    Manual Testing

    Testing performed by human with out third party tool is nothing but manual testing.

    Or

    Test directly performed by the tester via keyboard, mouse inputs to the application under test is

    nothing but manual testing.What is testing?

    Testing is a process of verifying the s/w to check whether it fulfills the requirements or not with the

    intent of finding errors.

    Or

    Testing is nothing but detection it is a process execution of application in controlled manner with

    the intent of finding errors.

    Or

    To ensure that our application is working according to the customer requirements or not.

    RequirementsMs word, excel sheet for writing test cases, bug reports, and build for testing thats all.

    What is the purpose of testing?

    To get the quality product.

    To detect the bugs.

    To gain confidence in the s/w.

    To reduce the rework.

    Customer will be able to get his work done

    To ensure that complete functionality is implemented.

    What is quality?

    A quality product is bug free, delivers on time, with in budget, meets the customer requirements,and maintainable.

    Why quality?

    1) To reduce the rework.

    2) To satisfy the customer requirements

    What is maintainable?

    Whether the s/w is easy to maintain in production and if any problem is occurred it can be solved

    easily with less efforts and less cost.

    Qualities of testers

    1. Test breaking attitude2. Take customer point of view

  • 8/14/2019 7950985 Testing Notes

    2/31

    3. To maintain good communication of with developers

    4. Should have good knowledge in SDLC

    5. Should be able to report technically

    When you start testing?

    After getting the SRS document then we will prepare test cases while developers are preparingcoding we are preparing the test cases and after releasing the build from them then we will go for

    execution.

    When to Stop Testing?

    This is very difficult to determine. Many modern software applications are so complex, and run in

    such as interdependent environment

    So, common factors are in deciding when to stop testing.

    Deadlines (release deadlines, testing deadlines.)

    Test cases completed with certain percentage passed. Test budget is depleted

    Coverage of code/functionality/requirements reaches a specified point

    The rate at which Bugs can be found is too small

    Beta or Alpha Testing period ends

    The risk in the project is under acceptable limit.

    Quality Control:

    A set of activities designed to evaluate a developed work product.

    Or

    All those necessary steps taken for fulfilling the requirements of quality.

    QUALITY CONTROL measures the quality of a product

    Quality AssuranceAll those planned and necessary ideas to provide adequate confidence that the product/service will

    satisfy the given requirements of quality.

    QUALITY ASSURANCE measures the quality of processes used to create a quality product

    What is difference b/w QA and QC?

    Q. A Q.CIt is verification process it is validation process

    It prevents the problems it identifies the problems

    Prepare the test plan implement the test planVerifies the reports generates the reports

    Software Requirements Specification (SRS) document, containing:

    http://www.onestoptesting.com/introduction/test-stop.asphttp://www.onestoptesting.com/introduction/test-stop.asp
  • 8/14/2019 7950985 Testing Notes

    3/31

    Introduction

    Purpose

    Scope Major Constraints and References

    Functional Requirements

    Context Diagram Functional Decomposition Diagram

    System Functions

    Database Requirements User Interface Requirements

    External Software Interface / Compatibility Requirements

    Reports Requirements

    Security Requirements Use Case Specifications

    Acceptance Criteria

    Project Manager: (roles, responsibilities)

    Preparation of Software Requirements Specification (SRS)

    Formation Development Team, Test Team

    Management of requirements through out the project life cycle activities

    Preparation of Detailed Design Document

    Unit Test cases and Integration Test cases

    Guidance on programming and related coding conventions / standards

    QA Manager:

    Preparation of System Test Plan

    Formation of Test Team

    Schedule Preparation

    Module Allocation

    Reviews on Test Process

    Client Interaction

    Verify Status Reports

    Test Team (Testers & Test Lead):

    Testing, is the core competence of any Testing Organization.

    Understand the Application Under Test

    Prepare test strategy

    Assist with preparation of test plan.

    Design high-level conditions

    Develop test scripts

  • 8/14/2019 7950985 Testing Notes

    4/31

    Understand the data involved

    Execute all assigned test cases

    Record defects in the defect tracking system

    Retest fixed defects

    Assist the test leader with his/her duties

    Provide feedback in defect triages

    Automate test scripts

    Understanding of SQL

    What is verification &validation?

    V&V is process that helps to determine if the s/w requirements are complete, correct and if s/w of

    each development phase fulfills the requirements and conditions, imposed by previous phase etc.

    Verification is typically involves reviews, plans, meetings and to evaluate documents, plans,

    code requirements & specifications this can be done with the help of check lists issue lists, walkthrough &inspection meetings

    Validation typically involves actual testing and it will be started after completion of verification.

    12.What is verification? validation?

    Verification and validation (v&v) is a process that helps to determine if the s/w requirments arecomplet, correct and if the s/w of each development phase fulfills the requirements and conditions,imposed by the previous phase etc.Verification typically involves reviews and meetings to evaluate documents, plans, code,requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and

    inspection meetings.Validation typically involves actual testing and takes place after verifications are completed.

    Verification requires several types of reviews, include Requirement Review, Code Walkthroughs,

    Code Inspections, Design reviews, reviews of reviews....The system users (Developers) will involvein these reviews to find the defects before they build a system. Some of the examples we discussed

    below please check that one. For Effective Development process each verification example is linked

    with another (It also depends up on the type of project...)

    Validation is accomplished simply by executing a real-life functions (For Example if you check the

    bulb working or not , then you should switch on ...) .Here also validations examples are linked witheach other, one's out put effective input of another validation( depends up on the project type)

    Verification answers the question, Are we building the right Product?

    Validation addresses, Are we building the Product Right?"

    {Depend up on the project type, verification examples are will vary... Below are some standard

    examples}

  • 8/14/2019 7950985 Testing Notes

    5/31

    Verification Examples:-

    Verification

    ExamplePerformed by Deliverable

    RequirementReview Developers,Customer Review statement of requirements ready to betranslated in to system

    Design Reviews DeveloperSystem Design and configuration document is ready

    for computer program

    Code

    WalkthroughsDevelopers

    Computer software ready for testing or ready for more

    detailed inspection

    Code Inspections DevelopersComputer software is ready for testing by developersand Testers

    Validation Examples:-

    ValidationExamples

    PerformedBy

    Deliverable

    Unit Testing Developerssoftware unit is ready for testing with other unit or

    components.

    Integrated Testing DevelopersPortions of the system ready for testing with other

    portions of the system.

    System Testing Testers A Tested computer system, based on what was specified

    User Acceptance

    TestingUsers Tested computer system based on the user needs ...

    Summary:

    1. Verification and Validation are very essentials in the software testing.

    2. It starts when Project starts.3. It minimizes the cost of testing.

    4. Verification is non executable method.

    5. Validation is physically executed method.

    What is a 'walkthrough'?

    A 'walkthrough' is an informal meeting for evaluation or informational purposes. Little or no

    preparation is usually required.

    Or

    It is an informal meeting for information purpose. No preparation is required .just sharing the ideas.

    People Involved

    The following people attended the meeting:

  • 8/14/2019 7950985 Testing Notes

    6/31

    Architect. The architect organized and chaired the meeting. He wanted to create a threat

    model early in the design phase, to influence subsequent design decisions.

    Business Analyst. The business analyst was invited to the meeting to answer and clarifyquestions regarding the security objectives and primary use cases. Note that the business

    analyst is an optional attendee and might not be required if the architect can answer the

    questions. Developer. The developer wanted to understand the security implications of various design

    and implementation choices.

    TestLead. The test lead was invited to the meeting because the architect wanted the threatmodel to help define the test strategy. The test lead wanted to know where to focus his

    security testing.

    Note:This meeting did not involve any operations or network staff. Make sure you know

    your operational constraints. If necessary, check with your IT staff about relevant corporatepolicies or other infrastructure constraints.

    Meeting Guidelines

    The architect outlined the following meeting guidelines:

    The meeting was to be limited to one hour.

    A single nominated person would take notes. In this case, the developer was asked to take

    notes. The team would record issues that needed to be taken offline for further discussion.

    The architect specified the amount of time he wanted to spend on each step so that the meeting

    would complete in an hour. He wanted steps 1, 2, and 3 to be completed in approximately 20

    minutes and the rest of the meeting time to be spent on threat and vulnerability identification. He

    also allowed time for a five-minute meeting wrap-up.

    What's an 'inspection'?An inspection is more formalized than a 'walkthrough', typically with 3-8 people including a

    moderator, reader, and a recorder to take notes. The subject of the inspection is typically a document

    such as a requirements spec or a test plan, and the purpose is to find problems and see what'smissing, not to fix anything. Attendees should prepare for this type of meeting by reading thru the

    document; most problems will be found during this preparation. The result of the inspection meeting

    should be a written report. Thorough preparation for inspections is difficult, painstaking work, but is

    one of the most cost effective methods of ensuring quality. Employees who are most skilled atinspections are like the 'eldest brother' in the parable in 'Why is it often hard for management to get

    serious about quality assurance?'. Their skill may have low visibility but they are extremely valuable

    to any software development organization, since bug prevention is far more cost-effective than bug

    detection.

    Testing types

    What white box testing?

    It is nothing but testing the structural part of application.

  • 8/14/2019 7950985 Testing Notes

    7/31

    Or

    It is a testing approach that examines the application program structure and derives test cases from

    the application program logic.

    This is also called

    open box testing

    or structual testing

    or clear box testing

    or glass box testing

    It is purely taken care by developers or development dept.

    To perform this testing s/w awarness is required.

    To perform this testing intermediate code manual is required.

    During this testing test engineers has to follow WBT techniques.

    WBT techniques:

    these are 3

    1. execution testing:

    What is black box testing?

    It is nothing but testing the functional part of application. No need of knowledge of internal logic of

    code.

    Unit testing

    The testing of individual software components

    Or

    Testing the individual functionality of the application is nothing but unit testing.

    Module testing

    Testing the combined functionalities of an application is nothing but module testing.

  • 8/14/2019 7950985 Testing Notes

    8/31

    Integration testing

    Testing the combined modules of application is nothing but integration testing.

    Exhaustive testing

    The last executable statement within a component.

    What is base line document? Can u say any two?

    Which documents certified o/p of one stage passed on to another stage is nothing but base linedocument.

    E.g.: the 1st version of SRS is considered as a base line document.

    What is SDLC? And STLC?

    SDLC stands for s/w development life cycle. It specifies how exactly u develop a s/w through

    various steps and procedures followed to develop a s/w is nothing but SDLC.

    (Or)

    It begins when s/w 1st time introduced and ends when s/w is no longer in use.

    STLC stands for s/w testing life cycle. It specifies how performed to achieve quality and found bugs

    with a systematic procedure is nothing but STLC.

    (Or)

    It begins at ending of the requirement phase means at design level and ends when s/w is no longerin use.

    What kinds of testing u have done?

    Usability, functionality, Regression testing, little bit involved in Database testing.

    What is out come of testing?

    A quality product.

    What type of testing tester do?

    Black box testing such as usability, functionality, data base testing, regression like that.

    After completion of testing what would u deliver to the client?

  • 8/14/2019 7950985 Testing Notes

    9/31

    Test plan document

    Test scenarios documents

    Test case document

    Defect reports

    Status reports (monthly, weekly, daily)

    Test scripts

    Project/product sign off document.

    What is test case?

    Test case is a document which describes INPUT, ACTION, EVENT and EXPECTED RESPONSEto determine if feature of an application is working correctly or not.

    Test case is a sequence of steps to test the correct behavior of a functionality/feature of anapplication.

    It is nothing but a document which contains a set of inputs and executions results based on

    conditions to determine a feature of an application.It is purely taken care by testers

    By taking the help of test cases we can test whether the application is properly working or not.

    Status

    Pass

    Fail

    What is good test case?

    In my view Which test case covers maximum functionalities, finding the faults effectively, easy to

    use, ease to understand, does not do unnecessary things is called as good test case.

    Entry criteria

    Approved test plan

    Requirement specification

    ECP& BVA prepared

    Test case template

    Any design documentExit criteria

    Test case should reviewed and approved.

    It is a document which contains a set of possible inputs and executions for expected results based onconditions to determine a feature of application.

  • 8/14/2019 7950985 Testing Notes

    10/31

    Uses

    By taking the help of test cases we can test whether the application is properly working or not.

    What is a good test case?

    A good test case is one that has a high probability of finding an as yet undiscoveredarea.

    Which one (minimum test cases) covers maximum functionalities is called as good test case.

    Or

    A good test case is has not more than steps and cover more functionality in a single shot.

    A good test case satisfies the criteria means:

    Finding faults efficiently

    Easy to maintain

    Cheap to use

    Easy to understand and does not do unnecessary things.

    How will u prepare test cases?

    By using docs. Like BRS, CRS, SRS (through requirements) we prepare use cases by using use

    cases we prepare test cases.

    How u prepare good test case?

    Each and every company follows their own format for test cases. But the final aim is to cover all the

    functionality to test the project.

    How will u check that Ur test cases are covered all requirements?

    By using traceability matrix (TRM)

    What is TRM? And CRM?

    It is showing the relationship b/w requirements& corresponding test cases.

    Or

    It is mapping b/w requirements & test cases.

  • 8/14/2019 7950985 Testing Notes

    11/31

    CRM means Cross Reference Matrix

    It is mapping b/w requirements &maps (design maps).

    Like I mean

    Minimum number of test cases =no. of inputs*1.6

    E.g.: suppose u have a web page for addition of two numbers

    Then u have input 1:

    Input 2:

    Sum:

    In this form we have two input objects (input 1, input 2)

    So, minimum test cases for this form will be

    Test cases=input object 1*1.6= (i.e.) 2*1.6=3.2(minimum of test cases it should have is 3) but max

    can vary.

    What is Test scenario?

    Test scenario represents a series of actions that are associated together from initiation stage to

    completion

    Means it specifies overall view of one object total functionality.

    Entry criteria:

    approved test plan

    requirments specification (or) SRS

    any design document

    test scenario template

    Exit criteria:

    test scenario should be reviewed and approved.

  • 8/14/2019 7950985 Testing Notes

    12/31

    What is an Entry criteria?

    It is a condition which input of the phase as to satisfy to get entry into the phase is nothing but entry

    criteria.

    What is an exit criteria?

    It is a condition which output of the phase as to satisfy to get exit from the phase is nothing but exitcriteria.

    What is test data?

    A set of values are used in test or that are necessary to execute the test based on test case

    requirements we will prepare the test data.

    What is an error?

    A mistake in coding is called as an error.

    What is defect or issue?

    This error is found by test engineer during the testing period that is called defect or issue.

    What is bug?

    This defect or issue is accepted by development dept. or developer is called as bug.

    What is fault?

    A manifestation of an error in s/w. A fault. An incorrect step, process, or data definition in acomputer program

    What is failure?

    The inability of a system or system component to perform a required function within specified

    limits. A failure may be produced when a fault is encountered.

    Top to down testing

    With out presence of sub modules testing the application by using the main module is called as top

    to down testing.

    Stub

    Instead of sub module we need to take the help of temporary programs is called stub.

  • 8/14/2019 7950985 Testing Notes

    13/31

    Bottom to top testing

    Without presence of main module testing the application by using sub module is called as bottom to

    top testing.

    Drivers

    Instead of main module we have to use temporary program is called as driver.

    Sand witch testing

    The combination of top to down &bottom to top approaches is called as sand witch testing.

    This is the final stage of integration testing.

    Static testing

    Verification performed with out executing the systems code. It is also called as static analysis.

    Or

    With out executing the test functionality is called as static testing.

    E.g.: GUI, Usability

    Dynamic testing

    Verification &validation performed which executes the systems code is called as dynamic testing.

    Test driver or test harness

    A program or test tool used to execute tests. It is also known as test harness.

    What is end to end testing?

    It is nothing system testing. The term system testing means the combination of functionality testing&non functionality testing.

    Defect leak

    The defect which can be found and reproduced by end user/client people the same we (test

    engineer) unable to found at the time of testing. This is also called as defect leakage.

    Black box testing techniques:

    1. Equivalence partitioning

  • 8/14/2019 7950985 Testing Notes

    14/31

    2. Boundary value analysis

    3. Cause-effective graphing

    4. Error guessing

    Equivalence partitioning: test the inputs would be selected from each portion of BVA.

    Boundary value analysis: testing the inputs at boundaries. Upper, lower

    Cause-effective graphing: a graphical representation of inputs and the associated out puts effects

    which can be used to design test cases.

    Error guessing:

    Smoke testing:

    Usability testing

    How is to understand &navigate the application is nothing but usability testing.

    Re testing and Regression testing

    Retest: retesting means executing the test cases again on the same build like I mean which is

    already tested by providing multiple test data.

    Like max, min, -ve, +ve, zero, int, float etc.

    Regression testing: means executing the same test cases on the modified build.

    Like I mean which is already tested when ever the changes are made or some new functionalities are

    add make sure that changes are not effected the previous functionality.

    Regression testing are two types

    Bug regression testing

    Functional regression testing

    For e.g.

    If there are 1000 test cases to be executed in the first build....And of the 1000 test cases, 100 fail and

    900 pass....

    suppose in 1000 test cases 3rd ,7th ,12th , 20th ..... like that upto 100 test cases are failed

    initially while we are executing the test cases(1000) the 3rd test case has failed then we will conduct

    retesting on that for clarification whether it is bug or not? Before sending the bug report with the

    status of'new'And the same way we will conduct retesting on the remaining failed test cases like7th , 12th , 20th .....

  • 8/14/2019 7950985 Testing Notes

    15/31

    Then after bug fixing whenever the modified build(2nd build) is received, FunctionalREGRESSIONTesting has to be done on the 900 test cases and the remaining 100 failed test cases

    are to be BugRegression testing. Suppose in that 3rd one has failed once again then we will do

    retesting for clarification whether it has been fixed or not? if it is not fixed before sending the bug

    with the status of 're-open'andbug regression testingon 100 testcases andfunctional regresssion

    testing on 900 test casesand on overall 1000 test cases we will conductingregression testing.

    Which is doing first retesting or regression testing?

    Retesting is first

    generally retesting starts from initial build(1st build) and regression testing starts from modified

    build(2ndbuild)

    Data volume testing or volume testing

    During this testing test engineers estimate the storage in terms of no. of records.

    Security testing

    Whether the application is providing privacy or not to the customer data.

    Storage testing

    Estimate the limit of storage in terms of bytes is nothing but storage testing.

    Authentication testing

    Testing life cycle

    preparation of test plan(unit, integration,...)

    design your test cases

    prepare test data and test procedures

    executing the test cases as per procedures

    prepare defect reports

    regression testing after verification defect fix

  • 8/14/2019 7950985 Testing Notes

    16/31

    How to track defect?

    Identify the test failure

    report defect

    fix the problem

    analyze the problem

    reproduce the problem

    problem complet

    SDLC

    What is SDLC?

    It specifies how exactly u develop a s/w through various steps and procedures followed to develop a

    s/w is nothing but SDLC.

    S/W project.

    S/w related problems are solved by s/w engineers through s/w engineering process are called as s/wproject.

    There are 6 phases

    1. information gathering

    2. analysis3. design

    4. coding

    5. testing

    6. release& maintenance

    Information gathering:

    In this phase business analysist gather the requirements and prepare the BRS.

    This time they verify whether the requirements are specified correctly or not and whether the

    customer is providing complete information or not.

    Analysis:

    In this phase sr.analysist or P.M. prepare the s/w RS document with the help of BRS.

    This document consists 2 sub documents

    1. system requirement specification (SRS)

    2. functional requirement specification(FRS)

    SRS contains the details of s/w, h/w, o/s

  • 8/14/2019 7950985 Testing Notes

    17/31

    FRS contains the details of functionality to be used in project.

    And also in this phase they verify

    Whether the customer requirements are achievable things or not

    And testable things or not

    And meets to the cost or not.

    Design:

    In this phase designer creates two types of documents

    1. HLD

    2. LLD

    HLD --- consists of main module of the project from root to leaf and multiple LLD mo0dules.

    LLD --- consists of sub modules of main module and along with flow diagrams, E.R diagramsprepared by internal designer.

    And also in this phase they verify

    Whether the HLD & LLD are defined correctly or not.

    Whether the HLD & LLDs are complete or not.

    Whether it is following any data flow diagrams & ER diagrams or not.

    Coding:

    The design must be translated into programming form (language)

    Programming language like C, C++ and JAVA like that are used for coding.

    Programming tools like compilers, interpreters, debuggers are used to generate the code.

    Specific type of application chooses the right programming language.

    Testing:

    Once the code is generated then the testing will be started by using diff.types of methodologies like

    WBT, BBT with the help of their techniques.

    WBT-- It is nothing but testing the structural part of application.

  • 8/14/2019 7950985 Testing Notes

    18/31

    BBT-- It is nothing but testing the functional part of application. No need of knowledge of internal

    logic of code.

    Release & maintain:

    After performing

    What is testing ?Testing is a process of verifying the s/w to check whether it fulfills the requirements

    or not with the intent of finding errors.

    What is quali ty?A quality product is bug free, delivers on time, with in budget, meets the customer

    requirements, and maintainable.

    BRS: The BRS defines the requirements of customer to be developed.

    SRS : The SRS defines the functional requirements to be developed and the system

    requirements to be used.

    Re views: A document level testing technique during this review, the responsible people are

    estimating the completeness & correctness of corresponding document.

    What is a 'w alkthrough'?A 'walkthrough' is an informal meeting for evaluation or informational

    purposes and is conduct by quality assurance people. In this they can see all the

    coding standard and also follow them in manually.. Little or no preparation is

    required. Also walkthrough does not have minutes of the meet. can happen at any

    time. no schedule such as.

    Walkthrough is there for both Testing and Coding.

  • 8/14/2019 7950985 Testing Notes

    19/31

    What's an 'ins pection'?An inspection is more formalized than a 'walkthrough', typically with 3-8 people

    including a moderator, reader, and a recorder to take notes. The subject of the

    inspection is typically a document such as a requirements spec or a test plan, and

    the purpose is to find problems and see what's missing, not to fix anything.

    Attendees should prepare for this type of meeting by reading thru the document;

    most problems will be found during this preparation. The result of the inspection

    meeting should be a written report. Thorough preparation for inspections is

    difficult, painstaking work, but is one of the most cost effective methods of ensuring

    quality. Employees who are most skilled at inspections are like the 'eldest brother'

    in the parable in 'Why is it often hard for management to get serious about quality

    assurance?'. Their skill may have low visibility but they are extremely valuable to

    any software development organization, since bug prevention is far more cost-

    effective than bug detection.

    What is verifi cation? valid ation?Verifi cation and validation (v&v) is a process that helps to determine if the s/wrequirments are complet, correct and if the s/w of each development phase fulfills

    the requirements and conditions, imposed by the previous phase etc.

    Verifi cation typically involves reviews and meetings to evaluate documents,plans, code, requirements, and specifications. This can be done with checklists,

    issues lists, walkthroughs, and inspection meetings.

    Valida tion typically involves actual testing and takes place after verifications arecompleted.

    Verifi cation answers the question, Are we building the righ t Product? Valida tion addresses, Are we building the Product Right? "What whi te box testing?It is nothing but testing the structural part of application.

    Or

    It is a testing approach that examines the application program structure and

    derives test cases from the application program logic.

    This is also called

    open box testing

  • 8/14/2019 7950985 Testing Notes

    20/31

    or structual testing

    or clear box testing

    or glass box testing

    There are 4 White Box Testing Techniques:

    1.Basis Path Testing

    2.Control Structure testing

    3.Program technique Testing

    4.Mutation Testing1.Basi s Path T esting:During this test the programmers concentrate on the execution of programs

    without any runtime errors. To conduct this test, the corresponding programmer

    follows the below approach.

    Write a program with respect to LLD (Low Level Design) Draw a flow graph for that program.

    Calculate cyclomatic complexity.

    Runt that program more than one time to cover all executable areas.

    Eg:

    - -------

    - -------- Condition

    If (?)-------

    ------- T F

    else

    -------

    -------

    --------

    -------- Cyclomatic Complexity =

    2(1+1)

    One should run the above program 2 times to cover all executable

    areas. A programmer gets confidence that a program is running only when the

    cyclomatic complexity is reached in running the programs designed.

    NOTE: The above program should be run 2 times

  • 8/14/2019 7950985 Testing Notes

    21/31

    One time to check whether if condition is satisfied or not

    Next time to check whether the else condition is satisfied or

    not, without any runtime errors.

    2. Control Struc ture Testing:During this test, the corresponding programmer concentrates on

    correctness of program execution in this test, they verify every statements of

    program execution. In this test, they verify every statements input state & Output

    state.

    Eg: Debugging

    3. Program Te chnique Te sting:During this test, the programmers concentrate on the execution

    speed of a program. If the execution speed is not reasonable, then programmers

    perform changes in the structure of the program without disturbing functionalityA B

    of the program.

    Eg: Swapping Program

    i. c=a;

    a=c+b;

    1. Us ability testing2. Functional T esting3. Non Functional Te sting1.Usabili ty Testing:In general, the separate testing team starts test execution with usability

    testing. During this test, the team concentrates on user-friendliness of the software

    build screens. The usability testing consists of 2 sub tests.

    a) User Interface Testingb) Manuals Support Testing

    a) User - interface Testing: -In User Interface Testing software build is tested for

    Ease of use (Understandability)

    Look & Feel (Attractiveness)

    Speed in Interface (Short navigations)

    These are applied on every screen in the software build.

    b) Manu als Support Te sting: -

  • 8/14/2019 7950985 Testing Notes

    22/31

    Also known as Help - documents testing. During this test, thetesting team concentrates on correctness & completeness of Help Documents /

    User Manuals.

    NOTE: In general, the testing team conducts User- interface testing & thenconducts functional & nonFunctional Tests. All the end of testing

    process, the testing team concentrates on Manuals Support Testing

    Receive build from development team.

    User Interface Testing

    (Usability Testing)

    Functional & Non Functional Testing

    Manuals Support Testing

    What is uni t testing?Testing the individual functionaity of an application is nothing but unit testing.Or

    testing the small part an application is nothing but unit testing.

    What is modu al tes ting?Testing the combined functioalities of an application is nothing but modual testing.

    What is integ ration testing?Testing the combined moduals of an application is nothing but integration testing.

    2. Functional Te sting:A Moderator testing level during which the testing team

    concentrates on customer requirements interms of functionality. During this test,

    the testing team applies below sub-tests on the software build.

    i) F unctionalit y Testingii) Sanita tion Testing

    i) F unctionalit y Testing: -During this test, the testing team concentrates on correctness of

    every functionality with respect to requirements. In this test, the testing team

    follows the below coverage.

    GUI Coverage / Behavioral Coverage

    (Changes in Properties of Objects in Screen)

    Error Handling Coverage

    (Preventing incorrect Operations)

    Input Domain Coverage

  • 8/14/2019 7950985 Testing Notes

    23/31

    (Taking correct size & type of Inputs)Manipulations Coverage

    (Returning correct output)

    Backend Coverage

    (The Impact of front-end screens operations on backend tables)

    Order of functionalities Coverage

    Sanit ation tes ting: -This is also known as Garbage Testing. During this test, the testing team

    identifies extra functionalities in the software build with respect to customer

    requirements.

    3. Non-Functionali ty T esting:A complex level in system testing during which the testing team

    concentrates on extra characteristics of the software.i. Recovery Testing

    ii. Compatibility Testing

    iii. Configuration Testing

    iv. Inter system Testing

    v. Installation Testing

    vi. Load Testing

    vii. Stress Testing

    viii. Data Volume TestingRecov ery Te sting: -It is also known as Reliability Testing. During this testing team

    validates that whether the software build changes from abnormal mode to normal

    mode.

    (Abnormal)

    Back up & Recovery Procedures

    Normal

  • 8/14/2019 7950985 Testing Notes

    24/31

    ii) Co mpatibility Testing: -Also Known as Portability Testing. During this test, the testing team

    validates whether the software build is running on customer expected platforms or

    not? Platforms are Operating Systems, Compilers, Browsers & Other system

    software.

    iii) Config ura tion Te sting: -It is also known as Hardware compatibility test. During this test, the

    testing team validates whether the software the software build is supporting

    different technologies, hardware devices or not?

    Eg: Different printer technologies, various network technologies, etc.

    Inter System Testing: It is also known END TO END Testing. During this test, the team

    validates whether the software build is co-existent with other software to share

    common resources or not?

  • 8/14/2019 7950985 Testing Notes

    25/31

    Install ation testing:During this testing test engineers validates how much space is occupied by the

    application and whether they validates the application is providing easy navigation

    steps to install. It is also called as port testing.

    What is load testing?The execution of our s/w build and the customer expected configuration and load

    to estimate the speed in processing is called as load testing. this is also called as

    scalability testing. scalability testing means that the no. of concurrent users.

    What is stress testing ?The execution of our s/w build and the customer expected configuration and morethan the customer expected load to estimate peak load is called as stress testing.

    What is soak t esting?When running a system at high level of speed for a prolong period of time this test

    executes several times more transactions in an entire day if the system may stop

  • 8/14/2019 7950985 Testing Notes

    26/31

    working after no. of transactions have been proceed due to memory leaks or other

    defects so, soak testing provide an opportunity to identify such defects.

    Data Volume Testing: -During this test, the testing team estimates the peak limit of data handled by

    our software build.

    Stora ge testing:during this testing test engineers estimates the limit of storage interms of bytes.

    Securi ty testing:During this testing test engineers validates whether the applcation is providing

    privacy or not to the customer's data( user operations)

    Au thentication testing:During this testing test engineers verifies whether the application is having loginscreen or not means whether our application is allowing valid users or not with

    login id and password.

    Acce ss control testing:it is used to check whether the user is having the permissions or not to access the

    data(services)

    eg: manager,adminidtrator, authentication user etc.are having the permisssions to

    accesss the data.

    Parallel Te sting: -It is also known as Comparative Testing or Competitive Testing. During this

    test, the testing team is comparing the recent software build with previous versions

    of the software build or with the competitive software in market to estimate

    competitiveness. This testing is only applicable to software products.

  • 8/14/2019 7950985 Testing Notes

    27/31

    Ad-hoc Te sting: -In general, every testing team conducts planned testing, but testing team

    adopts informal testing sometimes due to some challenges or risks.

    Eg: Lack of time, lack of resources, lack of team size, lack of skill, etc.

    This informal testing is also known as Ad-hoc testing. There are

    different styles in Ad-hoc testing.

    Buddy T esting: -A developer and a tester are working together as buddies t help each other to

    find out the defects early. Due to lack of time developers and testers are working

    together.

    Eg: 1:1 (or) 2:1 (or) 3:1 (preferable)

    or

    Due to lack of time, the management groups programmers & testers as

    Buddies. Every buddy group consists of programmers & testers.

    Pair T esting: -this test is done by 2 testers one is Sr. and another one Jr. in them to find thedefects on the same functionality, here Sr. tester is sharing his experience with Jr.

    tester (new)

    when the new tester has lack of knowledge on the or application

    or

    Due to lack of knowledge on project domain the management groups a senior tester

    & a Junior Programmers are developed and conducted testing, these all are called

    Pair testing.

    Mo nkey Testing: -Due to lack of time, the testing team concentrates on some of the main

    activities in the software build for testing. This style of testing is known as Monkey

    testing or Chimpanzee testing or Gorilla testing.

    Explora tory T esting: -

  • 8/14/2019 7950985 Testing Notes

    28/31

    Due to lack of proper documentation of the software being built, the test

    engineers depend on past experience, discuss with others, browse the Internet or

    Operate similar projects and contact customer side people if possible. This style of

    testing is called Exploratory Testing.

    or

    Exploratory testing is an approach in software testing with simultaneous learning,

    test design and test execution. While the software is being tested, the tester learns

    things that together with experience and creativity generates new good tests to run.

    Defect Seeding : -To estimate the efficiency of test engineers, the programmers add some bugs

    to the build. This task is called defect seeding / debugging.

    alpha testing(non- conve ntional):testing the application at the developer's site by the enduser.Beta testing(conve ntional):

    Testing the application at the customer's site by the customer.

    En cryption and decryption testing:it is purly taken care by the development dept. coding and decoding the data is

    called as encryption

    converting the data from one formate to another formate is called as decryption.

    Beau ty testing:user interface testing is also called as beau ty or cosmotic testin g.Sta tic testing

    Verification performed with out executing the systems code. It is also called as

    static analysis.

    Or

    With out executing the test functionality is called as static testing.

    E.g.: GUI, Usability

    Dynam ic testingVerification &validation performed which executes the systems code is called as

    dynamic testing.

    Sanity testing:Sanity testing is overall functionality oriented.Whether the released build isstable or not for further testing. It is also called as build acceptance

  • 8/14/2019 7950985 Testing Notes

    29/31

    testing(BAT).After receiving the initial build testing team conducts testing to find

    out whether the build is working or not. Which is the first testing technique applied

    on the build? To check the whether the build is acceptable for 1. All menu items are

    opening or not

    1. All menu items are opening or not

    2. All text boxes are accepting key board values or not.

    3. All objects are responding or not etc.

    When we get the initial build from the development team, we perform sanity

    testing. whether build is working properly interims of following factors Easy

    to understand, Easy to Operate, Short Navigations. With significant of s/w

    we have to apply this testing(new version)

  • 8/14/2019 7950985 Testing Notes

    30/31

  • 8/14/2019 7950985 Testing Notes

    31/31