A Focused Organization

Mission Statement

To be an efficient and quality driven Engineering, Procurement & Construction company offering reliable service to Nigerian industries.

Vision

To become the choice EPC

contractor for oil ,gas ,power and

infrastructure projects delivering

excellence in all undertaken projects

Page 3: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

“There can be economy only where there is efficiency.”

Benjamin Disraeli

Page 4: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

A history of sustained growth; excelling inevery endeavour

Founded June 1968; with an initial share capital of £5,000 which has grown to an authorized Share Capital of NGN2 Billion.

With steady and sustained growth, MORPOL has emerged as an EPC Contractor for medium to large EPC turnkey projects with capability of executing EPC projects of up to USD 300M in the Oil &Gas and Power infrastructure sectors.

Relationship with foreign principals and strategic alliances with local and international technical partners have helped in the growth and capacity development of core competencies.

ABOUT MORPOL

Page 5: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Our past: Established 1968 as a trading company and evolved to an industrial procurement company.

Our present: Morpol is an established and recognized EPC contractor, executing mainly pipeline works, but also brownfield and greenfield oil and gas facilities . Turnover has grown to almost N7 Billion, workforce of about 400 and 15% PBT, N3 Billion backlog and in excess of N5 Billion assets

Our Future:: Our vision for the future is to create an integrated EPC contractor operating in in the oil, gas and power sectors with a workforce of 1500 people, 15% PBT, N40 Billion backlog and N15Billion assets.

Page 6: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

LIST OF DIRECTORS

Alhaji Ibrahim Abdurrahman Okene Chairman

Mrs W.H. Paulus Vice Chairman

Chief S.S. Sanusi Managing Director / CEO

Nofal J. Paulus Executive Director Business Development

Edward Tawfik Executive Director

F. A. Ajejunikanwa Executive Director Engineering

O. B. Arogundade Executive Director Finance & Admin

Nabiel B. Abbou Non-Executive Director

Page 7: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

OTHER MANAGEMENT PERSONNEL

Adeyemo A. E Sales & Marketing Manager

Abdurrahman A. B Instrument & Electrical Manager

Onaolapo A. J Automation & Control Manager

Omole A. J HSE Manager

Allen A.K Pre-commissioning Manager

Afolayan A.J Project Account Manager

Adegoke S.A.S Finance Manager

Page 8: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

MANAGING DIRECTOR/CEO

EXECUTIVE DIRECTOR OPERATIONS

BOARD

INTERNAL AUDITING

EXECUTIVE DIRECTOR FINANCE /ADMIN /HR

EXECUTIVE DIRECTOR

BUSINESS DEVELOPMENT

EXECUTIVE DIRECTOR ENGINEERING

PROJECT CONTROL MANAGER

HSE/QAQC MANAGER

EXECUTIVE MANAGEMENT ORGANIZATIONAL CHART

Page 9: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

FINANCIAL SUMMARY

2018 2017 2016

Annual turnover NGN 6.16 Billion NGN4.89 Billion NGN5.29 Billion

PBT NGN976 Million NFN612 Billion N569 Billion

Assets NGN5.4 Billion NGN 4.55 Billion NGN3.66 Billion

Financial Liabilities NGN1.49 Billion NGN1.04 Billion NGN1.38 Billion

Receivables NGN1.2 Million NGN1,17Million NGN2.112 Million

Page 10: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

International Partnerships

Engineering and Design, pressurized and custom vessels and equipment

Process Engineering Services.

Intrisic Safety, Security & Digital Products

Page 11: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

DPR AND NIPEX REGISTERED CATEGORIESEQUIPMENT/MATERIAL SUPPLY SERVICES

• FIRE AND GAS EXTINGUISHERS

• VALVES UP TO 12”,NOZZLES & FLANGES

FACILITY MAINTENANCE

• PIPELINE MAINTENANCE

• STORAGE FACILITY MAINTENANCE

HAULAGE SERVICES

• GOODS/MATERIALS ROAD HAULAGE

• PETROLEUM PRODUCTS HAULAGE

HEAVY DUTY EQUIPMENT SUPPLY, INSTALLATION & MAINTENANCE

• VALVES (12 INCHES & ABOVE)

• TANKS

INSTALLATION AND MAINTENANCE SERVICES

• MECHANICAL INSTALLATION/MAINTENANCE & MATERIALS

• ELECTRICAL INSTALLATION/MAINTENANCE & MATERIALS

MAJOR CONSTRUCTION SERVICES

• STRUCTURAL ENGINEERING

• MECHANICAL ENGINEERING

ONSHORE PIPELINE LAYING

• IPELINE PIGGING AND INSPECTION

• HYDRO TEST

REHABILITATION/UPGRADE/FABRICATION WORKS

• MINOR CIVIL WORKS

• MINOR MECHANICAL WORKS

REHABILITATION/UPGRADE/FABRICATION WORKS

• SURFACE STORAGE TANKS WORKS

• OVERHEAD TANKS

CALIBRATION SERVICES

• OIL AND GAS MEASURING EQUIPMENT/INSTRUMENTS

• - RELIEF/PRESSURE

Page 12: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

HSE statistics

• More than 7,138.836 M manhours worked over the last 10 years without LT's and in fulladherence to the stringiest HSE rules of our varios esteemed customers.

Page 13: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants
Page 14: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Committed to providing quality Engineering,Procurement and

Construction (EPC) services that meet our client’sspecifications.

QUALITYSTATEMENT Conforming to NIS ISO 9001:2015 standard

requirements.

Improving the effectiveness of our Quality ManagementSystem (QMS)

Measurable objectives at corporate, projects anddepartmental levels.

Page 15: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

FACTS AND FIGURESMajorly Nigerian owned.

All projects related activities carried out in

Nigeria.

98% of the workforce are Nigerians.

Intense training activities carried out at

any project level.

NGN3.5 Million spent of training and

personnel development per year

Average of 98% Nigerian Content

achieved over the lasts five years

NIGERIAN CONTENT

Page 16: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

0

50

100

150

200

250

Permanent Staff Cadsual Staff Average personnel on projectsite

Expatriate

Admin/Logistics 60 4 60 0

Technical 40 100 10

Tradesmen 2 11 240 0

STAFF STATISTICS

Admin/Logistics Technical Tradesmen

Page 17: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

CARE FOR PEOPLE Morpol fully recognizes the importance of human resources as the most valuable asset of the company. We have put in place a number of provisions to ensure our workforce and staff welfare, loyalty and motivation. This includes but not limited to:

Timely payment of salaries and other due financial benefits.

Timely remittance of PAYE and pension scheme contribution.

Adequate provision for healthcare.

Site facilities making of accommodation, food and recreation to the highest industry standards.

Communication facilities on site for the workers to be in touch with their families.

Fair rotation to ensure adequate period of rest to the workforce

Commitment to an Equal Employment Opportunity poilcy which prohibits discrimination and harassment of any type without regard to age, ethnicity, gender, disability status or religion.

Page 18: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

MAJOR EQUIPMENT LIST

Morpol owns an impressive list of assets that allow the company to perform its projects maintaining full control over the same.

Morpol assets list, while also including equipment for Civil works, is comprises of all the equipment required to successfully execute all scope of work for any kind of onshore, oil & gas, power facilities and pipelines.

Attached is a spreadsheet of available main Equipment by Morpol.

Page 19: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

EQUIPMENT LIST

CIVIL WORKS

• Excavators 27

• Dozer 3

• Compactor 1

• Concrete mixers 3

• Pay loader 3

VEHICLES

• Tankers 4

• SUVs, Pickup, Buses etc 64

• Trucks, trailers, tippers etc 12

PIPING & MECHANICAL

• pipe bending etc 10

• Pressure washers 5

• Welding sets 38

• Generators 18

• Compressors 5

• Pumps 9

PIPELINES EQUIPMENT

• Swamp Buggy 2

• Loaders 6

• Pipelayers sideboom, etc 15

LIFTING EQUIPMENT

• Cranes 10

• Forklifts 6

• Man lifts 4

Page 20: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

SCOPE OF

ACTIVITES

Engineering, Procurement and Construction (EPC) of

• Upstream and downstream Process Plants & Facilities.

• Pipelines and Associated Facilities.

• Storage Tanks and Silos

• Product Loading Facilities

• Various industrial plant

• Power plants up 100 MW

Maintenance, upgrade and rehabilitation of existing upstream

and downstream plants, emergency works and plants

shutdown to include:

• Mechanical, piping, electrical & Instrumentation works

• Process equipment, testing and repairs

Oil & Gas services

• Oil flushing services

• Pigging services

• Valves, meters, calibration and repair

• Testing and calibration and of instruments and control fireld devices,

such as valves, meters etc.

Wide field of endeavour,

versatile posturing and

comprehensive

integrated services range

Page 21: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Some Selected Clients

Page 22: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

OUR LOCATIONS

Port-Harcourt Metropolis.

Rumubiakani: Offices

Elelewon: 6,815 Square Metres. Proposed office complex, fabrication yard, workshop and living accommodation.

Need graphic representation

Lagos Metropolis

Apapa: 1286.5sqm for technical and administrative headquarters.

Bayelsa.

Gbaran: approximately 9.75 hectares.

About 1/3 of it has been fully developed while the remaining 2/3 provision for Jetty facilities is yet to be developed. This land has

capacity for Piping, vessels and facilities fabrication, assembly and maintenance workshop. .

Page 23: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

25,000 sqm yard beside the Gbaran-Ubie SPDC Gas plant. 30% developed. While the rest is under development, to include: residential, offices, workshops, warehouses and other facilities

Page 24: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

SELECTED ONGOING AND COMPLETED PROJECTS

Page 25: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Engineering, Procurement and Construction EPC

Page 26: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: NIGERIA GAS COMPANY

Project: EPC Rehabilitation / Upgrade of NGC Ajaokuta

Metering Station.

Value: $12,502,395.34

Year: May 2019

Status: Completion 10%

ONGOING PROJECT

EPC AJAOKUTA METERING STATION

Page 27: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: SHELL PETROLEUM DEVELOPMENT COMPANY

Project: EPC 12” x 41.5km Gas Pipeline and Composite Cable – Enweh East through Enweh West Manifold to

Gbaran CPF, Gbaran Phase 3A Enweh, Package 2

Value: Value: $100,500,000.00

Year: November 2018

Status: Completion 32%

ONGOING PROJECT

EPC 12” x 41.5km Gas pipeline AND COMPOSITE CABLE –GBARAN PHASE 3A, PACKAGE 2

Page 28: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: Engee /

Chemtex

Project: Erection,

Installation &

Commissioning of

333t/d PET SSP Plant &

Equipment, including

Mechanical, Electrical

& Instrumentation,

Agbara

Value:

$4,348,660Year:

2017

Status:

aCompleted

PAST PROJECT

Page 29: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: Indorama

Fertilizer & Petrochemic

al Ltd.

Project: Construction of 18in x

83km Pipeline, including

installation of the end

Facilities (slug, catcher,

metering skids, control rooms,

pig launcher, receiver etc.)

Value:

$41,488,084

Year:

2015/2016

Status:

aCompleted

PAST PROJECT

Page 30: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: Indorama

Fertilizer & Petrochemica

l Ltd.

Project: Erection of Steel

Structural, Buildings,

Equipment Installation,

Electrical; Instrumentation

works to build Export

Terminal , Onne Free Trade

Zone

Value:

$4,310,000

Year:

2015/2016

Status:

aCompleted

PAST PROJECT

Page 31: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: Shell Petroleum

Development Corporation

Project: EPC of 12” x 12km,

10” x 10-km, 8” x 11.5km, 6”

x 4.5km Carbon Steel

Flowlines, Manifolds,

Bulklines including intersite

compoaiste cable,, Gbaran-

Ubie Phase 2

Value:

$55,920,000 +

$2,050,000

Bonus for early

completion.

Year:

2014/2015

Status:

aCompleted

PAST PROJECT

(Nun River ) 523 Meters Pipeline and Intersite Composite Cable River Crossing activity

Page 32: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: Indorama

Fertilizer & Petrochemic

al Ltd.

Project: Construction of Water

Treatment Plants for Potable,

Demineralized and Waste Water

Value::

$5,095,554.00

Year:

2014/2016

Status:

aCompleted

PAST PROJECT

Page 33: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client

• Nigerian Gas Company

Project:

• EPC Contract for gas supply to PHCN Olorunsogo Power Plant,24” x 31km pipeline station work. Papalanto

Value

• $26,687,675.46

Year

• 2011/2012

PAST PROJECT

Page 34: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Maintenance, Upgrade and Rehabilitation

Page 35: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Project: Annual Maintenanceof Waste Water TreatmentPlants for OPHRC and NPHRC.

Value: $109,588.82 p.a.

Page 36: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Year: Since 2012/2013

Project: Provision of Manpower,Equipment and Materials forOverhaul of 71 TG 01, 02 and 03

Value: Euro 4,667,416.53

Page 37: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Year: Since 2012

Project: Supply ofMaterials, Supervision andRetubing of Boiler 70-B-03

Value: Euro 4,834,250.00

Page 38: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

During Rehabilitation of Train B After Rehabilitation of Train B

Client:Project: Rehabilitation ofWater Demineralization

Train A and B andAssociated Facilities in

PHRC Limited.

Value: $3,213,378.70 Year: 2015/2016

MORPO[

PAST PROJECT

Page 39: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Client: Warri Refinery & Petrochemical Company Limited

Project: Turn Around Maintenance(TAM 2004) :Electrical& Instrumentation Works

Value: $6.15m

Year: 2004/2005

Testing/Calibration of PSV's

Installation/Testing ofTransformers

Switch Gear & MCCsMaintenance Services

Page 40: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Turn Around MaintenanceProject:

2004/2005Year:

$6.15m+ Additional Works of $6mValue:

Page 41: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Rehabilitation of Wastewater Treatment (WWT) Plant for OPHRC and NPHRCProject:

2000/2002Year:

$13,438,412Value:

Page 42: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Oil & Gas Services

Page 43: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Year: Since 2010 to Date

Project: Provision ofPressure Safety Valves(PSV) Testing, Repairs

& Calibration onAGBAMI FPSO.

Page 44: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Year: Since 2007 to Date

Project: Lube OilFlushing of Gas Turbines& Compressors on YOHO,

EDOP, BRT, QIT, EKPE &USAN Platforms.

Page 45: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

SELECTED AWARDS

Page 46: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

CERTIFICATES

Page 47: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Why Choose Morpol

• Fully transparent and compliant company in respect ofall applicable Nigerian laws, rules, regulations andstandards.

Strict Adherence to all applicable highest quality andHSE standards.

• A truecontent

indigenous contractor exceeding the Nigerianlaw requirements.

• Possibility of leveraging international expertise based onexisting technology transfer agreement.

50 years of perfect key projects delivery.•

Page 48: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Why Choose Morpol (cont'd)

• Highest performance efficiency that translates intocompetitive edge.

Fully equipped for the execution of its assigned scopeof work.

Care for people resulting in loyal and motivated staff and workforce.

Strong financial support by shareholders and financial institutions.

Fully supportive of other stakeholders to include -insurance companies, government agencies, regulatory bodies, suppliers, vendors and OEMs.

Page 49: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants

Contact Us

PORT-HARCOURT OFFICEPlot No. 40

Chief Wopara StreetRumuobiokani, Port-Harcourt

Tel:+234-084-750237.

BAYELSA BASE:MORPOL Camp, SHELL LNGRoad, Obunagha/Yenagoa.

e-Mail: [email protected]

ABUJA OFFICE:No 5 Leribe Close Off Kolda

Link, (Behind OceanicBakery) Wuse II,AbujaTel:+23-08023271735,

0803-450-3387e-Mail: [email protected]

APAPA WORKSHOP24 Warehouse Road,

Apapa, Lagos

Page 50: A Focused Organization - Home - STEPHANO...•Power plants up 100 MW Maintenance, upgrade and rehabilitation of existing upstream and downstream plants, emergency works and plants