BACKGROUND
ISS is an IT company stablished outside Egypt. It is a SoftWare company interests in Oracle Applications.
The Owners of ISS were thinking about expanding there work by establishing ISS in Egypt (ISSEG) with Egyptian partner's.
Several meeting were held for this purpose at SHIRATON CAIRO.
The following is a real presentation in this context. SDM Methodology was utilized to give insights while negotiation.
INTRODUCTION
To establish a frame work for ISSEG business strategy.
To limit the domain / scope of work.To organize our thoughts & ideas.To get the BEST time utilization.To decide on different issues.
TOPICS OF DISCUSSION session # 1
Mission statement for ISSEG.Vision statement for ISSEG.Environment of ISSEG.Goals of ISSEG.Business plan for ISSEG.
TOPICS OF DISCUSSION session # 2
Oracle partnership agreement.Appointing an accountant.Appointing a lawyer.Key personnel .Company formation.
TOPICS OF DISCUSSION session # 3
Site specs & selection criteria.Furniture specs & selection criteria.Computer system requirement.IT Graduates selection criteria.Training programs , Training policy.
TOPICS OF DISCUSSION session # 5
Budget (20-25 graduate trainees).Estimate funding requirement.Proposed size for investment.Shareholding & profit proposal.ISS role ,,,,,ISSEG role.Conclusion .
TOPICS OF DISCUSSION session # 1
Mission statement for ISSEG.Vision statement for ISSEG.Environment of ISSEG.Goals of ISSEG.Business plan for ISSEG.
MISSION STATEMENT FOR ISSEG
“ To Setup a pool of Oracle Software Specialists capable of consultation assignments as well as Performing a full or a part of Software development Cycle.”
VISION STATEMENT FOR ISSEG
“ Quantitative approaches , Methodologies , International standards , Recent tools , Commitment , Best utilization of resources ,,,, ,,,, ,,,, Become common terminology that everyone in ISSEG adopts in order to help him achieving his objectives.”
ENVIRONMENT OF ISSEG
There are many dimensions
of ISSEG environment. One approach is to view
ISSEG as follows :
ENVIRONMENT OF ISSEG (cot.)
The need for setting up such organization.
Strengths of ISSEG.Weaknesses of ISSEG.Threats facing ISSEG.Opportunities for ISSEG.
GOALS OF ISSEG
In the frame of the characteristics of the current situation in ISS, the mission statement ,the vision statement of ISSEG ,and the Environment of ISSEG ; there are three GOALS .
GOAL #0 (G0): TO ESTABLISH :
Mission statement ,vision statement , Goals ,
Policies , Procedures ,Adequate Organization ,Objectives , Scope of work , &Job analysis & Job description.
GOAL #1 (G1):
G1.1 : To select and establish a suitable site for ISSEG in Cairo.
G1.2 : To select and recruit IT graduates.
G1.3 : To select , acquire , and install computer system (H/W ,S/W, Cabling ).
GOAL #1 (G1) (cont.):
G1.4 : To group the employees into three categories : Oracle Financial , Oracle Tools , Web Applications Design.
G1.5 : To train them.
GOAL #2 : G2 :
G2.1 : To manage ISSEG in Cairo. G2.2 : To build a good
reputation.G2.3 : To maintain an
atmosphere of LOYALTY and BELONGING among the employees.
ISSEG BUSINESS PLAN
1. Site selection.2. Furniture acquisition.3. Computer system acquisition.4. Recruitment.5. Training.
ISSEG BUSINESS PLAN (cont.)
6. Mission Statement ,Vision Statement& Goals Establishment. 7. Policies & Procedures Establishment.8. Objectives , Scope of work , Job analysis & Job description Establishment.9. Organization Structure.
C1 C2 C3 C4 C5
1.1
SITE SELECTION
ISSEG BUSINESS PLAN 1
C1: site specs& selection criter.C2: avail. budget.C3: cash flow.C4: constraint(s).C5: ISS policy. I1.1 I1.2 I1.3 I1 :site offers I1.4 I1.5 I1.6 I1.7
specific site O1
contract(s) O2
SITE SPECS
1. Level : High ( IBM, Oracle, WTC) Medium. Poor.2. Meter square / man.3. No. of employees now / seen future.
CRITERIA FOR SITE SELECTION
C1.1 Location : Cairo down town / Heliopolis / New cities / Free zone.C1.2 Type ( business center / non )C1.3 Building features / facilities.C1.4 Rental VS owned.C1.5 Cost.
C1 C2 C3 C4 C5 C6
1.2
FURNITURE ACQUISITION
ISSEG BUSINESS PLAN 1
C1: site specs.C2: avail. budget.C3: cash flow.C4: constraint(s).C5: ISS policy. C6: furniture specs. I2.1 I2.2 I2.3 I2: furniture offs I2.4 I2.5 I2.6 I2.7
furniture O3
contract(s) O2
j
C7 C2 C3 C4 C5
ISSEG BUSINESS PLAN 1
C7: techn.dev.trendsC2: avail. budget.C3: cash flow.C4: constraint(s)C5: ISS policy.
I3: org. objectives I4: org. chart , funcs, respons. I5: environmentI6: users nature I7: computer offers
feasibility of auto O4detail descr/e.sys. O5logical des. /n.sys. O6new comp. sys.str. O7comp. sys. specs O8
COMPUTERSYSTEMACQUISITION
1.3
MAIN ACTIVITIES FOR COMPUTER ACQUISITION
Preliminary study of ISSEG. Feasibility study for automation. Requirement evaluation &
logical design. Computer system design &
specs. RFP preparation. Computer system eval.&
selection. Negotiation & contracting.
j
C8 C2 C3 C4 C5
ISSEG BUSINESS PLAN 1
C8: grad.eval. criterC2: avail. budget.C3: cash flow.C4: constraint(s)C5: ISS policy.
I8: advertise/specsI3: org. objectives I4: org. chart , funcs, respons. I5: environmentI6: users nature I9: candidates.
winner candidates O9
manpower dB O10
RECRUIT-MENT.
1.4
CRITERIA FOR CANDIDATES SELECTION
Total experience. Related experience. Education. Appearance. Oral comm. skills. Stability of current job Stability of total
experience.
Software skills. Hardware skills. LAN skills. Oral examination. Salary requirement. Others.