Introduction

• Glass occupies a prominent and very important place due increasing infrastructural development in growing India.

• The modern building is incomplete without a glass structure to protect as well beautification.

• These is a partnership firm between • 2 people namely• Mr Rahul, Mr Nevil, • Of which they have equal share and are from construction

business, architecture engineer, designer and glass manufacturer.

Page 3: a complete business solution

Product

• The plant is located near Karwar • Tuffen (Architectural)• Laminated (Reflection)• Safety (Thick)

Page 4: a complete business solution

process

• Batch mixing • Float bath • Coating • Annealing

Page 5: a complete business solution

CAPITAL PLAN Amount Sources of funds Rs Owner’s capital 10000000 Venture capital SBI Bank 40000000 TOTAL 50000000 Application of Funds Fixed Assets: Land & Building 10000000 Machinery 28000000 Transportation and equipment 2000000 40000000 Current Assets 5000000

Contingency 5000000 TOTAL 50000000

Page 6: a complete business solution

Capital plan

• Alpha premeiro is a partnership firm between Mr Rahul, Mr Nevil. who have pooled in a capital of 50 lakh each.• The plant is being acquired from an existing firm in karwar

for 1 crores.• And additional machinery worth Rs 1.8 crores.• The current asset includes cash and we do not give credit

on order placed. We have not avail any credit facility as of now.

• For transportation 5 vehicles have been bought at lease for 2000000rs for 2 years.

Page 7: a complete business solution

Employee detailsThe human resource requirement

• 5 unskilled employees a monthly pay of Rs 7000.2 skilled employees a monthly pay of Rs 10000

• Also have 1 administrator and designer.

Page 8: a complete business solution

• Production period• No. of shifts 1• Shift time 10hrs• Expected life expectancy • Of plant 20 years