App 7 - 21
7-2 Outline Design Drawings
List of Outline Design Drawings
No. Facility Title Page
A1 General General Facility Plan App 7 – 22
A2 General Planned Water Level Profile App 7 – 23
B1 Intake Intake Layout App 7 – 24
B2 Intake Intake Tower / Intake Pump App 7 – 25
B3 Intake Single Line Diagram (Intake Pump) App 7 – 26
C1 Water Treatment Plant Water Treatment Plant Layout App 7 – 27
C2 Water Treatment Plant Receiving Well / Flocculation (1) App 7 – 28
C3 Water Treatment Plant Receiving Well / Flocculation (2) App 7 – 29
C4 Water Treatment Plant Sedimentation (1) App 7 – 30
C5 Water Treatment Plant Sedimentation (2) App 7 – 31
C6 Water Treatment Plant Filtration (1) App 7 – 32
C7 Water Treatment Plant Filtration (2) App 7 – 33
C8 Water Treatment Plant Clear Water Reservoir (1) App 7 – 34
C9 Water Treatment Plant Clear Water Reservoir (2) App 7 – 35
C10 Water Treatment Plant Transmission Pump App 7 – 36
C11 Water Treatment Plant Single Line Diagram (Transmission
Pump)
App 7 – 37
C12 Water Treatment Plant Drying Bed App 7 – 38
C13 Water Treatment Plant Administration Building (1) App 7 – 39
C14 Water Treatment Plant Administration Building (2) App 7 – 40
C15 Water Treatment Plant Generator Plan App 7 – 41
D1 Reservoir Elevated Tank (700 m3) (1) App 7 – 42
D2 Reservoir Elevated Tank (700 m3) (2) App 7 – 43
D3 Reservoir Elevated Tank (600 m3) (1) App 7 – 44
D4 Reservoir Elevated Tank (600 m3) (2) App 7 – 45
E1 Pipelines (Main/Sub Mains) Air Valve, Blow Off, Sluice Valve App 7 – 46
E2 Pipelines (Main/Sub Mains) Pipe Bridge App 7 – 47
E3 Pipelines (Main/Sub Mains) Existing Structure Crossing App 7 – 48
PROJECT
SCALE
Pre
par
ator
y S
urv
ey o
n T
hak
hek
Wat
er S
up
ply
Dev
elop
men
t P
roje
ct in
Kh
amm
ouan
e P
rovi
nce
in
Lao
Peo
ple
's D
emoc
rati
c R
epu
bli
cN
ON
E
DRAWING No
DATE
DATE
Pla
nned
Wat
er L
evel
Pro
file
DESCRIPTION
PREPARED BY
APPROVE BY
NIH
ON
SU
IDO
CO
NS
UL
TA
NT
S C
O.,
LT
D.
Note:
There is a difference, 4.83m, between National BM and Original BM obtained from NPKMN.
Hence, the surveyed elevations (ground levels) shown in the drawing are 4.83m higher
than the exact elevations.
A2
NSC
App 7 - 23