6-switching technology session (1)
TRANSCRIPT
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 1/38
C-DOT MBM-XL OVERVIEW
S.K.TYAGIALTTC, Ghaziabad
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 2/38
Introduction
C-DOT MBM-XL OVERVIEW COVERS THEHARDWARE ARCHITECTURE AND FEATURESOF THE C-DOT MBM-XL SWITCHING SYSTEM
IT COVERS THE DIFFERENT USES OF THISSYSTEM IN THE NETWORK
CCS#7 & ISDN IMPLEMENTATION IN C-DOT
WILL ALSO BE DISCUSSED
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 3/38
C-DOT MBM-XL ARCHITECTURE
AM
BM
1
BM
n
CM
MDF
IOM
ADP
DISK TAPE VDUPRINTER
SUBSCRIBER LINES
ANALOG TRUNKS
DIGITAL TRUNKS
DIGITAL LINKS
FORM RSUs
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 4/38
C-DOT SBM-XL
LINE MODULE BASE MODULE LINE MODULE
Time Switch Unit
Base Processor Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal UnitTerminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 5/38
C-DOT MBM-XL
BASE MODULE CENTRAL MODULE BASE MODULE
Administrative
Processor Unit
Space SwitchControl Unit
Space Switch
Unit
Bus Termination
Unit
Space Switch
Unit
Bus Termination
UnitTerminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Terminal Unit
Base Processor Unit
Time Switch Unit
Terminal Unit
Terminal Unit
Base Processor Unit
Time Switch Unit
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 6/38
SUBSCRIBER FEATURES
Number Identification Service
Calling Line IdentificationPresentation(CLIP)
Calling Line IdentificationRestriction(CLIR)
Calling Line IdentificationRestriction Override
(CLIRO)
Malicious Call Identification(MCID)
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 7/38
SUBSCRIBER FEATURES
Call Offering SupplementaryServices
Call ForwardingUnconditional(CFU)
Call Forwarding Busy (CBF)
Call Forwarding No Reply (CNFR)
Call Completion Services
Call Waiting
Call Hold
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 8/38
SUBSCRIBER FEATURES
Multi - Party Services
Three Party Conference Multi Party Conference(Add-on
Card)
Miscellaneous Services Hot Line(Timed)
Hot Line (Without Time Out)
Reminder Call/Alarm Services
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 9/38
SUBSCRIBER FEATURES
Subscriber Controlled Call Restriction Services Intrusion Barring Service
Dialling By Terminal Equipment Number
Trunk Offering
Queuing Service
Priority Subscriber
Distinctive Ringing For Long Distance Calls
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 10/38
SYSTEM FEATURES
Signalling, Routing And Charging Features
Exchange Operation Features
Exchange Maintenance Features
Software Upgradation & Patch Administration
Reconfiguration for Different Applications
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 11/38
P
SUII
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
T
I
C
S
PC / I
SP
T
U
I
T
U
I
S
PC / I
SP
T
I
C
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
L
CC / C
CM
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
ANALOG TERMINAL UNIT
*VACANT SLOT OF PSM/ESM FILLED BY CML CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 12/38
B
RL / P
RL
B
RL
B
RL / P
RL
B
RL
B
RL / P
RL
B
RL
B
RL / P
RL
I
TC1
I
CC1
I
IC1
I
IC0
I
CC0
I
TC0
B
RL
B
RL / P
RL
B
RL
B
RL / P
RL
B
RL
B
RL / P
RL
B
RL
B
RL / P
RL
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
INTEGRATED SERVICES DIGITALTERMINAL UNIT
*VACANT SLOT OF PSM/ESM FILLED BY CML CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 13/38
P
SUII
P
SUII
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
C
MLAO
O
C
MLAO
O
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
BUS TERMINATION UNIT
*VACANT SLOT OF PSM/ESM FILLED BY CML CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 14/38
P
SUII
P
SUII
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
C
MLAO
O
C
MLAO
O
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
BUS TERMINATION UNIT
*VACANT SLOT OF PSM/ESM FILLED BY CML CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 15/38
P
SUII
P
SUII
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
C
MLAO
O
C
MLAO
O
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
BUS TERMINATION UNIT
*VACANT SLOT OF PSM/ESM FILLED BY CML CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 16/38
P
SUII
P
SUII
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
C
MLAO
O
C
MLAO
O
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SM / E
SM
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
BUS TERMINATION UNIT
*VACANT SLOT OF PSM/ESM FILLED BY CML CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 17/38
P
SUII
P
SUII
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
C
MLAO
O
C
MLAO
O
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
S
S
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
SPACE SWIYCH UNIT
*VACANT SLOT OF PSS FILLED BY CSL CARD
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 18/38
P
SUII
P
SUII
C
C
K
B
M
E
C
MLAO
O
C
B
X
N
S
C
H
PC / B
PC
C
MLAO
O
C
MLAO
O
H
PC / B
PC
N
S
C
C
B
X
C
MLAO
O
B
M
E
C
C
K
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
SPACE SWITCH CONTROLE UNIT
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 19/38
P
SUII
P
SUII
C
MLAO
O
C
MLAO
O
H
M
S
C
MLAO
O
C
MLAO
O
H
M
S
B
M
E
H
PC / B
PC
C
MLAO
O
C
MLAO
O
H
PC / B
PC
B
M
E
H
M
S
C
MLAO
O
C
MLAO
O
H
M
S
C
MLAO
O
C
MLAO
O
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
ADMN PROCESSOR UNIT
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 20/38
SIGNALLING UNIT MODULE
P
SUII
P
SUII
B
ME
S
HM8
S
HM7
S
HM6
S
HM5
H
PC / B
PC
T
UC
T
UI
T
UI
T
UC
H
PC / B
PC
S
HM4
S
HM3
S
HM2
S
HM1
B
ME
P
SUII
P
SUII
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
987654321 26
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 21/38
REMOTE SWITCH UNIT
REMOTE PRODUCTS
Remote Switch Unit(RSU) Remote Line Unit(RLU)
Remote Line Concentrator(RLC)
NEED FOR REMOTE SWITCH UNIT
Solution for Space for large exchanges
Reducing the cost on cables
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 22/38
REMOTE SWITCH UNIT
REMOTE SWITCH UNIT FEATURES
Power On Initialization Digital Trunk Link Status
Call Shifting During DTK Fault
Initialization In Stand Alone Mode
Initialization From RBMSA To Normal (RBM)Mode
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 23/38
REMOTE SWITCH UNIT
REMOTE SWITCH UNIT FEATURES
Support For Trunks In RBM Numbering Scheme In RSU
Support For Different Area Code In RSU and
Main Exchange
Provision To Block Local Calls Between MainExchange and RSU If RSU have Different
Area Code
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 24/38
REMOTE SWITCH UNIT
REMOTE SWITCH UNIT FEATURES
Emergency Services In RBMSA Mode Charging For RBM
Line To Line Call
Line To Trunk Calls
Trunk To Line Calls(I/C Terminating)
Trunk To Trunk Calls
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 25/38
REMOTE SWITCH UNIT RSU RELATED COMMANDS
CRE-RBMSA-CONFIGDISPL-RBMSA-CONFIG
MOD-RBM-XCOD
DISPL-RBM-XCOD
ADD-DTK-RBM
DISPL-RBM-DTKS
MOD-SUB-CRG
DISPL-SUB-CRG
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 26/38
C-DOT 256P AN-
RAX and RLCFEATURES
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 27/38
FEATURES Provides front end termination for PSTN subscribers
Supports maximum of 248 PSTN subscribers
Connected to Local Exchange (LE) over one or two E1 links
using standard V5.2 Protocol as per ITU-T specificationsG.964 & G.965 and ETSI specifications 300-324 & 300-347.
Provides First/Second Level of remoting
Provides a transparent link between subscriber and LocalExchange
Provides Calling Line Identification Presentation (CLIP) on 2ports of LCC card
Provides 16KHz Metering Pulse and Calling LineIdentification Presentation (CLIP) on 2 ports of each CCMcard
Provides Reversal on all 8 ports of CCM card
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 28/38
FEATURES
Password Protection Requires no air-conditioning
Low Power Consumption
Line Testing can be performed locally Transparently supports all subscribers
feature as supported by Local Exchange(LE)
For any feature related enhancements,the S/W changes are to be done onLocal Exchange (LE) only
(Contd.)
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 29/38
HARDWARE
Consists of two controller cards
AN RAX Controller Card (ARC Card)
AN RAX Interface Card (ARI Card)
ARC card supports 2 E1 links toward
Local Exchange Both the cards form a security block
alongwith respective SPC cards
Redundancy in Controller Cards
8 port LCC/CCM cards for SubscriberInterface
RTC card for testing of subscriber ports
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 30/38
256P RAX CARD FRAME CONFIGURATION
1 2 3 4 8765 13 14 15 161211109 21 22 23 2420191817
P
S
U
T
C
C
P
S
P
S
U
U
S
P
U
S
P
F
N
C R
T
C
SLAVE
FRAME
MASTER
FRAME
T
C
T
C
T
C
T
C
T
C TC
T
C C
T
C
T
C
T
C
T
C
T
C
T
C
T
Ø
Ø
R
S
C C
S
R
1
1
S
P
C
32 CH. PCM
TG 5 6TG {
COPY Ø 1COPY
{ TG 7 TG 8
Ø 1
Ø 1
T
C
T
CC
P
S
1
1
R
S
CC
S
R
Ø
Ø
S
P
CF
M
R
T
A
R
Ø Ø
R
A
P
1
R
A
P
1
R
A
TR
M
F
1
TG 1 2TG TG 43TG
TC :
RAP :RAT :
RTC :RSC :
SPC / ISP:
RMF :
LCC/TWT/EMF/RDT/CCM CARD
RAX ADMINISTRATIVE PROCESSORRAX ANNOUNCEMENT AND TONE CARD
RAX TERMINAL TEST CARDRAX SWITCH CONTROLLER CARD
SIGNALLING PROCESSOR CARD / INTEGRATED SIGNALLING PROCESSING CARD
RAX MULTI FREQ. CARD
C
T
C
T
C
T
C
T
25 26
C
T
C
T T
C
T
C
T
C
/
SLAVESLAVE
PSU-I : POWER SUPPLY UNIT-ICONFERENCE CARDCNF :
{ COPY ØMASTER
COPY 1MASTER
Ø
/
C
T
/
C
T
/
C
D
R
/
S
D
R
- - - -
- -
CARD DETAILS :
RAX WLL CONTROLLER CARDRWC:
W
R
C
/
C
C
R
W
/
TI
I I
I
/
P
S
I
/
P
S
I
P
I
S
/
I
S
P
/
\DESIGN\ANRX-UM\Argu-cf
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 31/38
256P AN-RAX CARD FRAME CONFIGURATION
1 2 3 4 8765 13 14 15 161211109 21 22 23 2420191817
P
S
U
T
C
C
P
S
P
S
U
U
S
P
U
S
PR
T
C
SLAVE
FRAME
MASTERFRAME
T
C
T
C
T
C
T
C
T
C
T
C C
T
C
T
C
T
C
T
C
T
C
T
C
T
Ø
Ø
A
R
I I
R
A
1
1
S
P
C
32 CH. PCMTG 5 6TG
{
COPY Ø 1COPY
{ TG 7 TG 8
Ø 1
Ø 1
T
C
T
CC
P
S
1
1
A
R
CC
R
A
Ø
Ø
S
P
C
TG 1 2TG TG 43TG
TC :
RTC :
SPC / ISP:
LCC/CCM CARD
RAX TERMINAL TEST CARD
SIGNALLING PROCESSOR CARD / INTEGRATED SIGNALLING PROCESSING CARD
C
T
C
T
C
T
C
T
25 26
C
T
C
T T
C
T
C
SLAVESLAVE
PSU-I : POWER SUPPLY UNIT-I
AN-RAX CONTROLLER CARDARC :
{COPY ØMASTER
COPY 1MASTER
- - - -
- -
CARD DETAILS :
I
I I
I
/
P
S
I
/
P
S
I
P
I
S
/
I
S
P
/
\DESIGN\ANRX-UM\Argu-cf
AN-RAX INTERFACE CARDARI :
C
T
C
T
C
T T
C
T
C
C
T
C
T
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 32/38
CONNECTIVITY TONETWORK
N
ETWO
RK
LocalExchange
C-DOTMBMOR
Other
MNCExchanges
DEC/R2/#7 V5.2 Interface
PrimaryLink
SecondaryLink
AN-
RAX 248 Subscribers
RS232
ConsoleVT-100
DIFFERENCE BETWEEN
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 33/38
DIFFERENCE BETWEEN
C-DOT RSU AND C-DOT AN-RAXC-DOT RSU C-DOT AN-RAX
• First Level of Remoting • First/Second Level ofRemoting
• Connected to LE through
Proprietory Protocol
• Connected to LE through
Standard V5 protocol• In standalone mode it performs
the various call processing &Billing functions
• In standalone mode it onlyfeeds the tone/ announcementto the subscriber
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 34/38
REMOTE LINE CONCENTRATOR(RLC) AS
ACCESS NETWORK
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 35/38
FEATURES
Provides front end termination
Supports maximum of 120 PSTN subscribers
Supports maximum of 56 ISDN BRA subscribers
Combination of PSTN & ISDN BRA subscribers. (Compatible
motherboard)
Connected to Local Exchange (LE) over two E1 links
Provides second level of remoting Provides a transparent link between subscribers and local
exchange
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 36/38
FEATURES Provides 16KHz metering pulse, Reversal and Calling Line
Identification (CLI) on all ports.
Provides Man Machine Interface (MMI) Password protection
Wall mountable (light weight)
Require no air conditioning
Low power consumption
Will provide HDSL connectivity in future
Compact in Size (19” packaging)
Line testing can be performed locally
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 37/38
C-DOT RLC CARD CAGE
MPU : MUX Power Unit to Provide Ring and Voltages
MTC : MUX Tester Card for Line Card Testing and to Provide announcement
MLC : MUX Line Card
MCS : MUX Control and Signaling Card ; E1 Link Termination and V5 Protocol Software
8/3/2019 6-Switching Technology Session (1)
http://slidepdf.com/reader/full/6-switching-technology-session-1 38/38
DIFFERENCE BETWEEN
RSU AND RLC
RSU RLC
• First level of Remoting • Second level Remoting
• Connected to LEthrough proprietoryprotocol
• Connected to LEthrough Standard V5protocol
• In 'Stand Alone' mode itperforms the variousCall Processing & Billing
Functions
• In 'Stand Alone' mode,it only feeds the tone tosubscribers