99 SPRING STREET STOREFRONT RENOVATION LANDMARKS PRESERVATION COMMISSION JULY 11, 2019 1

Upload: others

Post on 09-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

99 SPRING STREET STOREFRONT RENOVATIONLANDMARKS PRESERVATION COMMISSION

JULY 11, 2019 1

Page 2: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

SITE INFORMATION ZONING INFORMATION

SohoCast Iron Historic District

ManhattanDesignated: August 14, 1973

Soho-Cast Iron Historic District

Historic District Boundaries

99 SPRING STREETLot SF: 1,875 sq ftZoning District: M1-5BBlock & Lot: 498-26Building Dimensions: 25’ x 75’Stories: 6

BUILDING OWNER:Ashap Realty LLP152 East 65th StreetNew York, NY 10065

BLOCK PLAN

LOCATION OF WORK:99 SPRING STREET

99 SPRING STREET BLOCK 498, LOT 26ZONING DIST. M1-5BZONING MAP 12C

2

Page 3: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

TAX PHOTOS

1940 19803

Page 4: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

ADDITIONAL PHOTOS

ca. 1975 20194

Page 5: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

99 SPRING STREET 96 SPRING STREET101 SPRING STREET

NEIGHBORING BUILDINGS

(EXISTING)5

Page 6: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

VIEW DIAGRAM VIEW A VIEW B

STOREFRONT VIEWS

AREA OF PROPOSED WORK:99 SPRING STREET - FACADE AREA OF PROPOSED WORK

6

Page 7: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

99 SPRING STREET

EXISTING BUILDING FACADE

7

AREA OF PROPOSED WORK

Page 8: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

99 SPRING STREET

PROPOSED STOREFRONT

8

Page 9: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

FRONT FACADE: EXISTING FRONT FACADE: PROPOSED

9

AREA OF PROPOSED WORK

Page 10: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

LOBBY - EXISTING/DEMO PLAN LOBBY - PROPOSED PLAN

10

SPRING STREET SPRING STREET

101SPRINGSTREET

101SPRINGSTREET

96SPRINGSTREET

96SPRINGSTREET

AREA OF PROPOSED WORK

Page 11: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

ENLARGED RENDERED ELEVATION: EXISTING ENLARGED RENDERED ELEVATION: PROPOSED

11

Page 12: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED

12

AREA OF WORKGLASS

CAST IRON

CONCRETE PAINTED WOOD

BRICK METAL TRIM

PAINTED STEEL

BLACK TILE

STUCCO

Page 13: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

ENLARGED ELEVATION: EXISTING ENLARGED ELEVATION: PROPOSED

STUCCO TO BE CONCEALED NEW LEADED GLASS AND METAL TRANSOM TO MATCH EXISTING

FRONT LAYER:

NEW PAINTED MARINE GRADE PLYWOOD TO OVERCLAD EXISTING STUCCO, BRICK, AND ELEVATOR DOOR

REAR LAYER:

NEW FIXED CLEAR TRANSOM IN METAL FRAME TO MATCH EXISTING

NEW GLASS, METAL WINDOW, AND BASE TO MATCH EXISTING DISPLAY WINDOW. OPERABLE TO PROVIDE ACCESS BEHIND

CONCRETE TO MATCH EXISTING AT RETAIL DISPLAY BAY

FLUSH CYLINDER LOCK

ELEVATOR TO BE CONCEALED

BRICK TO BE CONCEALED

CONCRETE TO BE REMOVED

EXISTING TO REMAINEXISTING TO REMAIN EXISTING TO REMAINEXISTING TO REMAIN AREA OF WORKAREA OF WORK

13

Page 14: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

FACADE : AXONOMETRIC VIEWS

16'-9

1 2"

10'-1

01 2"

1'-1

03 8"

3'-1

01 8"

2'-1

"9'

-01 8"

16'-9

1 2"

-0'-3 14"

TYP

2

LM-103

2

LM-103

-0'-1 38"-0'-1 3

8"

PAINTED PLYWOOD AND MOISTURE RESISTANT

GYPSUM WALL BOARD PANELS AND CONCEALED DOOR

GLASS & METAL SHOW WINDOW AND TRANSOMS

OPE

RABL

EFI

XED

14

Page 15: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

FACADE : AXONOMETRIC VIEWS

CLOSED WINDOW FACADE OPENED WINDOW FACADE

15

Page 16: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

FACADE : AXONOMETRIC VIEWS

CLOSED WINDOW FACADE OPENED WINDOW FACADE

16

Page 17: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

FACADE : REFERENCE DETAILS

EXISTING FACADE

EXISTING TO REMAIN EXISTING TO REMAINAREA OF WORK

17

Page 18: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

STOREFRONT SECTIONS

SECTION A SECTION B SECTION C

A B

A C

EXISTING ELEVATION

PROPOSED ELEVATION

18

Page 19: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

SECTION DETAILS

SECTION A SECTION B SECTION C

A B

A C

EXISTING ELEVATION

PROPOSED ELEVATION

19

Page 20: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

STOREFRONT PLANS

PROPOSED PLAN

EXISTING PLAN

20

Page 21: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

PLAN DETAILS

PROPOSED FREIGHT ELEVATOR ENTRY PLAN

EXISTING GALLERY WINDOW PLAN

21

Page 22: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

PLAN DETAILS

PROPOSED FREIGHT ELEVATOR ENTRY PLAN

EXISTING FREIGHT ELEVATOR ENTRY PLAN

22

Page 23: 99 SPRING STREET STOREFRONT RENOVATION July...© 2019 MATERIAL STUDY: EXISTING MATERIAL STUDY: PROPOSED 12 AREA OF WORK GLASS CAST IRON CONCRETE PAINTED WOOD BRICK METAL TRIM PAINTED

© 2019

99 SPRING STREET 96 SPRING STREET101 SPRING STREET

NEIGHBORING BUILDINGS

(PROPOSED)23