A M A AutoCA Manag At the end of this Set up a Link oth Set sub Set up AD® P ging a s paper, you will an AutoCAD Pla her AutoCAD Pla b project specific reports based o lant 3D Comp be able to: nt 3D Project th ant 3D projects i c properties to n n the main proje D lete Si at is based on a nto main site pr ot interfere with ect and the subp ite ove complete site, w roject. h the main proje projects. er Mul with the intentio ect. tiple P on of running a n Project number of sub p ts projects.

Upload: truongxuyen

Post on 16-Feb-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

AM

A

AutoCAManag

At the end of this

• Set up a

• Link oth

• Set sub

• Set up

AD® Pging a

s paper, you will

an AutoCAD Pla

her AutoCAD Pla

b project specific

reports based o

lant 3DComp

be able to:

nt 3D Project th

ant 3D projects i

c properties to n

n the main proje

D – lete Si

at is based on a

nto main site pr

ot interfere with

ect and the subp

ite ove

complete site, w

roject.

h the main proje

projects.

er Mul

with the intentio

ect.

tiple P

on of running a n

Project

number of sub p

ts

projects.

Page 2: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

AutoCAD Plant 3D – Managing a Complete Site over Multiple Projects Page 2

Contents Set up an AutoCAD Plant 3D Project ............................................................................................................................. 3

Setting up the main site project. ............................................................................................................................... 3

General Settings ........................................................................................................................................................ 4

Project Details ....................................................................................................................................................... 4

P&ID DWG Settings ................................................................................................................................................... 5

Paths ...................................................................................................................................................................... 5

Export and Import Settings ................................................................................................................................... 5

Data Manager Configuration ................................................................................................................................ 5

P&ID Class Definitions ........................................................................................................................................... 5

Plant 3D DWG Settings .............................................................................................................................................. 6

Export and Import Settings ................................................................................................................................... 6

Paths ...................................................................................................................................................................... 6

Link other AutoCAD Plant 3D Projects Into the Main Site Project ............................................................................ 8

Creating the Sub Project ....................................................................................................................................... 8

Getting the P&ID’s and Models into the Sub Project ............................................................................................. 10

Set sub project specific properties to not interfere with the main project. ........................................................... 13

Project Details ..................................................................................................................................................... 13

Plant 3D Class Definitions Properties .................................................................................................................. 14

Set up reports based on the main project and the subprojects. ............................................................................ 14

Report Settings .................................................................................................................................................... 14

Edit Query ........................................................................................................................................................... 15

SQL Server ............................................................................................................................................................... 16

Vault ........................................................................................................................................................................ 17

Page 3: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

SIn

S1

2

3

AutoCAD Plant

Set up an this section, se

Setting up. The init

. The dat

. Do not

3D – Managing

an Autoet up an AutoCA

p the maitial set up of the

tabase system c

use Vault at this

g a Complete S

oCAD PlD Plant 3D proje

in site pre main site proje

an be either SQL

s stage, (current

Site over Multi

lant 3D ect that is based

oject. ect should be set

Lite or SQL Expre

tly not tested)

ple Projects

Projecton a complete s

t up using the sta

ess Server

t site, with the int

andard process.

tention of runni

.

ng a number of

Page 3

subprojects.

Page 4: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

G

PAb

Uthalofi

Cs

A

AutoCAD Plant

General S

Project DetaAs the main sibe used as an

User-defined rhroughout alvoid conflict

ocation or liniles. However

Custom Propepecific should

All other prop

3D – Managing

Settings

ils te project is midentifier of t

reports directl projects areand confusioks or non-Plar, it is possible

erties should bd be complet

erties in this

g a Complete S

merely a contthe site. Rath

tory can be th going to be cn. Related filent 3D associae to have a co

be ideally foced in the Sub

section are u

Site over Multi

tainer for theher than leavi

he reports thaconsistent. Otes can be use

ated files, theommon folde

cused on the mb Project.

tilized as nor

ple Projects

e centralized mng it blank or

at are used fotherwise we

ed as requiredere is no requer for use with

main site pro

rmal.

model, the Prr entering no

or all the subwill leave thed. Because thirements regah all subproje

oject. Any oth

roject Numberelevant data

projects. Thisese within thehe files that ararding the loc

ects.

er properties

er and Descripa such as 000

s is only if thee project strure generally ication of the

s that are to b

Page 4

ption can 00.

e reports cture to n this related

be project

Page 5: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

PTthP

PTdre

ETsc

DTs

PAd

AutoCAD Plant

P&ID DWThe P&ID’s arehe same way

P&ID’s, such a

Paths The P&ID DWGdesire. It will sequired.

Export and ImThe Export anetting these uentralized.

Data ManageThe Data Manubprojects.

P&ID Class DAll the P&ID Cdesign change

3D – Managing

WG Settinge best manag as the mode

as drawing tem

G Directory cstill need to b

mport Settind Import Settup as normal

er Configuranager Configu

Definitions Class definitioes under this C

g a Complete S

gs ged under theel will. What wmplates, and

an be left witbe accessed b

ngs tings can be sis required. T

ation ration can be

ns need to beCentral Proje

Site over Multi

e main projecwe have to be

variances in

thin the projey the sub pro

set up for theThe location o

e set to suit, a

e set as per act to prevent

ple Projects

t, although ne careful of heblocks that a

ect structure oojects so in a p

Central Projeof the Export

although this

ny normal prot any errors w

ot absolutelyere is differenre published

or located in place that all

ect, but can oand Import S

cannot be ce

oject, For P&with newly cre

y necessary. Tnces betweenin the projec

a more approusers have re

only be used iSettings .xml f

entralized for

&ID’s it is recoeated symbol

The P&ID’s win sub projectsts.

opriate place ead access to

in this projectfiles cannot b

use with any

mmended tols in a sub pro

Page 5

ill work in s for the

if you o is

t, so be

y

o keep all oject.

Page 6: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

P

ETsc

PTlo

T

TdA

AutoCAD Plant

Plant 3D D

Export and ImThe Export anetting these uentralized.

Paths The Plant 3D mocation.

The Spec shee

The orthograpdefined by whAll the other o

3D – Managing

DWG Set

mport Settind Import Settup as normal

model DWG d

ets directory i

phic output dihether there aoptions can b

g a Complete S

tings

ngs tings can be sis required. T

directory can

s located as p

irectory can bare overall plae set as desir

Site over Multi

set up for theThe location o

be contained

per normal…e

be either centant layouts aned.

ple Projects

Central Projeof the Export

d within the C

either central

tralized or prnd sections, a

ect, but can oand Import S

Central Projec

lized or withi

oject specificand also proje

only be used iSettings .xml f

ct structure o

n the project

c. The optionsect specific O

in this projectfiles cannot b

r in a more a

structure.

s for each willOrthographic d

Page 6

t, so be

ppropriate

l be drawings.

Page 7: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

AutoCAD Plant 3D – Managingg a Complete S

Site over Multiple Projects

Page 7

Page 8: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

L

C

PHfi

PA

AutoCAD Plant

Link othe

Creating the

Project SetupHere, we onlyile for the set

Project SetupAs normal we

3D – Managing

r AutoCA

Sub Project

p Wizard (Pa have to reme

ttings.

p Wizard (Pacannot selec

g a Complete S

AD Plant 3

t

age 1 of 6) –ember to sele

age 2 of 6) –t any differen

Site over Multi

3D Projec

– Specify Genect “Copy set

– Specify Unint units than t

ple Projects

cts Into th

neral Settingtings from ex

t Settings the Master P

he Main S

gs xisting project

roject.

Site Proje

t”, and select

ect

t the Master P

Page 8

Project.xml

Page 9: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

PFh

PInPI

AutoCAD Plant

Project SetupFor the locatiohere the P&ID

Project Setupn this section

Project. This ishave opted t

3D – Managing

p Wizard (Paon of the P&I

D’s from the M

p Wizard (Pa we make thes to make useo leave this in

g a Complete S

age 3 of 6) –D drawings, s

Master Projec

age 4 of 6) –e Plant 3D moe of the centrn the sub pro

Site over Multi

– Specify P&Iselect the samct can be used

– Specify Planodel DWG diralized 3D Mo

oject to make

ple Projects

ID Settings me folder as ind to place 3D

nt 3D directrectory and thodel and Pipin

sure I have p

n the settingscomponents

tory settingshe Spec sheetng Specs. Withproject specifi

s of the Mast.

s ts directory thh the Orthogic Orthograph

er Project. Th

he same as thraphic outputhic drawings.

Page 9

his way

he Master t directory,

Page 10: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

PHedst

PS

GR

AutoCAD Plant

Project SetupHere we can seither of the ddatabases bettandalone. Th

Project SetupSelect Finish.

Getting thRight mouse c

3D – Managing

p Wizard (Paselect our datdatabase typetween the Mahe databases

p Wizard (Pa

he P&ID’sclick and selec

g a Complete S

age 5 of 6) –abase type a

es with the suaster Project a are built by w

age 6 of 6) –

s and Moct Copy Draw

Site over Multi

– Specify datand location if

ub project. Wand the Sub Pwhat is in the

– Finish

odels intoing to Project

ple Projects

abase settinf we opt to use complete thProjects are ne model.

o the Sub t…

ngs se the SQL Sehe data in thi

never linked t

Project

rver. There ais section as ptogether. The

re no issues wper normal. Tey are entirely

Page 10

with using The y

Page 11: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

S

RAo

AutoCAD Plant

Select the P&I

Repeat the prAlthough all mof the Sub Pro

3D – Managing

D’s to add to

ocess for the models can beoject.

g a Complete S

o the project.

3D Models, re added to the

Site over Multi

You may only

rememberinge project with

ple Projects

y need to add

g to only takeh no problem

d the P&ID’s t

the files thatms, we are con

that are relev

t are relevantnsidering data

vant to the Su

t to the Sub Pabase size an

Page 11

ub Project.

Project. d simplicity

Page 12: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

Ath

S

AutoCAD Plant

Any models thhe external re

Some of the e

3D – Managing

hat have Exteeferences to t

xternal refere

g a Complete S

rnal Referencthe project.

ences will sho

Site over Multi

ces will have a

ow up in the f

ple Projects

a dialog box p

following me

pop up. You m

ssage box, ju

must select th

st push OK. T

he first option

This can be ign

Page 12

n to add

nored.

Page 13: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

A

N

S

PAyre

AutoCAD Plant

As with the fo

Now the proje

Set sub pr

Project DetaAny of the Cusyou add any nemain projec

3D – Managing

llowing mess

ect manager w

roject spe

ils stom Propert

new propertiect specific to e

g a Complete S

sage, just pus

will show the

ecific pro

ies in this seces; these will enable the dif

Site over Multi

h OK.

files that you

operties t

ction can be cnot appear infferences bet

ple Projects

u have selecte

to not int

changed withn the Master Pween the pro

ed to be in th

erfere wi

out any effecProject or anyojects.

he Sub Project

ith the m

ct on the Masy other sub p

t.

main proje

ster Project dproject. These

Page 13

ect.

atabase, if e properties

Page 14: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

PAPm

Fthth

S

RR

AutoCAD Plant

Plant 3D ClasAny new propProject, providmake the prop

For example, the Sub Projeche Status pro

Set up rep

Report SettinReports are sa

3D – Managing

ss Definitionperties that yoded that the pperty the sam

the Status proct. Anything

operty for the

ports bas

ngs aved in a cust

g a Complete S

ns Propertieou add in the property is un

me value for t

operty, for evg that is place

e same object

sed on th

tom location s

Site over Multi

s Sub Project u

nique to the She Sub Projec

verything in thed in the Sub as new.

e main p

so they can b

ple Projects

under Plant 3Sub Project. Ict and the Ma

he Master PrProject is def

roject an

be accessed by

3D Class Definf the propertaster Project.

oject is set tofaulted to Ne

nd the sub

y any project

nitions will noty name is the.

o existing befoew. That way

bprojects

t.

ot affect the Me same, then

ore any workthe Master P

s.

Page 14

Master it will

k is done in Project has

Page 15: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

A

Tre

ETe

Bth

AutoCAD Plant

The names of eport for the

Edit Query To differentiatexample, Stat

By using the fihat has been

3D – Managing

the reports wMaster Proje

te the reportsus =‘Existing’

ilters in the recompleted in

g a Complete S

will need to bect.

s between thin the Maste

eports for then the Sub Pro

Site over Multi

e named to d

e Master Proer Project and

e Master Projject.

ple Projects

differentiate b

oject and Sub d Status =’New

ect or Sub Pr

between a re

Projects, usew’ in the Sub

roject you can

port that is fo

e the filters onProject.

n achieve rep

or a sub proje

n the propert

orts specific t

Page 15

ect and a

ties. For

to the work

Page 16: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

AutoCAD Plant 3D – Managing a Complete Site over Multiple Projects Page 16

SQL Server The decision to use SQL Server is driven by the number of users modifying project data at one time. The default database type, SQLite is valid for up to 2 TB per file, so the project file size is not the issue. Because the SQLite database is a single file, successful read/writes depend on fast access. When more users access the database at one time, they have a higher chance of hitting the database at the same time (or close enough).

Due to network configurations, server performance, computer performance, network loads, and a host of other factors, a precise number of users cannot be given. However, through experience with various clients, most people start to see performance degradation with between 6 - 10 users.

If you know you will have more than 10 active users, you should implement SQL Server Express or SQL Server.

You must also use SQL Server if you plan to use Plant 3D with Vault.

Database Types SQL Server – An enterprise-level product offering from Microsoft that includes a database server with administration tools for replicating databases between sites, and other advanced features

SQL Server Express – A free product offering from Microsoft that includes a database server without advanced administration tools. You can still configure backups.

SQLite – An open source file-based database used by developers world-wide. The database engine is fast with good performance.

Versions AutoCAD Plant 3D has been run with SQL Server 2005, SQL Server 2008, and SQL Server 2012.

Articles on setting up SQL Server Express and creating backups are available here:

http://www.pdoteam.com/series/plant3d-on-sql-express/

Page 17: A D® P Managing a lete Site over Multiple Projectshelp.autodesk.com.s3.amazonaws.com/sfdcarticles... · to place 3D t 3D direct ectory and th del and Pipin sure I have p the settings

AutoCAD Plant 3D – Managing a Complete Site over Multiple Projects Page 17

Vault Autodesk Vault (http://www.autodesk.com/products/autodesk-vault-family/features ) is document management software that integrates with many products in the Autodesk portfolio. In 2014, Vault became integrated into the Plant Project Manager.

Vault should be used in the following conditions:

• You have multiple sites that need to share data • Your Plant project structure contains all external references. • You can use SQL Server or SQL Server Express.

Vault allows you to store the drawing data in a central location, and have satellite offices check in/out drawings on an as-needed basis. Currently, all xrefs must reside within the project structure, as Plant uses it’s own working directory for Vaulted projects.