD
\D
R\S
ite
W
id
e\5
15
96
15
-A
TK
-Z
Z-B
P-D
R-C
-0
10
3-P
05
In
fra
stru
ctu
re
G
en
era
l A
rra
ng
em
en
t - P
ha
se
1
.d
wg
US
ER
: B
IR
K6
68
5D
ate
: 09
/4/1
9 0
9:4
7:2
7
DO NOT SCALE
BRIMSCOMBE PORT
PROPOSED INFRASTRUCTURE
GENERAL ARRANGEMENT
(PHASE 1)
PJBPJB CB MAS
21/12/1721/12/17 21/12/17 21/12/17
1:500
S2
5159615-ATK-ZZ-BP-DR-C-0103 P
FOR INFORMATION
05
A0
NOTES
1. DO NOT SCALE OFF THIS DRAWING.
2. THIS DRAWING IS BASED ON A TOPOGRAPHICAL SURVEY
UNDERTAKEN BY BERNARD GEOMATICS (JULY 2017).
3. ALL LEVELS SHOWN, EXISTING AND PROPOSED, ARE IN
METRES ABOVE ORDNANCE DATUM.
4. EXISTING SEWERS SHOWN ARE TAKEN FROM SEVERN TRENT
WATER SEWER RECORDS.
5. FOR DETAILS OF THE WORKS COMPRISING PHASES 2 AND 3
REFER TO DRAWING NUMBERS 5159615-ATK-ZZ-BP-DR-C-0100
AND 0103.
6. PROPOSED CANAL HAS BEEN DESIGNED TO ACCOMMODATE
A DESIGN VESSEL WITH A LENGTH OF 22m AND BEAM OF 5m
AS PER STROUD VALLEY CANAL COMPANY (SVCC)
STANDARDS.
7. FOUL WATER SEWER DIVERSIONS ARE SUBJECT TO
DISCUSSION AND CONFIRMATION WITH SEVERN TRENT
WATER.
8. ALL PROPOSED HIGHWAY GEOMETRY IS SUBJECT TO
DISCUSSION AND APPROVAL FROM GLOUCESTERSHIRE
COUNTY COUNCIL.
9. ALL RIVER MODIFICATIONS ARE SUBJECT TO HYDRAULIC
MODELLING AND APPROVAL BY THE ENVIRONMENT AGENCY.
EXISTING CANAL
PROPOSED CANAL
EXISTING RIVER
PROPOSED RIVER
ENVIRONMENT AGENCY ACCESS STRIP
LISTED BUILDING
PROPOSED SEWER EASEMENT
EXISTING COMBINED SEWER
EXISTING FOUL WATER SEWER
PROPOSED CANAL TOWPATH
PROPOSED SURFACE WATER SEWER
PROPOSED FOUL WATER SEWER
PROPOSED DEVELOPMENT BOUNDARY
KEY
SAFETY, HEALTH AND ENVIRONMENTAL
INFORMATION
In addition to the hazards/risks normally associated with the types of work
detailed on this drawing, note the following:
CONSTRUCTION
MAINTENANCE/CLEANING
DECOMMISSIONING/DEMOLITION
It is assumed that all works will be carried out by a competent contractor
working, where appropriate, to an approved method statement
CONTAMINATED GROUND INCLUDING ASBESTOS.
GROUNDWATER UNDER ARTESIAN PRESSURE CONTAINED BY
UNDERLYING LIAS CLAY. RISK OF RELEASE IF CLAY LAYER IS
PUNCTURED.
UNMAPPED BURIED SERVICES AND VOIDS.
A419 RETAINING WALL TO BE PROTECTED.
STABILITY OF EXISTING BURIED STRUCTURES (E.G. ORIGINAL
CANAL WALLS) UNKNOWN.
RISK OF CONTAMINATED WATER FROM CANAL ENTERING RIVER.
CONTAMINATED GROUND INCLUDING ASBESTOS.
GROUNDWATER UNDER ARTESIAN PRESSURE CONTAINED BY
UNDERLYING LIAS CLAY. RISK OF RELEASE IF CLAY LAYER IS
PUNCTURED.
A419 RETAINING WALL TO BE PROTECTED.
FO
R C
ON
TIN
UA
TIO
N S
EE
IN
SE
T
FO
R C
ON
TIN
UA
TIO
N S
EE
M
AIN
D
RA
WIN
G
N